roofy

391 Kings Highway

Brooklyn, NY 11223BBL 3-06654-0036Map

Owner of record: Ianno Frank S

391 Kings Highway is a mixed residential and retail building built in 1931 in Brooklyn, 11223. It has 2 residential units across 2 floors. The owner of record is Ianno Frank S. HPD has recorded 43 housing violations here, most recently on May 19, 2008. 43 of the 43 most recent violations are still open.

HPD violations
43
DOB violations
18
ECB violations
1
HPD complaints
152

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 19, 2008

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 43

  • B

    Replace with new the missing glass insert at entrance door to building

    May 19, 2008

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story

    Mar 20, 2008 · Apt 2

    Open — Nov sent out
  • C

    Replace with new the missing locking assembly at entrance door to building

    Mar 20, 2008

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical wires ceiling at public hall, 2nd story

    Mar 20, 2008

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floor at public hall, 2nd story

    Mar 20, 2008

    Open — Nov sent out
  • C

    Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 2, 2nd story

    Mar 20, 2008 · Apt 2

    Open — Nov sent out
  • C

    Abate the nuisance consisting of no electric supply to all stories at public hall

    Mar 20, 2008

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile at east wall in the bathroom located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floor at public hall, 2nd story

    Sep 9, 2007

    Open — Nov sent out
  • B

    Replace with new the missing handle at entrance door to building at public hall, 1st story

    Sep 9, 2007

    Open — Nov sent out
Show 33 more ↓
  • B

    Properly repair the broken or defective lock at vestibule door at public hall, 1st story

    Sep 9, 2007

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. at public hall, 2nd story

    Sep 9, 2007

    Open — Nov sent out
  • B

    Properly repair the broken or defective lock at entrance door to apartment in the entire apartment located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures for cooking in the kitchen located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the broken or defective frame of entrance door to apartment in the entire apartment located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Properly secure the loose wash basin in the bathroom located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste line of wash basin in the bathroom located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceilings, walls throughout in the entire apartment located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Abate the nuisance consisting of evidence of water leak at ceilings in the entire apartment located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings in the entire apartment located at apt 2, 2nd story, apartment at south

    Sep 9, 2007 · Apt 2

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 2f, 2nd story, apartment at south

    Jun 21, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 2f, 2nd story, apartment at south

    Jun 21, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures stove in the kitchen located at apt 2f, 2nd story, apartment at south

    Jun 21, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Properly repair the broken or defective wooden floor at public hall, 2nd story

    Jun 21, 2006

    Open — Nov sent out
  • B

    Replace with new the missing wall tile at bathtub in the bathroom located at apt 2f, 2nd story, apartment at south

    Jun 21, 2006 · Apt 2F

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling at public hall, 2nd story

    Jun 21, 2006

    Open — Nov sent out
  • C

    Replace with new the missing glass at skylight at 2nd sty. public hall , 2nd story

    Oct 28, 2005

    Open — Nov sent out
  • B

    Abate the nuisance consisting of evidence of water leak at ceiling 2nd story public hall , 2nd story

    Oct 28, 2005

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures shower stall in the bathroom located at apt 2f, 2nd story

    Oct 28, 2005 · Apt 2F

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Oct 28, 2005 · Apt 2F

    Open — Nov sent out
  • B

    Provide adequate lighting for 2nd story public hall, 100watts

    Oct 28, 2005

    Open — Nov sent out
  • B

    Replace with new the broken or defective knob at entrance door to bldg.

    Oct 28, 2005

    Open — Nov sent out
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination 100 watts at public hall, 2nd story

    Feb 25, 2005

    Open — Nov sent out
  • A

    Replace with new the missing knob at shower body in the bathroom located at apt 2f, 2nd story, apartment at south

    Feb 19, 2005 · Apt 2F

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story

    Feb 19, 2005 · Apt 2F

    Open — Nov sent out
  • B

    Properly repair the broken or defective light fixture, 1st and 2nd story at public hall

    Jan 9, 2005

    Open — Nov sent out
  • B

    Replace with new the missing door in the 1st room from north at east located at apt 2f, 2nd story

    Jan 9, 2005 · Apt 2F

    Open — Nov sent out
  • B

    Properly repair the broken or defective pilot at gas range in the kitchen located at apt 2f, 2nd story, apartment at south

    Jan 9, 2005 · Apt 2F

    Open — Nov sent out
  • B

    Replace the broken or defective handle; faucet at bathtub in the bathroom located at apt 2f, 2nd story, apartment at south

