840 East 8 Street
Brooklyn, NY 11230BBL 3-06510-0001Map
Owner of record: 840 East 8th Street L
840 East 8 Street is an elevator apartment building built in 1953 in Brooklyn, 11230. It has 168 residential units across 6 floors. The owner of record is 840 East 8th Street L. HPD has recorded 49 housing violations here, most recently on May 11, 2023. 25 of the 49 most recent violations are still open.
- HPD violations
- 49
- DOB violations
- 55
- ECB violations
- 23
- HPD complaints
- 55
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 49
- BHazardous
Properly repair or replace the broken or defective intercome system at private hall at west wall in the entrance located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles throughout in the kitchen located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective porceline enemail glaze at sink in the kitchen located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - BHazardous
Properly repair the source and abate the evidence of a water leak at window recess in the 2nd room from north located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment denied - BHazardous
Refit upper and lower sash window at fire escape in the 2nd room from north located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from north located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - ANon-hazardous
Paint metal in accordance with dept. regulation at raditor in the 2nd room from north located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - BHazardous
Properly repair the source and abate the evidence of a water leak at window recess in the kitchen located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - BHazardous
Properly repair the source and abate the evidence of a water leak at window recess in the 1st room from east located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment denied
Show 39 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - ANon-hazardous
Paint metal in accordance with dept. regulation at reditor in the 1st room from east located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective grout around bathtub in the bathroom located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - ANon-hazardous
Paint metal in accordance with dept. regulation at raditor in the 1st room from north located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - BHazardous
Properly repair the source and abate the evidence of a water leak at window recess at east wall in the 1st room from north located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment denied - BHazardous
Repair the roof so that it will not leak at ceiling in the entire apartment located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment denied - ANon-hazardous
Repair leaky water closet flush pipe connection at water supply line to water closet in the bathroom located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 6m, 6th story, 1st apartment from north at east
May 11, 2023 · Apt 6M
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the sill and recess of the window at north in the kitchen located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east at south located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Open — Not complied with - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator at east in the 1st room from east at south located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the sill and recess of the window at east in the 1st room from east at south located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the sill and recess of the window at north in the 1st room from east at north located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator at north in the 1st room from east at north located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the sill and recess of the window at north in the 4th room from east located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from east located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 4th room from east located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective (inoperative) bell buzzer intercommunication system, from the vestibule, 1st., story public hall to the panel on the north wall in the foyer located at apt 6m, 6th story, 1st apartment from north at east
Jul 2, 2019 · Apt 6M
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective mail box on the east wall at public hall, 1st story
Jul 2, 2019
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 25, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 25, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 25, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 25, 2017
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 25, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 25, 2017
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 6m, 6th story, 1st apartment from north at east
Oct 25, 2017 · Apt 6M
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable located at apt 6m, 6th story, 1st apartment from north at east
Oct 25, 2017 · Apt 6M
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective light fixture at ceiling in the kitchen located at apt 6m, 6th story, 1st apartment from north at east
Oct 25, 2017 · Apt 6M
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 6m, 6th story, 1st apartment from north at east
Oct 25, 2017 · Apt 6M
Closed — Violation closed - BHazardous
Properly repair the broken or defective lower sash spring balance at first window at north in the 5th room from east located at apt 6m, 6th story, 1st apartment from north at east
Oct 25, 2017 · Apt 6M
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 6m, 6th story, 1st apartment from north at east
Oct 25, 2017 · Apt 6M
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 5th room from east located at apt 6m, 6th story, 1st apartment from north at east
Oct 25, 2017 · Apt 6M
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallway located at apt 3a, 3rd story, 1st apartment from south at west , section at north
Sep 15, 2017 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from north located at apt 3a, 3rd story, 1st apartment from south at west , section at north
Sep 15, 2017 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 3a, 3rd story, 1st apartment from south at west , section at north
Sep 15, 2017 · Apt 3A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 8, 2015
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 4th room from east, the foyer , the bathroom located at apt 4m, 4th story, 1st apartment from north at east
Nov 25, 2009 · Apt 4M
Open — Certification postponment denied - ANon-hazardous
D26-10.01 adm code refit window sashes 6 sty 6m east apt 6m thruout. , section '' ''
Nov 13, 1986 · Apt 6M
Closed — Violation closed
DOB building violations · 55
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2020
Dob violation - resolved - Construction other optional
Borough commissioner has ordered all work stopped under permit # 321522624 on 12/05/17 because applicant withdrawal from project. stop all work immediately and make site safe remedy:stop all work immediately and make site safe. contact the borough commissioner's office at 718-802-3677
Dec 6, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2016
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2014
Dob violation - resolved - Elevator elevatorrequired
This pvt replaces pvt 489006
Oct 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2010
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatorrequired
3p4478
Sep 25, 2001
Dob violation - resolved - Elevator elevatorrequired
3p4479
Sep 25, 2001
Dob violation - resolved - Elevator elevatorrequired
3p4476
Sep 25, 2001
Dob violation - resolved - Elevator elevatorrequired
3p4477
Sep 25, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
ECB violations · 23
- Class - 1
Cease use item: elevator found out of service with work being performed without the required permit, in violation of 27-147, b8f - work without a permit - elevator. remedy: obtain the required permit and correc
Sep 29, 2026 · Penalty $1,250
Active - Class - 2
Hoistway door on 6th floor remains locked with car at floor , repair
Feb 15, 2022 · Penalty $1,562
Resolve - Class - 2
Sec. 3314.4.3.2 installation inspection. noted: at time of inspection suspended scaffold was installed on exp#3. workers on site was unable to provide installation inspection report. remedy: comply w/code,provi
May 19, 2015 · Penalty $830
Resolve - Class - 2
Sec. 3314.4.3.1 inspection prior to installation. noted: at time of inspection suspended scaffold was installed on exp#3. workers on site was unable to provide a inspection report of all support devices & the
May 19, 2015 · Penalty $830
Resolve - Class - 2
Sec. 3314.3.2 scaffold design. noted: at time of inspection suspended scaffold was installed on exp#3. workers were unable to provide designed drawing by licensed rigger for 2 point suspended scaffold.
