Violations at 2400 Benson Avenue
Brooklyn, NY 11214 · BBL 3-06875-0032 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
15 DOB violations, newest first.
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 30, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 30, 2020
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
May 13, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
The newest 50 of 89 ECB violations. The city keeps the complete history.
- Class - 2
Failure to maintain building in code-compliant manner: illumination for exits, exit discharges and public corriodors per bc 1006.1; 27-381. noted: observed in the gymnasium two lights, third floor staircase cc
Mar 3, 2025 · Penalty $1,250
Resolve - Class - 2
Reissue35495708k failure to maintain bldg in codecompliant manner:note:observed@cellar level ne elevation(benson ave)foundation walls have become pourous allowing water to penetrate allowing water into boilerrm
Apr 2, 2021 · Penalty $1,562
Resolve - Class - 2
Reissue35495711l failure to maintain bldg in codecompliant manner:use of prohibited door &/or hardware per bc1008.1.8;27-371j note:observed keylocking cylinder devices installed on panic bar hardware@cafeteria
Apr 2, 2021 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code-compliant manner:noted:observed at third floor classroom door at room 337 and 2nd floor room 227 do notclose properly due to defective hardware.rem:repair and/or replace.
May 28, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner:use of prohibited door and/or hardware per bc 1008.1.8;27-371(j).noted:observed key locking cylinder devices installed on panic bar hardware at cafeteria ex
May 28, 2020 · Penalty $625
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted:observed at third floor,gymnasium exit door do not open fully due to a wheelchair liftthat was installed directly behind the door's direction of swing and e
May 28, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted:observed exterior wrought iron fence is in disrepair corroded bent vertical barsgate doors hanging off of are hinge throughout exposure 1,2, and 4.rem
May 28, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted:observed at cellar level north cast elevation(benson ave)foundation walls have become pourous allowing water to penetrate allowing water into boiler r
May 28, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted:observed corridor fire proof self closing door c 2b 2nd floor is racked and knocking on door frame not closing proper electrical room 1st floor 107 do
May 28, 2020 · Penalty $625
Resolve - Class - 2
Reissue#35433653z failure to maintain building in code compliant manner:illumination for exits,exit discharges and public corridors per bc 1006.1;27-381.noted:observed existing,emergency lights and floor stair
May 28, 2020 · Penalty $1,562
Resolve - Class - 2
Exit door not self closing. noted: at 1st fl exit e self closer in disrepair/non operational. rmdy; repair/replace door.
Jun 17, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner illumination forexits, exit discharges and public corridors per bc 1006.1/ 27-381 not ed: at 3rd fl gym, st fl auditorium emergency lights are non operation
Jun 17, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner provide requiredcorridor width per bc 1016.2- 27-369 noted: at main entrance one exit door blocked by security desk. rmdy: provide proper corridor width.
Jun 17, 2019
Resolve - Class - 2
Pedestrian protection does not meet code specifications. at the time of my inspection the sidewalk shed erected along 24th ave was not illuminated at all leaving entire pedestrian walkway dark. this creates a h
Jun 4, 2019 · Penalty $2,400
Resolve - Class - 2
Respondent failed to make the proper notification for mobile crane after may 1 , 2018 to the department. at time of inspection it was discovered that no mobile crane (cn 41318)was on site.notification
Feb 13, 2019
Resolve - Class - 2
Respondent failed to properly notify department for mobile crane aftermay 1,2018 at the time of inspection no crane on site cranes that require certificate of on site inspection (cn) must notify department
Dec 24, 2018 · Penalty $2,500
Resolve - Class - 2
0espondent failed to make the proper notification for mobile crane after may 1, 2018 to the dept. at time of inspection cn 41318, cd 4599 was not on site.user must notify department of cranes arrival and depart
Oct 4, 2018 · Penalty $1,250
Resolve - Class - 2
Reissue of nov 35267750j.failure to maintain building in code compliant manner.provide required corridor width per bc 1016.2;27-369.noted:atmain entrance.one exit door blocked by security desk.rem:provide prope
Apr 30, 2018
Resolve - Class - 2
Reissue of nov 35267752n.failure to maintain building walls or appurtenances.noted:at cellar level next to boiler room,and electrical room,foudation wall has become porous allowing rain & ground water to penetr
Apr 30, 2018
Resolve - Class - 1
No control access zone for new building. at time of inspection of a 4 story steel framed building under construction at roof level, active job site, i observed that there were 2 workers removing formwork from p
Mar 26, 2018
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations - ppe provided. at time of inspection of a new steel framed building under construction at roof level, active job site. i observ
Mar 26, 2018
Resolve - Class - 2
Failure to safeguard all persons and property affected by construction operations-gaps, holes, openings on floor. at time of inspection of a 4 story building under construction at roof level, i observed large h
Mar 26, 2018
Resolve - Class - 2
Bc3308.5 failure to install or maintain vertical safety netting system as required. at time of inspection of a new 4 story steel framed building under construction at roof level, active job site. i observed tha
Mar 26, 2018 · Penalty $625
Resolve - Class - 2
Sec. 3301-02(d) construction superintendent fails to maintain &/or make job site logs available. at time of inspection of a 4 sty steel framed bldg under construction at roof level,active job site,upon request
Dec 27, 2017 · Penalty $400
Resolve - Class - 1
