roofy

Violations at 1538 Coney Island Avenue

Brooklyn, NY 11230 · BBL 3-06536-0045 · Back to the property

HPD housing violations

3 HPD violations, newest first.

  • BHazardous

    Abate the nuisance consisting of vermin roaches throughout 2nd sty apt 2.

    Mar 25, 2005

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective upper glass in west window south east room 2nd sty apt 2.

    Mar 25, 2005

    Open — Nov sent out
  • BHazardous

    Properly secure the loose upper window sash in kitchen 2nd sty apt 2.

    Mar 25, 2005

    Open — Nov sent out

DOB building violations

13 DOB violations, newest first.

  • Construction other optional

    The permit holder of record has informed the dept that he/she has withdrawn from the project. until a new permit holder is in place to ensure inspections occurs per article 116 of chapter 1 of title 28 of the ac you are ordered to stop all work under job b00940936-i1 & make site safe

    Oct 23, 2026

    Dob violation - active
  • Construction other optional

    The permit holder of record has informed the dept that he/she has withdrawn from the project. until a new permit holder is in place to ensure inspections occuras per artical 116 of chapter 1 of title 28 of the ac you are ordered to stop all work under job 320910181 & make site safe

    Oct 23, 2026

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 22, 2025

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 13, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 13, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 19, 2019

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    May 15, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations

48 ECB violations, newest first.

  • Class - 2

    Observed street occupancy, jersey barriers, along with pedestrian walkway occupying the street at expo1. upon research, no dot permits were found on record. stop all street occupancy.provide dot permits for str

    Dec 20, 2025 · Penalty $625

    Resolve
  • Class - 2

    Observed pedestrian walkway at expo 1 unmaintained, littered with debris and garbage. creates tripping and fall hazards for pedestrians temporary pedestrians walkway. stop use of pedestrian walkway at expo 1.ma

    Dec 20, 2025 · Penalty $2,400

    Resolve
  • Class - 1

    Observed stacked storage of material at expo 1. material was stored adjacent to pedestrian walkway reaching a height higher than 3ft with no protections put in place for pedestrians as required by bc. stop all

    Dec 20, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3303.3watchperson.observed closed site with no active work, no workers on site all doors are locked,upon walk entire perimeter, knocked on all doors, calling out for watchperson, no watchperson could be found

    Mar 31, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3307.4 warning signs, personnel, and barriers. observed materials stored on sidewalk with height approx. 5ft high, not guarded by warning signs or enclosed by barriers. observed pedestrian walking adjacent t

    Mar 31, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3303.12 failure to provide elevator in a state of readiness for fire department use. when attempting to perform a construction safety compliance inspection of a new 10 stories mixes use building, i spoke with

    Mar 3, 2025

    Resolve
  • Class - 1

    Site safety manager/coordinator failed to immediately notifiy the department of conditions as required. noted: at time of inspection ssm charles serior #000515 failed to notify dept of buildings about elevator

    Nov 19, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3303.12 failure to provide elevator in a state of readiness for fire department use. at time of access into site spoke w/smm and female worked who indicated elevator was not working/in readiness. female work

    Nov 19, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Approximately 130 linear feet of sidewalk shed was removed at exposure #2 on avenue l. upon research through dob now system, department of buildings did not approve removal of sidewalk shed on avenue l. site sa

    Jul 23, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of my inspection of a 10 story building at roof level (approximately 23800 square feet) site closed and there were no construction activity.upon shouting and banging on fence to alert watchpersons

    Mar 9, 2024 · Penalty $625

    Resolve
  • Class - 1

    At time of inspection observed. at exp#1 yodok's with chained link fence above approx. 50' collapse onto public roadway.; bc3301.2, comply with code

    Nov 22, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute adequate safety measures premises is a 10 story n/b in which a worker on a ladder fell approx 6 ft through a rotted platform into pit in a controlled area at cellar level injuring leg; bc 3

    Jul 18, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    No stair inlays provided. at of my inspection observed no stair inlays were installed at stairs leading from 8th to 9th floor which creates a hazardous tripping condition.provide / install stair inlays