May 19, 2015 · Penalty $830
Resolve - Class - 2
67x10.39xm7.59y10.60q3.52b7.52b7.59j1.68m7.9 69m7 39m car top run box 52b7 anti spi-outs 59j adjust for brake stop 67x 2wy communications
Apr 24, 2009
Resolve - Class - 2
67x07.39m7.52b7.53h14.59j1.59m7.68m7.69m87.67x 2 way communication 39m top run bx 52b anti spin-outs 39q car top light 59j adjust brake stop 59m cotter pins
Apr 24, 2009
Resolve - Class - 2
67x7.68m7.69m7.40d6.60q3.59y10.39m7.67x 2 way communication 40d smoke hole grate 39m cdr top run box
Apr 24, 2009 · Penalty $2,500
Resolve - Class - 2
67x10.68m07.69m07.59j01.59y2.60q3.52b7.39m7.67x 2way communication 59j brake stop 52b anti spin-outs 39m car top run box
Apr 24, 2009
Resolve - Non-hazardous
Cease use.55y13,55y02,58y13,29a09,10b11.58y13-replace oily brakes shoes.call 212-566-5539 to reinspect befor returning to service.29a09-remove paper shim on dn norm,10b11-replace w/2 new ones.
Apr 12, 2007 · Penalty $500
Resolve
Show 13 more ↓
- Non-hazardous
83x10.83-replace 6fl door keeper & restore elevator to service so thata full inspection can be made by this dept.
Mar 5, 2007 · Penalty $180
Resolve - Non-hazardous
46h12/1b10/1b=alarm not working when emergency stop sw pulled.
Jan 5, 2004 · Penalty $180
Resolve - Non-hazardous
40b07 provide up overspeed tripping switch and certify to proper calibration as per ansi a:17.1 sections 206.4a and 206.4b(3)
Dec 1, 2001 · Penalty $180
Resolve - Non-hazardous
40b07 provide up overspeed tripping switch and certify to proper calibration as per ansi a:17.1 section 206.4a and 206.4b(3)
Dec 1, 2001 · Penalty $180
Resolve - Non-hazardous
40b07 - provide up overspeed tripping switch and certify to proper calibration as per ansi a17.1 section 206.4b(3) and 206.4a
Dec 1, 2001
Resolve - Non-hazardous
40b07 40b=provide up overspeed tripping switch and certify to proper calibration as per ansi a17.1 section 206.4a and 206.4b(3) file application and obtain permit
Dec 1, 2001 · Penalty $180
Resolve - Non-hazardous
Plumbing fixture not properly trapped and vented. kitchen sink not properly trapped and vented in apt 6n. remedy: properly trap & vent kitchen sink.
Jun 20, 1995
Resolve - Non-hazardous
25h,47h. 25-renew door operator. 47-renew governor rope.
Nov 4, 1994
Resolve - Non-hazardous
25h. 25-renew door operator.
Nov 1, 1994
Resolve - Non-hazardous
73# perform 5yr. test properly tag device and file elv.3 form.
Dec 4, 1992
Resolve - Non-hazardous
73# perform 5yr. test properly tag device and file elv. 3 form.
Dec 4, 1992
Resolve - Non-hazardous
73# perform 5yr. test properly tag device and file elv. 3 form.
Dec 4, 1992
Resolve - Non-hazardous
73# perform 5yr. test properly tag device and file elv. 3 form.
