2403 64 Street
Brooklyn, NY 11204BBL 3-06561-0060Map
Owner of record: Zhao, Liang Wang
2403 64 Street is a two-family home built in 1920 in Brooklyn, 11204. It has 2 residential units across 2 floors. The owner of record is Zhao, Liang Wang. HPD has recorded 21 housing violations here, most recently on September 23, 2026. 21 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 5
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the kitchen located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operating lock installed at security metal door at building entrance at public hall, 1st story
Sep 23, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the private hallway located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from east located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 5th room from east located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, north wall in the private hallway located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, north wall, east wall, 1st window frame from east at south wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out
Show 11 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the 1st room from east located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, 1st window frame from north at east wall in the 4th room from east located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1stflo, 1st story, 2nd apartment from north at east
Sep 23, 2026 · Apt 1STFLO
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 6, 2026
Open — Info nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from east located at apt 1fl, 1st story, 1st apartment from north at east
Jul 31, 2026 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Jul 31, 2026 · Apt 1FL
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Jul 31, 2026 · Apt 1FL
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east located at apt 1fl, 1st story, 1st apartment from north at east
Jul 31, 2026 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Jul 31, 2026 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 1fl, 1st story, 1st apartment from north at east
Jul 31, 2026 · Apt 1FL
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Wall
Sep 22, 2026 · Apt 1STFLO
Close - Paint/plaster
Ceiling
Sep 22, 2026 · Apt 1STFLO
Close - Paint/plaster
Ceiling
Jul 30, 2026 · Apt 1STFLO
Close - Water leak
Slow leak
Jul 30, 2026 · Apt 1STFLO
Close - Unsanitary condition
Mold
Jul 30, 2026 · Apt 1STFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 3,580 ft²
- Lot area
- 1,600 ft²
- Zoning
- R6A
- Community board
- 311
- Council district
- 44
- Block / lot
- 6561 / 60
- Assessed value
- $116,400
- Landmark / historic district
- No
Questions about 2403 64 Street
Who owns 2403 64 Street?
The owner of record in NYC Department of City Planning PLUTO data is Zhao, Liang Wang.
Does 2403 64 Street have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 2403 64 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2403 64 Street built?
City records list 1920 as the year it was built.
How many apartments are in 2403 64 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.