    May 15, 2023

    Resolve
  • Class - 2

    At the time of my inspection of a new 10 story building currently at 9 floor level , i observed safety netting not connected to zero cable at multiple locations on 7 / 8 floors which creates a hazardous condi

    May 15, 2023

    Resolve
  • Class - 1

    At the time of inspection of a 10 story new building under construction at 9 floor level , i observed 8 iron workers with their harnesses upon request for their logs to verify compliance that harnesses were che

    May 15, 2023

    Resolve
  • Class - 1

    At the time of inspection of a 10-story building at 9thfloor level, building approx.146,814 square feet.site closed and there was no construction activity.upon shouting at perimeter and banging on fence to aler

    May 2, 2023 · Penalty $625

    Resolve
  • Class - 1

    Failed to notify the dept of an accident or incident that resulted in a fatality or injury.note a worker tripped and fell over debris.workerwas taken to hospital.as per check of the dept records the permit hold

    Feb 24, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Observed inadequate housekeeping at exp#3. debris consisting of cardboard, garbage bags, wood and other debris and materials. this condition pose a tripping hazard, rodent infestation and fire hazard.

    Jan 16, 2023 · Penalty $625

    Resolve
  • Class - 1

    Watch person and flagman. observed workers moving debris containers into storage zone on roadway and crossing the sidewalk at exp#2, observed no flagger/flagperson as required. failure to provide flagger, creat

    Jan 16, 2023 · Penalty $625

    Resolve
  • Class - 2

    Observed at exp#2, storage zone, plastic barriers, multiple debris container and manlift on roadway and workers moving debris container from site to storage zone. upon review the approved site safety plan, draw

    Jan 16, 2023

    Resolve
  • Class - 1

    Observed workers performing installation of personnel and material hoist at exp#1 under permit #322029522 gc#616234. upon review of department records it was observed that gc license is expired on 06/15/2022 an

    Nov 3, 2022

    Resolve
  • Class - 1

    Material storage. observed materials piled higher than 3 feet at exp#1 inside a work/storage zone. material stored is 2 feet higher than barriers provided. total height of stored materials is 5 feet, barricaded

    Nov 3, 2022 · Penalty $625

    Resolve
  • Class - 1

    Protection of roofs. observed inadequate roof protection on adjacent building at exp#4. roof protection provide does not extend 20 feet as required by code. roof protection provided extends 9 feet. this conditi

    Nov 3, 2022 · Penalty $625

    Resolve
  • Class - 1

    Supported pipe scaffold installed not as per code. observed workers performing construction operation on a an unsafe supported scaffold at exp#4. 1- work levels not fully planked. 2- missing guardrail system. 3

    Nov 3, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Hoist not in a state of readiness. on an active jobsite, observed working deck is at 81 feet, 6th story level, and no hoist provided for fire department use as required by code. this condition puts first respon

    Nov 3, 2022

    Resolve
  • Class - 1

    Failure to provide site safety manager.coordinator present on site at the time of my inspection on an active 10 story nb construction site observed workers dismantling a shed at exposure #3 when request was mad

    Apr 21, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    Site safety not present on site as per code.at time of inspection on an active 10 story nb construction site.notice 4-5 workers dismantling and removing heavy duty bringing at exposure#3 the length at the build

    Apr 21, 2021 · Penalty $10,000

    Resolve
  • Class - 2

    @time of inspection observed ongoing const activities contrary to mayor executive order 120 & sunsequent orders incoporating requirements ofgovernors executive order 202.34 & (adjoinment) order & guidance publi

    Aug 20, 2020

    Resolve
  • Class - 1

    Failure to notify the department of an accident or incident that resulted in a fatality or injury.a worker was shoveling concrete in a tub when we threw out his back.ambulance was called.as per a check of dept

    May 12, 2020

    Resolve
  • Class - 1

    Bc33012-failure to institute and maintain safety equipment measures and temporary construction.note:at the time of my inspection of a purposed 10 story new building in progress i observed a high voltage power l

