roofy

3 Avenue P

Brooklyn, NY 11204BBL 3-06595-0033Map

Owner of record: NYC Department Of Education

3 Avenue P is a school building built in 1931 in Brooklyn, 11204. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
24
ECB violations
76
HPD complaints
1

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 24

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 19, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 15, 2013

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 3, 2012

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
Show 14 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 13, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations · 76

  • Class - 2

    Exit door not self-closing. noted: at(3rd fl) stair b(basement) cafeteria doors in disrepair/not self-closing when tested. remedy: replace/repair door.

    Feb 17, 2026 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: at(3rd fl) smoke door near rm 315(1st fl) stairs c and a, auditorium, smoke door near rm 110 doors are in disrepair/racked. remedy: repair and/or re

    Feb 17, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to obtain a temporary construction permit prior to installation/use of temporary construction equipment. at the time of my inspection of a city owned and operated building with sidewalk shed erections.

    Mar 5, 2025 · Penalty $1,250

    Active
  • Class - 2

    Exit door not self-closing. noted: exit 6 one door, exit 7 one door, and exit 8 2 doors. all these doors were not closing properly. remedy: repair/replace door.

    Mar 4, 2025 · Penalty $625

    Resolve
  • Class - 2

    Reissue#35553885y failure to maintain building in code compliant manner:illumination for exits,exit discharges and public corridors per bc 1006.1,27-381 observed at toi there were several emergency lites that w

    Apr 7, 2022 · Penalty $1,562

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.observed at toi there are several exterior exit doors not operating correctly.the issues vary door to door but several doors need repairs.rem:repair/replace

    Apr 7, 2022 · Penalty $625

    Resolve
  • Class - 2

    After hours work w/o permit. at time of inspection observed:after hours pipe scaffold installation ongoing w/o after hours permit. ahv permit 322053736,ref#01033480 does not indicated pipe scaffold installation

    Dec 22, 2021 · Penalty $625

    Active
  • Class - 2

    Exit door not selfclosing properly.4flgym in main entrance(near rm402)1 exit door,@1fl(corridor exit door)1 exit door not selfclosing properly,@1fl exit3 outside 1exit door not selfclosing properly@time of insp

    Apr 6, 2021 · Penalty $625

    Resolve
  • Class - 2

    Reissue35495722r doi6.1.20 failure to maintain bldg in codecompliant manner:illumination for exits.exit discharges&public corridors per bc1006.1;27-381,@3flgym near main entrance exit5 1place 3lights,existing e

    Apr 6, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue#35433704j illumination for exiyts,exit discharges & public corridors per bc 1006.1;27-381. noted: observed existing emerhgency lights at 3rd fl gym exit#11 & at auditorium rear right side near exit 9 we

    Jun 1, 2020 · Penalty $1,562

    Resolve
Show 40 more ↓
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at the 1st fl boys bath,2nd fl 213,& 3rd fl rooms 302,313 & 319,doors are not working properly. remedy" repair &/or replace.

    Jun 13, 2019

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at the auditorium right rear exit,spalling paint in various areas.

    Jun 13, 2019

    Resolve
  • Class - 2

    Exit door not self closing. noted: at the auditorium,main entrance,1stfl smoke doors by room 102,& 2nd fl stair d by room 218,exit doors arenot working properly. remedy: repair/replace door.

    Jun 13, 2019

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner;illumination for exits,exit discharges & public corridors per bc1006.1;27-381. noted: at the auditorium main entrance & the 3rd fl gymnasium,emergency lights ar

    Jun 13, 2019

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: no fire stopping per bc 712.3;27-345. noted: at the electrical room,concuit penetration through the ceiling,at the gas meter room,black pipe going through the

    Jun 13, 2019

    Resolve
  • Class - 2

    Reissue of nov#35260609z failure to maintain bldg in code compliant manner. noted: at cellar level, boiler room, water penetration at various areas. rmdy: repair retaining wall

    Mar 29, 2018

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner use of prohibited door and/or hardware per bc 1008.1.8.27 - 371(j). oted in various doors at 1st,2nd and 3rd floors installed door kick stop

    May 4, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner noted: at the basement water penetration at various locations in the boiler area. rmdy: repair retaining wall.

    May 4, 2017

    Resolve
  • Class - 2

    Reissue rcb#25316515j: east door not self closing. noted at 4th floor exit f, 3rd floor exit 11, rooms 07,321,319 and 2nd floor room #227 defective hinges and door closers also observed at the 1st flr boys and

    May 4, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner noted: at the basement boiler room; water leakage fromt eh vacuum pumprmdy: repair/replace doors.

    May 4, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner illumination for exits, exit discharges and public corridors per bc 1006:1:27-381. note at 4th floor gym exit 11 not operational emergency

    May 4, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner: no fire stopping per bc 712.3; 27-345. noted: at basement level, electrical room, missing fire stopping on ceiling (hole approx 10 inch x 20 inch). rem: co

    Oct 21, 2016

    Resolve
  • Class - 2

    Exit door not self closing. noted: at 4th floor, exit (f) & 3rd floor exit (11), rm #07, 321, rm next to staircase (h) & 2nd floor rm #227, the doors have defective in the hinges and closers. rem: comply with c

    Oct 21, 2016

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. noted: at basement level, punker area next to boiler room, cracked masonry stucco cement coating from floor to ceiling. rem: comply with code/repair the cr

    Oct 21, 2016

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. noted: at 4th floor, rm #4351 behind gym area & vat basement staircase (e), (f), water damage to ceiling or walls due to water penetration through roof and

    Oct 21, 2016

    Resolve
  • Class - 2

    Fire stopping. in basement boiler room ceiling in various areas throughout, there are holes in ceiling & walls with lack of fire stopping. remedy: provide fire stopping.

