roofy

Violations at 2719 West 33 Street

Brooklyn, NY 11224 · BBL 3-06964-0002 · Back to the property

HPD housing violations

14 HPD violations, newest first.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 3rd room from north located at apt 7a, 7th story, 1st apartment from south at west

    Sep 3, 2020 · Apt 7A

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective porcelain glazed at bathtub in the bathroom located at apt 4a, 4th story, 1st apartment from south at west

    Aug 30, 2018 · Apt 4A

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west

    Aug 30, 2018 · Apt 4A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color wall at west in the 1st room from north located at apt 7c, 7th story, 1st apartment from west at north

    Nov 20, 2017 · Apt 7C

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at north wall aprox. 4 sq ft, at closet at private hall located at apt 7c, 7th story, 1st apartment from west at north

    Nov 20, 2017 · Apt 7C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 2nd room from north located at apt 6a, 6th story, 1st apartment from north at east

    Feb 2, 2016 · Apt 6A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer , the 3rd room from north, the 1st room from north at east, the bathroom located at apt 6a, 6th story, 1st apartment from north at east

    Feb 2, 2016 · Apt 6A

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from north at east

    Feb 2, 2016 · Apt 6A

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall, 1st door from south at west wall in the 2nd room from north located at apt 6a, 6th story, 1st apartment from north at east

    Feb 2, 2016 · Apt 6A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east located at apt 7b, 7th story, 2nd apartment from west at north

    Dec 1, 2014 · Apt 7B

    Closed — Violation closed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the private hallway located at apt 2e, 2nd story, 2nd apartment from south at west

    Oct 21, 2014 · Apt 2E

    Closed — Violation closed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 2e, 2nd story, 2nd apartment from south at west

    Oct 21, 2014 · Apt 2E

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak walls and ceiling in the bathroom located at apt 2e, 2nd story, 2nd apartment from south at west

    Oct 21, 2014 · Apt 2E

    Closed — Violation closed
  • ANon-hazardous

    Properly repair the source and abate the evidence of a water leak walls and ceiling in the private hallway located at apt 2e, 2nd story, 2nd apartment from south at west

    Oct 21, 2014 · Apt 2E

    Closed — Violation closed

DOB building violations

The newest 50 of 148 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 12, 2019

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Dec 11, 2019

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Dec 11, 2019

    Vp-violation unserved ecb-active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)

    Jun 1, 2016

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Construction other optional

    Due to a vehicle stricking the above location

    Apr 4, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4

    Dec 31, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed

ECB violations

The newest 50 of 108 ECB violations. The city keeps the complete history.

  • Class - 2

    Exit door not self closing properly at the time of inspection.at the time of inspection observed and noted at 1st floor level at kitchen exit(inside & outside)2 exit is not close properly at rear exit two exits

    Jun 9, 2025 · Penalty $625

    Resolve
  • Class - 2

    Failure to conduct or file a final inspection of permitted work with the department.noted atoi work under application#321490294 exp date 06/01/2024 completed.no sign off final inspection done for work issued.re

    Aug 12, 2024 · Penalty $6,250

    Active
  • Class - 2

    Failure to conduct or file a final inspection of permitted work with the department.noted:atoi work under application#321490294-i1-pl exp date 03/03/2023 completed.no sign off for work issued.rem:conduct final

    Aug 12, 2024

    Resolve
  • Class - 2

    Failure to conduct or file a final inspection of permitted work with the department.noted:at time of inspection work under application#32149024enmh exp date 04/01/2023 complete.no sign off final inspection done

    Aug 12, 2024 · Penalty $6,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: at time of inspections, observation was made at exposure(1) front of premises oversized ac extending approximately 3ft out of six floor window witho

    Jul 26, 2024 · Penalty $625

    Resolve
  • Class - 2

    Observed closed jobsite with a chain-link fence enclosing storage of materials and equipment at exposure #1. upon research through dob now system, permit #b00004277-i1-fn expired on 05/12/2023 for the temporary

    May 16, 2023 · Penalty $1,280

    Resolve
  • Class - 2

    No access to motor room missing keys. provide crosbies for holddown for the counterweight. no phone number or any pertinent contact information that would indicate who would have the keys for access.

    Dec 5, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910184.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910185.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910186.remedy:submit acceptable required te

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910187.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910188.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910189.remedy:submit acceptable required te

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910190.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910191.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910192.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910193.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910195.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910181.remedy:submit acceptable required te

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910194.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910183.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910182.submit acceptable required technical report

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain bldg in codecompliant manner.noted:atoi,observation was made@above premises,enclosed shaft staircase doors@2fl 2aside missing doorknob&7b doorside doorknob in disrepair.both doors serve as e

    Feb 15, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post permits in accordance w/28-105.11 noted:during insp@above premises,no active permits posted in conspicuous place to be seen thruout entire bldg.active permit on file for job321490178 exp4/1/22.p

    Feb 15, 2022

    Resolve
  • Class - 1

    Failure to maintain bldg in codecompliant manner.noted:atoi,observation was made inside of shaft staircase 3fl level fire/emergency exit door leading into bldg corridor where tenant occupy,jammed.during my insp

    Feb 15, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order contained in summons/violation #354723484 issued on 5/15/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.for:failure to notify the dept.

