Violations at 2719 West 33 Street
Brooklyn, NY 11224 · BBL 3-06964-0002 · Back to the property
HPD housing violations
14 HPD violations, newest first.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 3rd room from north located at apt 7a, 7th story, 1st apartment from south at west
Sep 3, 2020 · Apt 7A
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain glazed at bathtub in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Aug 30, 2018 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Aug 30, 2018 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color wall at west in the 1st room from north located at apt 7c, 7th story, 1st apartment from west at north
Nov 20, 2017 · Apt 7C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall aprox. 4 sq ft, at closet at private hall located at apt 7c, 7th story, 1st apartment from west at north
Nov 20, 2017 · Apt 7C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 2nd room from north located at apt 6a, 6th story, 1st apartment from north at east
Feb 2, 2016 · Apt 6A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer , the 3rd room from north, the 1st room from north at east, the bathroom located at apt 6a, 6th story, 1st apartment from north at east
Feb 2, 2016 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from north at east
Feb 2, 2016 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st door from south at west wall in the 2nd room from north located at apt 6a, 6th story, 1st apartment from north at east
Feb 2, 2016 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east located at apt 7b, 7th story, 2nd apartment from west at north
Dec 1, 2014 · Apt 7B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the private hallway located at apt 2e, 2nd story, 2nd apartment from south at west
Oct 21, 2014 · Apt 2E
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 2e, 2nd story, 2nd apartment from south at west
Oct 21, 2014 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak walls and ceiling in the bathroom located at apt 2e, 2nd story, 2nd apartment from south at west
Oct 21, 2014 · Apt 2E
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak walls and ceiling in the private hallway located at apt 2e, 2nd story, 2nd apartment from south at west
Oct 21, 2014 · Apt 2E
Closed — Violation closed
DOB building violations
The newest 50 of 148 DOB violations. The city keeps the complete history.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 12, 2019
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 11, 2019
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 11, 2019
Vp-violation unserved ecb-active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Construction other optional
Due to a vehicle stricking the above location
Apr 4, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
ECB violations
The newest 50 of 108 ECB violations. The city keeps the complete history.
- Class - 2
Exit door not self closing properly at the time of inspection.at the time of inspection observed and noted at 1st floor level at kitchen exit(inside & outside)2 exit is not close properly at rear exit two exits
Jun 9, 2025 · Penalty $625
Resolve - Class - 2
Failure to conduct or file a final inspection of permitted work with the department.noted atoi work under application#321490294 exp date 06/01/2024 completed.no sign off final inspection done for work issued.re
Aug 12, 2024 · Penalty $6,250
Active - Class - 2
Failure to conduct or file a final inspection of permitted work with the department.noted:atoi work under application#321490294-i1-pl exp date 03/03/2023 completed.no sign off for work issued.rem:conduct final
Aug 12, 2024
Resolve - Class - 2
Failure to conduct or file a final inspection of permitted work with the department.noted:at time of inspection work under application#32149024enmh exp date 04/01/2023 complete.no sign off final inspection done
Aug 12, 2024 · Penalty $6,250
Active - Class - 2
Failure to maintain building in code-compliant manner. noted: at time of inspections, observation was made at exposure(1) front of premises oversized ac extending approximately 3ft out of six floor window witho
Jul 26, 2024 · Penalty $625
Resolve - Class - 2
Observed closed jobsite with a chain-link fence enclosing storage of materials and equipment at exposure #1. upon research through dob now system, permit #b00004277-i1-fn expired on 05/12/2023 for the temporary
May 16, 2023 · Penalty $1,280
Resolve - Class - 2
No access to motor room missing keys. provide crosbies for holddown for the counterweight. no phone number or any pertinent contact information that would indicate who would have the keys for access.
Dec 5, 2022 · Penalty $625
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910184.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910185.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910186.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910187.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910188.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910189.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910190.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910191.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910192.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910193.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910195.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910181.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910194.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910183.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control910182.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner.noted:atoi,observation was made@above premises,enclosed shaft staircase doors@2fl 2aside missing doorknob&7b doorside doorknob in disrepair.both doors serve as e
Feb 15, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to post permits in accordance w/28-105.11 noted:during insp@above premises,no active permits posted in conspicuous place to be seen thruout entire bldg.active permit on file for job321490178 exp4/1/22.p
Feb 15, 2022
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner.noted:atoi,observation was made inside of shaft staircase 3fl level fire/emergency exit door leading into bldg corridor where tenant occupy,jammed.during my insp
Feb 15, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #354723484 issued on 5/15/20 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.for:failure to notify the dept.