    May 21, 2014

    Resolve
  • Class - 2

    Racked & splitting doors. the following rooms have racked &/or splitting doors: 225,223,224,220,219,217,215. remedy: replace doors.

    May 21, 2014

    Resolve
  • Class - 2

    Illegal door hardware. 1st floor main entrance exit doors have brass door kicks installed & are being used to hold door open. remedy: remove brass door kicks.

    May 21, 2014

    Resolve
  • Class - 2

    The following exit doors not self-closing: a) bulkhead: wood door defective. b) double-door adjacent to room 221. remedy: repair/replace

    Jul 1, 2013

    Resolve
  • Class - 1

    Failure to safe guard persons & property affected by construction operations appl#302551389 noted open trench directly in front of exit doors notified employee of company of condition 7/13/11 christopher vardar

    Jul 14, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Severly rusted steel grating throughout west 11 side & vave p side sagging evident l clip detached from wall.rem:replace forthwith

    Jul 13, 2011

    Resolve
  • Class - 1

    Failure to safeguard persons & property affected by construction operation #302551389 noted open trench directly in front of exit doors running entire span of stair no cover over trench or no preventive measure

    Jul 13, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain adequate fire stopping observed at cellar electricmeter room open walls & ceiling around pipe penetration open diamond lathe transom over entry doors rem; maintain fire stopping

    Apr 28, 2010

    Resolve
  • Class - 2

    Failure to maintain observed at exit 8 stairs to courtyard broken concrete corner on landing vertical cracking on side of steps loose railing unsupported rail post

    Apr 28, 2010

    Resolve
  • Class - 3

    Failure to maintain in that window lintels at rm's 307,328,427,429,431411 stairwell @ 1st flr stairway g & h stair 6 @ 2nd flr & 4th flr gymare defective in that water is being allowed to penetrate causing dama

    Aug 7, 2008

    Resolve
  • Class - 3

    Failure to maintain in that all partition in the girls bathroom on 1st flr are rotted,doors are failing off & don't close. remedy: replace defective partition.

    Aug 7, 2008

    Resolve
  • Class - 3

    Reissue 34570541z exhaust duct from cafeteria in disrepair,water penetrating causing damage to interior cafeteria walls. remedy: repair/replace duct & repair walls.

    Aug 7, 2008

    Resolve
  • Class - 3

    Reissue 34570598j failure to maintain in that water is penetrating through wall @ stair well g & h from 1st to 4th flr. remedy: make all repairs.

    Aug 7, 2008

    Resolve
  • Hazardous

    Reissue # 34513129x. noted water penetration through wall in stairway h & g from 1st to 4th floors. remedy: maintain exterior wall.

    Apr 24, 2007

    Resolve
  • Hazardous

    Failure to maintain. reissue #34513131p. noted no firestop provided @ eletrical room (grill above door). remedy: provide & maintain firestop

    Apr 24, 2007

    Resolve
  • Hazardous

    Reissue # 34513128y. noted corridor doors on 3rd & 4th floors & 5 smoke doors need to be repaired or replaced. remedy: repair or replacedoors.

    Apr 24, 2007

    Resolve
  • Hazardous

    Failure to maintain noted: there is a major leak in girls restroom dueto faulty plumbing in wall rm 118 @ 1st fl. remedy: repair / or replace faulty plumbing

    Apr 24, 2007

    Resolve
  • Hazardous

    Failure to maintain. noted : water penetration @ boiler room due to crack in water main. remedy: repair / or replace main

    Apr 24, 2007

    Resolve
  • Hazardous

    Failure to maintain. noted: exhaust duct from cafeteria in disrepair, water penetration causing damaged to interior cafeteria wall. remedy :repair / or replace exhaust duct

    Apr 24, 2007

    Resolve
  • Non-hazardous

    No fire stopping provided in electrical room in basement (grill above enter door frame) remedy: maintain fire stopping as required.

    Mar 7, 2006

    Resolve
  • Non-hazardous

    No panic hardware installed in door by stair g & h cafeteria (p.a) andin auditorium(no panic bars in all exit doors.) remedy: provide panic hardware in p.a.

    Mar 7, 2006

    Resolve
  • Non-hazardous

    Water penetration through the wall in stairwell h & g from 1 to 4 flr.remedy: do repointing exterior wall.

    Mar 7, 2006

    Resolve
  • Non-hazardous

    Reissue #34474699z corridor doors on 3rd & 4th flrs and fire smoke stop door need to or replaced be readjusted. remedy: make all necessary repairs/or replace.

    Mar 7, 2006

    Resolve
  • Non-hazardous

    Steel stair case at north west (1st fl to basement cafeteria) has 2-broken stair treads. remedy: repair defective treads.

    Apr 6, 2005

    Resolve
  • Non-hazardous

    Corridor doors on 3fl and 4fl defective and stairwell doors through out building are defective, noted boys and girls bathroom partition doors (6) are missing through out bathrooms. re-issue 34427231l. remedy:

    Apr 6, 2005

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Sep 22, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
School building (W1)
Year built
1931
Floors
4
Residential units
—
Building area
115,600 ft²
Lot area
74,000 ft²
Zoning
R4-1
Community board
311
Council district
43
Block / lot
6595 / 33
Assessed value
$7,060,050
Landmark / historic district
No

Questions about 3 Avenue P

Who owns 3 Avenue P?

The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.

Does 3 Avenue P have violations?

NYC HPD has no housing violations on record for this property.

Is 3 Avenue P rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3 Avenue P built?

City records list 1931 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.