    Feb 13, 2020

    Resolve
  • Class - 1

    Bc33012-failure to institute and maintain safety equipment measures and temporary construction.note:at the time of my inspection of a purposed 10 story building in progress,upon inspection i observed high volta

    Feb 13, 2020

    Resolve
  • Class - 2

    3307.2.6 requirements for sidewalk- blind spots @time of my inspectionobserved construction fence & pedestrian walkway midway @exp#1 making a turn towards street. observed no "blind spot mirror" installed on

    Nov 16, 2019

    Resolve
  • Class - 2

    3307.2.1 failure to comply with dot regulations @time of inspection observed large generator being stored in roadway @exp#1 on coney island aveune after reviewing dot website it was noted that contractor had

    Nov 16, 2019

    Resolve
  • Class - 2

    3303.3 watch person @time of inspection of above worksite i walked entire exp 1 & 2 along const fence. i observed no construction activity taken place. i looked through viewing panels and knocked on gate and

    Nov 16, 2019

    Resolve
  • Class - 2

    Failure to institute and maintain safety equipment measures or temporary construction.noted:at the time of my inspection of a purposed 10 story nb in progress at grade level i observed at exp#3 there was cmu w

    Aug 15, 2019

    Resolve
  • Class - 1

    Work without a permit.note:at the time of my inspection of a purposed 10 story nb at grade level.upon my inspection i observed demolition inthe subcellar.upon my inspection i observed they were using a brock de

    Aug 15, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Work without permit.noted:at the time of my inspection of a purposed 10 story nb at grade level.i observed demolition being done in subcellar to existing walls with no permit.this can create a unsafe and hazard

    Aug 15, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Sec. 3303.11 failure to maintain adequate means of egress. at time of inspection of an active job site under construction,i observed that the means of egress from cellar to sub cellar on site was not adequately

    Jun 25, 2019

    Resolve
  • Class - 1

    Sec. 3309.9 failure to waterproof adjoinig wall of bldg during construction/demolition operations. at time of inspection of an active job site,i observed that the adjacent wall of the adjoining property at exp#

    Jun 25, 2019

    Resolve
  • Class - 1

    Sec. 3301.1.3 yodocks at street level not as manufactures specifications. note: at time of inspection of an active job site under construction-responding to a complaint,i observed that the yodocks that were

    Jun 25, 2019

    Resolve
  • Class - 2

    Failure to provide adequate protection for pedestrian at street level.(pedestrian protection does not meet requirements). at time of inspection of an active job site,i observed that the street protection for

    Jun 25, 2019

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations-no safety measures in place at sidewalk/street level. note: at time of inspection of an active job site,responding to a complaint

    Jun 25, 2019

    Resolve
  • Class - 1

    At the time of inspection lift director daniel jundef was not on site as is requied by 3319-02 (c)(1) to supervise crane operaitons while crane cd 4713 cn 1326/18 was being used to lift steel beams off flatbe

    May 1, 2019

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35263293p issued on 10/04/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to safeguard all persons & property affected by constru

    Nov 17, 2017

    Resolve
  • Class - 1

    Sec. 3303.13 & 27-1027a. failure to provide a solid 8' construction fence where construction excavation or demolition operations have been abandoned/discontinued or interrupted. noted: upon inspection fence

    Sep 14, 2012 · Penalty $400

    Resolve
  • Class - 2

    Expired permit. noted:construction fence in place at above location. fn permit #301820705 expired on 11-1-10. rem:renew permit.

    Apr 12, 2012 · Penalty $800

    Resolve
  • Class - 1

    Prohibited sign on jobsite fence. noted: following signs on display. (18) signs in hebrew,promoting an event @ a remote location to occur on 7/5/11. remedy: remove illegal signs.

    Jun 30, 2011 · Penalty $12,500

    Resolve
  • Class - 1

    Prohibited sign on sidewalk shed or construction fence.noted: following signs on display. 1)1 5'x 2' on site blinds & drapery cleaning & repair. 2) 2'x 3' "music festival" 3) 1 5' x 2' "jerasulem $12,000" 4)1'

    Aug 4, 2009 · Penalty $10,000

    Resolve