    May 18, 2021

    Resolve
  • Class - 1

    Failure to notify the dept of an incident/accident that resulted in a fatality or injury.a worker twisted his ankle & walked to a medical facility to receive treatment.as per a check of dept records,permit

    Jun 23, 2020

    Resolve
  • Class - 1

    Failure to notify the department of an accident or incident that resulted in a fatality or injury.a worker was walking inside of a trench that was approximately four feet when he lost his balance and suffered a

    May 15, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to contain operations.note:at time of my inspection of a building 7 story electrical work in progress,responding to an incident in which a nycha worker tripped and fell.my inspection reveals that a fema

    Mar 4, 2020

    Resolve
  • Class - 2

    Failure to post or distribute notice of tenant protection plan.(tpp)observed work in progress in a jobsite of an exsiting 7story building.no notice of tenant protection plan was posted as required."stop all wor

    Dec 12, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    3301.13.1 inadequate site safety plan(ssp). observed workers activity working at elevated 1st fl(approx 6' off the ground) at new annex building. site safety plan ssp-130.00 does not indicate access/egress at n

    Dec 12, 2019 · Penalty $2,500

    Active
  • Class - 2

    Failure to post or distribute "safe construction bill of rights"observed an exsiting 7story building.work to install concrete ramp at front and strucual work at rear in progress.no safe construction bill of rig

    Dec 11, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post or distribute notice of tenant protection plan(tpp)at the time of inspection on an active jobsite of an existing 7 story building,observed work to install concrete ramp at front and structure wo

    Dec 11, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by chapter 33.(no design drawing for make shift timber platform)observed an approx.4ft x 16ft makeshift platform consisting of plywood and wood beams at el

    Dec 11, 2019 · Penalty $625

    Active
  • Class - 2

    Failure to post permit for work at premises.at time of inspection on an active jobsite,observed work in progress under alt2 #321490249.notedpermit active(exp:03/0/2020)and not posted as required.rem:propertly p

    Dec 11, 2019

    Resolve
  • Class - 2

    Bc3307.2.1/failure to comply with dot regulations.at time of inspection observed excavator thascopic lift and jersey barriers on the street.upon request for dot permit for street closure,it was not available or

    Dec 11, 2019 · Penalty $1,250

    Active
  • Class - 1

    Bc3303.10/failure to carry out construction work in accordance with the required tenant protection plan(tpp)tenant protection plan not beingcompliet with.at time of inspection on an active jobsite of an existin

    Dec 11, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3301.13.1/inadequate site safety plan(ssp)at time of inspection on ana active jobsite,observed that site safety plan does not indicate theexcavation along with the new structure/ramp at front of building.also

    Dec 11, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    3314.1:at the time of my inspection i observed supported scaffold in place upon my inspection i walked th escaffold and observed accumulated debri sand mateirlas this is a unsafe and hazardous condition can cau

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1:at time of inspection i observed supported scaffold in place upon my inspection i observed there were missing guardrials idrails oe baords this created a falling hazardous conidtions do not remove use su

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1;at time of inspection i observed supported scffold in place upon my inspection i observed accumilated debris on te working level #3314.4.4.5)this is a unsafe and hazardous condition materials can dislodg

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1:at the time of my inspection i observed supported scaffold in place upon my inspection walking th escaffold i observed there were missing p/ns is a unsafe and hazardous conditions this can cause dislodge

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1:at time of inspection i observed supproted scaffold in place upon my inspection i observed as i walked the scaffold ther was accumalted debris and storage on working platform this not code complaint all

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1:at time of my inspection i observed supported scaffold in place upon my inspection i observed there was no debris netting in place this is a unsafe and hazardous condition for workers/personall this can

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1:at time of my inspection i observed supproted scaffold in place upon my inspection i observed missing guardrails which can create a falling hazard this is a unsafe and hazardous condition worker personal

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1:at time of inspetcion i observed supproted scaffold in place upon my inspection i observed there were missing pins in the outriggers tha connect to the scaffolding this can cause a unsafe and hazardous c

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1:at time of inspection i observed supported scaffold in place upon my inspection i observed missing handrail when accessory supproted scaffold this can cause a falling hazard unsafe conidtion worker perso

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1 at time of my inspection i observed supported scaffold in place. upon my inspection i observed inadequate debris netting. this can cause an unsafe condition for worker,personel,public. material,debris,to

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 2

    Bc 3314.1 at the time of my inspection i observe supported scaffold inplace. upon my inspection i observed there was accumulated debris on the working platform,skid of cmu block,debris causing a tripping hazard

    Aug 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    3314.1 at the time of my inspection i observed supported scaffold in place. upon my inspection as i walked the scaffold i observed there were missing guardrails for supported scaffold. this creates a falling ha

    Aug 6, 2019 · Penalty $2,530

    Resolve