roofy

Violations at 3004 Avenue R

Brooklyn, NY 11229 · BBL 3-06841-0001 · Back to the property

HPD housing violations

The newest 50 of 151 HPD violations. The city keeps the complete history.

  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 1st apartment from north at east

    Apr 20, 2026 · Apt 2

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north located at apt 21b, 2nd story, 1st apartment from west at north

    Mar 12, 2025 · Apt 21B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from east at north located at apt 21b, 2nd story, 1st apartment from west at north

    Mar 12, 2025 · Apt 21B

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 4th room from east at south, the kitchen , the private hallway , the 3rd room from east at south, the 2nd room from east, the bathroom located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the east wall and ceiling at public hall, 1st story

    Jan 12, 2025

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 4th room from east at south located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall and ceiling in the 4th room from east at south located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall and ceiling in the 3rd room from east at south located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and south wall in the 3rd room from east at south located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at east wall and ceiling in the kitchen located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the east wall and ceiling in the kitchen located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall and ceiling in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall and ceiling in the 2nd room from east located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at east and ceiling in the 1st room from east at north located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the east wall and ceiling in the 1st room from east at north located at apt 1f, 1st story, 1st apartment from east at south

    Jan 12, 2025 · Apt 1F

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the 1st room from north at west, the bathroom , the 3rd room from north, the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Jan 11, 2025 · Apt 2

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2, 2nd story, 1st apartment from north at east

    Jan 11, 2025 · Apt 2

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jan 8, 2025 · Apt 2

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jan 8, 2025 · Apt 2

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at north wall at public hall, 1st story original violation 17325890 issued 05-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 5, 2024

    Open — First no access to re- inspect violation
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east original violation 17325887 issued 05-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east original violation 17325884 issued 05-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the 3rd room from north at east located at apt 1, 1st story, 1st apartment from north at east original violation 17325878 issued 05-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and north wall at public hall, 1st story

    Oct 5, 2024

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at north wall at public hall, 1st story

    Oct 5, 2024

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Oct 5, 2024

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and window recess in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling, east, and north walls in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10sq.ft at ceiling in the 3rd room from north at east located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and east walls in the 3rd room from north at east located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at east located at apt 1, 1st story, 1st apartment from north at east

    Oct 5, 2024 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective counter balance at upper sash window. in the 4th room from east located at apt 2b, 2nd story, 1st apartment from south at west

    May 26, 2024 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood window stool. in the 4th room from east located at apt 2b, 2nd story, 1st apartment from south at west

    May 26, 2024 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak at ceiling. in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west

    May 26, 2024 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall. in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west

    May 26, 2024 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak at ceiling. in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    May 26, 2024 · Apt 2B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall. in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    May 26, 2024 · Apt 2B

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt second, 2nd story, 1st apartment from east at south

    Mar 18, 2024 · Apt SECOND

    Closed — Violation closed
  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east

    Jan 24, 2024 · Apt 2

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Jan 24, 2024 · Apt 2

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st closet from south at west wall door frame, 1st door from south at west wall, 1st door frame from south at west wall, south wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from north at east

    Jan 24, 2024 · Apt 2

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Jan 24, 2024 · Apt 2

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from east at south wall, north wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east

    Jan 24, 2024 · Apt 2

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, east wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east

    Jan 24, 2024 · Apt 2

    Closed — Violation closed

DOB building violations

23 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 27, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 15, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 15, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations

17 ECB violations, newest first.

  • Class - 2

    Incorrect psi rating on boiler safety valve installed ýmawp 30 psi¨ stamped on boiler;correct violation and submit the certificate of correction

    Oct 12, 2022 · Penalty $625

    Active
  • Class - 2

    Temporary construction equipment on site-exp permit. at time of inspection i observed construction fence in place w/exp permit as of 1-30-19permit#00042847. remedy: renew permit for construction fence.

    Feb 20, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to comply with the comssioners order contained in summons/violation#35263955p isssued on 08/02/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.w/o permit front yard job#

    May 29, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply w/comm's order to correct condition cited in nov#35263955p issued on 8-21-17. remedy: comply w/order.

    Apr 9, 2018 · Penalty $6,250

    Resolve
  • Class - 3

    Work without a permit. observed plywood construction fence erected to enclose an excavaton site at front yard of property. fence erected without permit posted or on dept of buildings records. rem: obtain permit

    Mar 19, 2018

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35263955p issued on 08/21/2017 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit

    Feb 25, 2018 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35263955p issued on 08/21/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a permi

    Jan 2, 2018 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35293911k issued on 09/29/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for failure to post dot permits.

    Nov 15, 2017 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35263955p issued on 08/21/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for work w/o a permit. remedy: comply w/

    Nov 15, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. bc 3303.3 failure to post dot permits. noted: 3 20 curbic yard each dumpeter placed along the street at exp#1 taking approx 80' of street. no permits posted. remedy: provide permits.

    Sep 29, 2017 · Penalty $800

    Resolve
  • Class - 1

    Work w/o permit.work noted:at time of inspection an 8'high tight board plywood construction site fence has been erected at the front of the premises.also noted there is an excavation in the front yard that has

    Aug 21, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3303.3:failure to post dot permits.at time of inspection 3(20 cubic yd)dumpster were placed along the street of exp#1of 1856 burnett st.dumpster are taking approx 90 ft of street.no permits posted.rem:provide

    Aug 21, 2017

    Resolve
  • Class - 2

    Failure to maintain building walls or appurtenances. note: brick mortar joints missing at 2nd front & left side of brick facade. brick work at left corner is shifting out of(plumb). due to defects at exterior

    Feb 23, 2012 · Penalty $250

    Resolve
  • Non-hazardous

    B4a/34a/34b/35/40/45b/50a/50b/50c/50d/50e/50f/50g/.50a-drafostat sealed closed w/rags.50b-improper supports on flu pipe.50c-hot water line rotted out of coil.50d-no 530c valve.50e-no check valve.50f-holes in bo

    Sep 25, 2007 · Penalty $180

    Resolve
  • Hazardous

    Failure to comply with an order of the department to correct vio# 34497078h on 10/19/05 for work w/o permit. interior demolitions, new plumbing and electric and all conditions noted on violation and done w/o pe

    Mar 15, 2006 · Penalty $5,000

    Resolve
  • Non-hazardous

    Work without a permit: work noted: 1st floor apt interior renovation electrical plumbing and construction/ demolition work sheet rock partitions removed to rear walls in interior. remedy: "stop all work" obtain

    Dec 5, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Work w/o a permit. hazardous. work noted: 1st floor completely gutted walls, ceilings with new electric wiring/new plumbing lines installed w/o permit at 1st floor. remedy: obtain permit

    Oct 19, 2005 · Penalty $2,500

    Resolve