May 18, 2021
Resolve - Class - 1
Failure to notify the dept of an incident/accident that resulted in a fatality or injury.a worker twisted his ankle & walked to a medical facility to receive treatment.as per a check of dept records,permit
Jun 23, 2020
Resolve - Class - 1
Failure to notify the department of an accident or incident that resulted in a fatality or injury.a worker was walking inside of a trench that was approximately four feet when he lost his balance and suffered a
May 15, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to contain operations.note:at time of my inspection of a building 7 story electrical work in progress,responding to an incident in which a nycha worker tripped and fell.my inspection reveals that a fema
Mar 4, 2020
Resolve - Class - 2
Failure to post or distribute notice of tenant protection plan.(tpp)observed work in progress in a jobsite of an exsiting 7story building.no notice of tenant protection plan was posted as required."stop all wor
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 1
3301.13.1 inadequate site safety plan(ssp). observed workers activity working at elevated 1st fl(approx 6' off the ground) at new annex building. site safety plan ssp-130.00 does not indicate access/egress at n
Dec 12, 2019 · Penalty $2,500
Active - Class - 2
Failure to post or distribute "safe construction bill of rights"observed an exsiting 7story building.work to install concrete ramp at front and strucual work at rear in progress.no safe construction bill of rig
Dec 11, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to post or distribute notice of tenant protection plan(tpp)at the time of inspection on an active jobsite of an existing 7 story building,observed work to install concrete ramp at front and structure wo
Dec 11, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33.(no design drawing for make shift timber platform)observed an approx.4ft x 16ft makeshift platform consisting of plywood and wood beams at el
Dec 11, 2019 · Penalty $625
Active - Class - 2
Failure to post permit for work at premises.at time of inspection on an active jobsite,observed work in progress under alt2 #321490249.notedpermit active(exp:03/0/2020)and not posted as required.rem:propertly p
Dec 11, 2019
Resolve - Class - 2
Bc3307.2.1/failure to comply with dot regulations.at time of inspection observed excavator thascopic lift and jersey barriers on the street.upon request for dot permit for street closure,it was not available or
Dec 11, 2019 · Penalty $1,250
Active - Class - 1
Bc3303.10/failure to carry out construction work in accordance with the required tenant protection plan(tpp)tenant protection plan not beingcompliet with.at time of inspection on an active jobsite of an existin
Dec 11, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3301.13.1/inadequate site safety plan(ssp)at time of inspection on ana active jobsite,observed that site safety plan does not indicate theexcavation along with the new structure/ramp at front of building.also
Dec 11, 2019 · Penalty $2,500
Resolve - Class - 1
3314.1:at the time of my inspection i observed supported scaffold in place upon my inspection i walked th escaffold and observed accumulated debri sand mateirlas this is a unsafe and hazardous condition can cau
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1:at time of inspection i observed supported scaffold in place upon my inspection i observed there were missing guardrials idrails oe baords this created a falling hazardous conidtions do not remove use su
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1;at time of inspection i observed supported scffold in place upon my inspection i observed accumilated debris on te working level #3314.4.4.5)this is a unsafe and hazardous condition materials can dislodg
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1:at the time of my inspection i observed supported scaffold in place upon my inspection walking th escaffold i observed there were missing p/ns is a unsafe and hazardous conditions this can cause dislodge
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1:at time of inspection i observed supproted scaffold in place upon my inspection i observed as i walked the scaffold ther was accumalted debris and storage on working platform this not code complaint all
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1:at time of my inspection i observed supported scaffold in place upon my inspection i observed there was no debris netting in place this is a unsafe and hazardous condition for workers/personall this can
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1:at time of my inspection i observed supproted scaffold in place upon my inspection i observed missing guardrails which can create a falling hazard this is a unsafe and hazardous condition worker personal
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1:at time of inspetcion i observed supproted scaffold in place upon my inspection i observed there were missing pins in the outriggers tha connect to the scaffolding this can cause a unsafe and hazardous c
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1:at time of inspection i observed supported scaffold in place upon my inspection i observed missing handrail when accessory supproted scaffold this can cause a falling hazard unsafe conidtion worker perso
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1 at time of my inspection i observed supported scaffold in place. upon my inspection i observed inadequate debris netting. this can cause an unsafe condition for worker,personel,public. material,debris,to
Aug 6, 2019 · Penalty $625
Resolve - Class - 2
Bc 3314.1 at the time of my inspection i observe supported scaffold inplace. upon my inspection i observed there was accumulated debris on the working platform,skid of cmu block,debris causing a tripping hazard
Aug 6, 2019 · Penalty $625
Resolve - Class - 1
3314.1 at the time of my inspection i observed supported scaffold in place. upon my inspection as i walked the scaffold i observed there were missing guardrails for supported scaffold. this creates a falling ha
Aug 6, 2019 · Penalty $2,530
Resolve