Dec 4, 1992
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 28, 2026 · Apt 12F
Close - Water leak
Heavy flow
Jan 28, 2026 · Apt 12F
Close - Unsanitary condition
Pests
Jan 28, 2026 · Apt 12F
Close - Safety
Fire escape
Sep 27, 2023 · Apt BLDG
Close - Safety
Fire escape
Sep 27, 2023 · Apt BLDG
Close - Electric
Outlet/switch
Jun 23, 2023 · Apt 6M
Close - Door/window
Door frame
Jun 23, 2023 · Apt 6M
Close - Water leak
Slow leak
Jun 23, 2023 · Apt 6M
Close - General
Bell/buzzer/intercom
Jun 23, 2023 · Apt 6M
Close - Safety
Window guard broken/missing
Jun 23, 2023 · Apt 6M
Close
Show 40 more ↓
- Appliance
Refrigerator
May 9, 2023 · Apt 6M
Close - Door/window
Door
May 9, 2023 · Apt 6M
Close - Paint/plaster
Wall
May 9, 2023 · Apt 6M
Close - Door/window
Door
May 9, 2023 · Apt 6M
Close - Appliance
Electric/gas range
May 9, 2023 · Apt 6M
Close - Door/window
Window frame
May 9, 2023 · Apt 6M
Close - Safety
Smoke detector
May 9, 2023 · Apt 6M
Close - Plumbing
Basin/sink
May 9, 2023 · Apt 6M
Close - Plumbing
Toilet
May 9, 2023 · Apt 6M
Close - Unsanitary condition
Mold
May 9, 2023 · Apt 6M
Close - Plumbing
Toilet
May 9, 2023 · Apt 6M
Close - Water leak
Slow leak
May 9, 2023 · Apt 6M
Close - Plumbing
Basin/sink
May 9, 2023 · Apt 6M
Close - Flooring/stairs
Floor
May 9, 2023 · Apt 6M
Close - General
Bell/buzzer/intercom
May 9, 2023 · Apt 6M
Close - Heat/hot water
Apartment only
May 30, 2021 · Apt 3H
Close - Heat/hot water
Entire building
Nov 16, 2020 · Apt 1C
Close - Door/window
Window frame
Jun 26, 2019 · Apt 6M
Close - Flooring/stairs
Floor
Jun 26, 2019 · Apt 6M
Close - Water leak
Slow leak
Jun 26, 2019 · Apt 6M
Close - Door/window
Door
Jun 26, 2019 · Apt 6M
Close - Unsanitary condition
Garbage/recycling storage
Jun 26, 2019 · Apt 6M
Close - Outside building
Pavement
Jun 26, 2019 · Apt 6M
Close - General
Bell/buzzer/intercom
Jun 26, 2019 · Apt 6M
Close - General
Mailbox
Jun 26, 2019 · Apt 6M
Close - Water leak
Damp spot
May 29, 2018 · Apt 2E
Close - Door/window
Window frame
Oct 16, 2017 · Apt 6M
Close - Water leak
Slow leak
Oct 16, 2017 · Apt 6M
Close - Paint/plaster
Wall
Oct 16, 2017 · Apt 6M
Close - Paint/plaster
Wall
Sep 11, 2017 · Apt 3A
Close - Paint/plaster
Wall
Sep 11, 2017 · Apt 3A
Close - Paint/plaster
Wall
Sep 11, 2017 · Apt 3A
Close - Paint/plaster
Ceiling
Sep 11, 2017 · Apt 3A
Close - Unsanitary condition
Pests
May 30, 2017 · Apt 5F
Close - Heat/hot water
Apartment only
Oct 10, 2016 · Apt 4L
Close - Elevator
Maintenance
Nov 27, 2014 · Apt BLDG
Close - Plumbing
Water-leaks
Sep 14, 2011 · Apt 2H
Close - Plumbing
Radiator
Nov 30, 2010 · Apt 1C
Close - Paint/plaster
Ceiling
Feb 17, 2010 · Apt 5E
Close - Plumbing
Water-leaks
Feb 17, 2010 · Apt 5E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1953
- Floors
- 6
- Residential units
- 168
- Building area
- 180,000 ft²
- Lot area
- 60,250 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 45
- Block / lot
- 6510 / 1
- Assessed value
- $5,691,150
- Landmark / historic district
- No
HPD registration #345580, last renewed Nov 19, 2025.
Questions about 840 East 8 Street
Who owns 840 East 8 Street?
The owner of record in NYC Department of City Planning PLUTO data is 840 East 8th Street L.
Does 840 East 8 Street have violations?
Yes. NYC HPD has recorded 49 housing violations at this property.
Is 840 East 8 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 840 East 8 Street built?
City records list 1953 as the year it was built.
How many apartments are in 840 East 8 Street?
It has 168 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.