roofy

Violations at 1366 East 3 Street

Brooklyn, NY 11230 · BBL 3-06538-0038 · Back to the property

HPD housing violations

The newest 50 of 130 HPD violations. The city keeps the complete history.

  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at south bulkhead door to roof exit

    Jul 30, 2024

    Open — Not complied with
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household articles at 4th story balcony at 1st stack from north at east at building front at fire escape

    Jan 3, 2023

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household articles at 2nd story balcony at 2nd stack from north at east at building front at fire escape

    Jan 3, 2023

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at 2nd stack from north at east at building front at fire escape

    Jan 3, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 1st room from east at north, the bathroom , the private hallway located at apt a2, 1st story, 1st apartment from north at east

    Aug 4, 2021 · Apt A2

    Closed — Violation dismissed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d8, 4th story, 3rd apartment from west at north

    Aug 4, 2021 · Apt D8

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt a1, 1st story, 1st apartment from east at south

    Aug 4, 2021 · Apt A1

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d7, 4th story, 2nd apartment from north at east

    Aug 4, 2021 · Apt D7

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d3, 4th story, 2nd apartment from south at west

    Aug 4, 2021 · Apt D3

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d2, 4th story, 1st apartment from north at east

    Aug 4, 2021 · Apt D2

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c4, 3rd story, 2nd apartment from east at south

    Aug 4, 2021 · Apt C4

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt b4, 2nd story, 2nd apartment from east at south

    Aug 4, 2021 · Apt B4

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a2, 1st story, 1st apartment from north at east

    Aug 4, 2021 · Apt A2

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt a2, 1st story, 1st apartment from north at east

    Aug 4, 2021 · Apt A2

    Closed — Violation dismissed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt a2, 1st story, 1st apartment from north at east

    Aug 4, 2021 · Apt A2

    Closed — Violation closed
  • CImmediately hazardous

    Code: arrange and make self-closing the doors ... in the entrance located at apt a2, 1st story, 1st apartment from north at east

    Aug 4, 2021 · Apt A2

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Jul 30, 2021

    Open — Nov sent out
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c1, 3rd story, 1st apartment from east at south

    Jul 30, 2021 · Apt C1

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt a4, 1st story, 2nd apartment from east at south

    Jul 30, 2021 · Apt A4

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c6, 3rd story, 1st apartment from south at west

    Jul 30, 2021 · Apt C6

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c8, 3rd story, 3rd apartment from west at north

    Jul 30, 2021 · Apt C8

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c9, 3rd story, 2nd apartment from west at north

    Jul 30, 2021 · Apt C9

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt b3, 2nd story, 2nd apartment from south at west

    Jul 30, 2021 · Apt B3

    Closed — Violation closed
  • BHazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt b5, 2nd story, 1st apartment from west at north

    Jul 30, 2021 · Apt B5

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 1, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 1, 2021

    Closed — Violation dismissed
  • BHazardous

    Remove the illegal fastening double cylinder key operated lock installed at west gates at fence enclosing fire escape at building front

    Jul 1, 2021

    Closed — Violation dismissed
  • BHazardous

    Remove the illegal fastening double cylinder key operated lock installed at south gate at fence enclosing fire escape at building front

    Jul 1, 2021

    Closed — Violation dismissed
  • CImmediately hazardous

    Code: arrange and make self-closing the doors in the entrance located at apt d6, 4th story, 1st apartment from south at west

    May 28, 2021 · Apt D6

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of key operated lock installed on door leading to fire escape window in the 1st room from north located at apt d6, 4th story, 1st apartment from south at west

    May 28, 2021 · Apt D6

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    May 26, 2021 · Apt B8

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt b8, 2nd story, 3rd apartment from west at north

    May 17, 2021 · Apt B8

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 1st room from east, the 4th room from east located at apt b8, 2nd story, 3rd apartment from west at north

    May 17, 2021 · Apt B8

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing electrical outlet cover at south wall in the kitchen located at apt b8, 2nd story, 3rd apartment from west at north

    May 17, 2021 · Apt B8

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, south wall in the foyer located at apt b8, 2nd story, 3rd apartment from west at north

    May 17, 2021 · Apt B8

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from east located at apt b8, 2nd story, 3rd apartment from west at north

    May 17, 2021 · Apt B8

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt b8, 2nd story, 3rd apartment from west at north

    May 17, 2021 · Apt B8

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of over grown vegetation obstructing access from drop ladder to gate leading to exit

    May 10, 2021

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt d6, 4th story, 1st apartment from south at west , section at south

    May 10, 2021 · Apt D6

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt d6, 4th story, 1st apartment from south at west , section at south

    May 10, 2021 · Apt D6

    Closed — Violation closed
  • CImmediately hazardous

    Code: arrange and make self-closing the doors ... in the entrance located at apt d6, 4th story, 1st apartment from south at west , section at south

    May 10, 2021 · Apt D6

    Closed — Violation closed
  • ANon-hazardous

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt d6, 4th story, 1st apartment from south at west

    Apr 5, 2021 · Apt D6

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace with new the broken or defective glass pane upper sash at north window in the 2nd room from north located at apt d6, 4th story, 1st apartment from south at west

    Apr 5, 2021 · Apt D6

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective counter balance upper sash at window to fire escape in the 1st room from north located at apt d6, 4th story, 1st apartment from south at west

    Apr 5, 2021 · Apt D6

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace with new the broken or defective window glass pane upper sash south in the 1st room from north located at apt d6, 4th story, 1st apartment from south at west

    Apr 5, 2021 · Apt D6

    Open — Violation will be reinspected
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ..

    Oct 30, 2020

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 30, 2020

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, south wall in the 1st room from east located at apt d5, 4th story, 1st apartment from west at north

    Nov 18, 2018 · Apt D5

    Open — First no access to re- inspect violation
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the foyer , the private hallway , the kitchen , the bathroom located at apt d5, 4th story, 1st apartment from west at north

    Nov 18, 2018 · Apt D5

    Closed — Violation dismissed

DOB building violations

5 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 29, 1995

    Vp*-violation unserved ecb- dismissed

ECB violations

1 ECB violations, newest first.

  • Class - 1

    Failure to maintain bldg in a code compliant manner.note:flr joist directly under tub in the bathroom of apt a4 on the first flr is in a severe state of disrepair.due to continous water damage over a period of

    Mar 30, 2010 · Penalty $5,000

    Resolve