roofy

Violations at 209 Avenue M

Brooklyn, NY 11230 · BBL 3-06538-0051 · Back to the property

HPD housing violations

39 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 6, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 21, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 23, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 25, 2018

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of bicycles and other household items at public hall, 1st story

    Aug 25, 2018

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of bicycles, and other household items at public hall, 2nd story

    Aug 25, 2018

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of bicycles, shoes, and other household items at public hall, 3rd story

    Aug 25, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 25, 2018

    Closed — Violation dismissed
  • BHazardous

    Arrange and make self-closing the doors at building entrance at public hall, 1st story

    Apr 18, 2018

    Open — Not complied with
  • CImmediately hazardous

    M/d law abate the nuisance consisting of free standing radiator at public hall, 1st story

    Apr 18, 2018

    Closed — Violation closed
  • BHazardous

    Arrange and make self-closing the doors .. in the entrance located at apt 3f, 3rd story, 1st apartment from east at south

    Apr 18, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 1st door from south at west wall, east wall, west wall, 1st window frame from east at south wall in the 4th room from north at west located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the south wall, east wall, west wall in the 4th room from north at east located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 4th room from north at east located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the north wall in the 4th room from north located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, south wall in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, east wall, west wall in the private hallway located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the north wall in the kitchen located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st door from south at west wall, east wall, west wall, 1st window frame from east at south wall in the 4th room from north at west located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall, south wall, east wall, west wall in the 4th room from north at east located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from north located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, south wall in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, east wall, west wall in the private hallway located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the foyer located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall stairs

    Feb 9, 2018

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective upper window sash in the 3rd room from north located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • ANon-hazardous

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • BHazardous

    M/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape room in the 4th room from north at east located at apt 3f, 3rd story, 1st apartment from east at south

    Feb 9, 2018 · Apt 3F

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 7, 2015

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of house hold items at builkhead at public hall, 3rd story

    Nov 1, 2009

    Open — Nov sent out
  • BHazardous

    Replace with new the missing sash chains 2 to 3 stys intermediate landings.

    May 10, 1988

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls 1 sty public hall.

    May 10, 1988

    Open — Nov sent out

DOB building violations

7 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations

No ECB violations on record