    Jan 9, 2005 · Apt 2F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ; walls and ceilings throughout in the entire apartment located at apt 2f, 2nd story, apartment at south

    Jan 9, 2005 · Apt 2F

    Open — Nov sent out

DOB building violations · 18

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
Show 8 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active

ECB violations · 1

  • Non-hazardous

    B4b,24b,34b,16,32a,38,50a,b,c,d,e,f,g,h.50a-boiler plates missing.50b-interior jacket panel scorched.50c-severe backdraft at boiler device.50d-spill switch on wrng location.50e-water gallon'i/e' uneven.50f-rott

    Aug 21, 2007 · Penalty $800

    Active

Complaints

  • Electric

    Lighting

    May 15, 2008 · Apt 2

    Close
  • General

    Doors

    May 15, 2008 · Apt 2

    Close
  • Paint/plaster

    Wall

    May 15, 2008 · Apt 2

    Close
  • General

    Floor

    May 15, 2008 · Apt 2

    Close
  • General

    Windows

    May 15, 2008 · Apt 2

    Close
  • Plumbing

    Basin/sink

    May 15, 2008 · Apt 2

    Close
  • Appliance

    Electric/gas range

    May 15, 2008 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    May 15, 2008 · Apt 2

    Close
  • Nonconst

    Vermin

    May 15, 2008 · Apt 2

    Close
  • Paint/plaster

    Wall

    May 15, 2008 · Apt 2

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    May 9, 2008 · Apt 2

    Close
  • General

    Doors

    Apr 16, 2008 · Apt 2

    Close
  • Nonconst

    Smoke detector

    Mar 19, 2008 · Apt 2

    Close
  • Nonconst

    Carbon monoxide

    Mar 19, 2008 · Apt 2

    Close
  • Nonconst

    Smoke detector

    Mar 19, 2008 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Mar 19, 2008 · Apt 2

    Close
  • General

    Doors

    Mar 19, 2008 · Apt 2

    Close
  • Electric

    Electric-supply

    Mar 19, 2008 · Apt 2

    Close
  • General

    Floor

    Mar 19, 2008 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Mar 19, 2008 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Mar 19, 2008 · Apt 2

    Close
  • Heating

    Heat related

    Mar 19, 2008 · Apt 2

    Close
  • Heating

    Heat related

    Feb 28, 2008 · Apt 2

    Close
  • General

    Windows

    Jan 3, 2008 · Apt 2A

    Close
  • Appliance

    Electric/gas range

    Jan 3, 2008 · Apt 2A

    Close
  • General

    Cooking gas

    Jan 3, 2008 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jan 3, 2008 · Apt 2A

    Close
  • General

    Doors

    Jan 3, 2008 · Apt 2A

    Close
  • Heating

    Heat related

    Jan 3, 2008 · Apt 2A

    Close
  • Heating

    Heat related

    Nov 19, 2007 · Apt 2F

    Close
  • Heating

    Heat related

    Nov 10, 2007 · Apt 2F

    Close
  • General

    Ceramic-tile

    Nov 9, 2007 · Apt 2F

    Close
  • General

    Windows

    Nov 9, 2007 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Nov 9, 2007 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Nov 9, 2007 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Nov 9, 2007 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Nov 9, 2007 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Nov 9, 2007 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    Nov 9, 2007 · Apt 2F

    Close
  • Construction

    Roof

    Nov 9, 2007 · Apt 2F

    Close
  • General

    Locks

    Nov 9, 2007 · Apt 2F

    Close
  • General

    Doors

    Nov 9, 2007 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Nov 9, 2007 · Apt 2F

    Close
  • Heating

    Heat related

    Nov 9, 2007 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Aug 30, 2007 · Apt 2

    Close
  • Plumbing

    Water supply

    Aug 30, 2007 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Aug 30, 2007 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 30, 2007 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Aug 30, 2007 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 30, 2007 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S2)
Year built
1931
Floors
2
Residential units
2
Building area
2,500 ft²
Lot area
1,960 ft²
Zoning
R7A
Community board
311
Council district
44
Block / lot
6654 / 36
Assessed value
$73,440
Landmark / historic district
No

Questions about 391 Kings Highway

Who owns 391 Kings Highway?

The owner of record in NYC Department of City Planning PLUTO data is Ianno Frank S.

Does 391 Kings Highway have violations?

Yes. NYC HPD has recorded 43 housing violations at this property.

Is 391 Kings Highway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 391 Kings Highway built?

City records list 1931 as the year it was built.

How many apartments are in 391 Kings Highway?

It has 2 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.