Failure to designate &/or have construction superintendent present at site when required. at time of inspection of a new steel framed bldg under construction roof level,active job site,upon request for the cons
Dec 27, 2017 · Penalty $2,500
Resolve - Class - 2
Failure to institute or maintain safety equipment measures or temp construction.at time of inspecion of a 4 story new steel framed bldg,active job site i observed a worker working at 4th fl level exp#2 leading
Dec 12, 2017
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations-gaps,holes/openings on floor.at time of inspeciton of a 4 story new steel framed bldg at bulk head framing stage active job site
Dec 12, 2017 · Penalty $5,000
Resolve - Class - 1
Bc3301.2:failure to institute safety equipment measures.no rebar caps-or temp construction.at time of inspection of a new 4 story bldg undre construction at bulkhead framing(steel framed bldg)active job site,i
Dec 12, 2017 · Penalty $1,600
Resolve - Class - 1
3301.1.2 failure to comply with nyc fire code general. no fire watch for cutting operations at 3rd floor.at timne of inspection of a 4 story new steel framed building at 4th floor level,active job site,i obser
Nov 15, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction,no guardrail. at time of inspection of a 5 sty steel framed bldg at 5th fl level,active job site,i observed that there were no
Oct 25, 2017 · Penalty $1,200
Resolve - Class - 1
Failure to provide adequate means of ingress/egress. at construction site-lack of egress. failure to safeguard. at time of inspection of a 5 sty new steel frame bldg at 5th fl level,active job site. i observed
Oct 25, 2017 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons on site affected by construction operations: no overhead protection. at time of inspection of a 5 sty steek framed bldg at 5 fl level active job site,i observed that there were
Oct 25, 2017 · Penalty $10,000
Resolve - Class - 1
Failure to safeguard all persons working on site affected by construciton operations gaps/holes/openings. at time of inspection of a 5 sty steel framed new bldg at 5th fl level,active job site,i observed that
Oct 25, 2017 · Penalty $2,400
Resolve - Class - 1
Inadequate safety measures:operation of crane hoisting equipment in anunsafe,manner.engineer of record(respondent)signed off crane cd#4326 cn85167 in the wrong location.also on foundation lack of structural int
Sep 26, 2017
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.above respondent sign off/approved crane cd4326 cn 85617 set up wrong area-work did not conform to dob approved plans(refer to 28
Sep 26, 2017
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.above respondent used cran cd#4326,cn#85617 setup in wrong area-work did not conform to approved plans(refer to 28-105.12.2)crane
Sep 26, 2017 · Penalty $12,500
Resolve - Class - 1
Inadequate safety measures;operation of crane hoistng equipment in an unsafe manner.above respondent used crane cd#4326,cn#85617 in the wrong location and also setup crane on foundation lack of structural integ
Sep 26, 2017 · Penalty $10,000
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.above respondent used crane cd#4326 cn#85617 setup in wrongarea-work did not conform to approved plans(refer to 28-105.12.1).cran
Sep 26, 2017 · Penalty $1,000
Resolve - Class - 1
Inadequate safety measures:operation of crane hoisting equipment in an unsafe mannerabove respondent operated/use crane co#4326 cn#85617 in the wrong location and also setup crane on foundation lack of structur
Sep 26, 2017 · Penalty $10,000
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances. noted: at cel lar next to the electrical room, foundation wall has become porous allowing the rain water into boiler room. rmdy: maintain exterior buildin
May 25, 2017
Resolve - Class - 2
28-301.1 unlawful display of artwork in corridors greater than 20% per fdny 2008 code; fc 803.3.2 noted: artwork displayed in corridors throughout the building is greater than 20%, all owed per code.rmdy:
May 25, 2017
Resolve - Class - 2
Reissue #35216380l failure to maintain building in code-compliant manner. provide requried corridor width per bc 1016.2; 27-369. noted: at main entrance, one exit door blocked by security desk leaving only one
May 25, 2017
Resolve - Class - 2
Reissue #35216382p exit door not self closing. noted: at 4th floor exit staircase c, at 3rd flr exit a, room 315, room 318 at 2n flr exit a,b,c,d, room 256 at 1st floor exit c,d, and main entrance exit doors
May 25, 2017
Resolve - Class - 2
Failure to maintain building in code compliant manner, lack of emergency lighting for exits, exit discharges and public corridor per bc 1006.1; 27-542. noted: at 1st floor, cafeteria area and auditorium area, i
Oct 18, 2016
Resolve - Class - 2
Exit door not self closing. noted: at 4th floor, exit staircase (c) at 3rd floor, exit (a), (c), rm #315, rm #318 & at 2nd floor exit (a), (b), (c), (d), rm #256 & 1st floor, exit (c), (d), the door have defect
Oct 18, 2016
Resolve - Class - 2
Reissue nov# 35023459n. failure to maintain building in code compliant manner. note: at bulkhead staircase (c) and at boys & girls bathroom at 4th floor, water damage to ceiling and walls due to water penetrati
Oct 18, 2016
Resolve - Class - 2
Reissue nov# 35128840n. failure to maintain in code-compliant manner: provide required corridor width per bc 1016.2; 27-369. noted: at 1st floor, at main entrance, exit door blocked by security door. rem: compl
Oct 18, 2016
Resolve - Class - 2
Failure to maintain building in code-compliant manner.provide requiredcorridor width per bc1016.2;27-369 blocked exit door:reissue ecb 3509 4933j. at main entrance, exit doors blocked by security desk and secur
Jun 15, 2015
Resolve - Class - 2
Blocke exit door. at main entrance, exit doors blocked by security desk, chair & table. remedy: remove obstructions.
May 21, 2014
Resolve - Class - 2
Illegal door hardware. -various exit doors & cross corridor doors thru-out bldg has brass door kicks installed at bottom of door. -various classroom doors thru-out bldg has brass door kicks installed at bottom
May 21, 2014
Resolve