Violations at 2100 Cropsey Avenue
Brooklyn, NY 11214 · BBL 3-06490-0001 · Back to the property
HPD housing violations
The newest 50 of 60 HPD violations. The city keeps the complete history.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Mar 25, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 8, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west
Oct 9, 2008 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster ceiling kitchen 1 sty north apt 1f er1 , section '' ''
Mar 2, 1999 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster ceiling northeast room 1 sty north apt 1f er1 , section '' ''
Mar 2, 1999 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department waterstained ceilings and walls entrance foyer 1 sty apt 1a. , section '' ''
Oct 1, 1996 · Apt 1A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires ceiling center room 1 sty apt 1a. , section '' ''
Oct 1, 1996 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture bathroom 1 sty apt 1a. , section '' ''
Oct 1, 1996 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles bathroom 1 sty apt 1a. , section '' ''
Oct 1, 1996 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls bathroom 1 sty apt 1a. , section '' ''
Oct 1, 1996 · Apt 1A
Open — Nov sent out - BHazardous
Replace with new the missing strike plate at entrance door vestibule to 1 sty public hall
Sep 26, 1992
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
May 20, 1991
Open — Nov sent out - ANon-hazardous
Refit door entrance street to vestibule 1 sty
May 20, 1991
Open — Nov sent out - BHazardous
Replace with new the missing strike plate vestibule door to 1 sty public hall
May 20, 1991
Open — Nov sent out - BHazardous
Replace with new the broken or defective wire glass upper window 3 sty public hall north center
May 20, 1991
Open — Nov sent out - BHazardous
Replace with new the broken or defective wire glass lower window sash 3 sty public hall northeast section
May 20, 1991
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and wall 4 sty public hall
May 20, 1991
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile 3rd and 4th sty public hall
May 20, 1991
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles & grout 1 sty south apt 1a bathroom. , section '' ''
May 20, 1991 · Apt 1A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor 1 sty south apt 1a front hall rear bathroom. , section '' ''
May 20, 1991 · Apt 1A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor at kitchen cabinet & radiator rear room 1 sty south apt 1a. , section '' ''
May 20, 1991 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling thru out 1 sty south apt 1a. , section '' ''
May 20, 1991 · Apt 1A
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective plaster board clg cellar thru out.
May 20, 1991
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective cement clg boiler room cellar.
May 20, 1991
Open — Nov sent out - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color clg bathroom 1 sty apt 1a. , section '' ''
May 20, 1991 · Apt 1A
Open — Nov sent out - BHazardous
D26-16.01 adm code repair the leaky and/or defective faucets washbasin & bathtub 1 sty apt 1a. , section '' ''
May 20, 1991 · Apt 1A
Open — Nov sent out - BHazardous
Replace with new the missing locking device vestibule entrance door to building 1 sty public hall.
May 16, 1991
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor and walls vestibule lobby 1 sty public hall.
May 16, 1991
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking device entrance door vestibule to 1 sty public hall.
May 16, 1991
Open — Nov sent out - BHazardous
Remove the illegal fastening rear yard west.
May 16, 1991
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering 5th tread up from vestibule to 1 sty public hall.
Mar 28, 1991
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thru out 1 sty apt 1e. located at apt 1e
Mar 28, 1991 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at riser 1 sty apt 1e southeast room er1. located at apt 1e
Mar 28, 1991 · Apt 1E
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak ceiling 1 sty apt 1e bathroom. located at apt 1e
Mar 28, 1991 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall 1 sty apt 1e bathroom er1. located at apt 1e
Mar 28, 1991 · Apt 1E
Open — Nov sent out - BHazardous
Replace with new the broken or defective mailboxes 1 sty public hall rear.
Mar 28, 1991
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking device entrance door vestibule to1 sty public hall.
Mar 28, 1991
Open — Nov sent out - ANon-hazardous
Refit door entrance street to vestibule 1 sty.
Dec 24, 1990
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance vestibule to 1 sty public hall.
Dec 24, 1990
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock set entrance door vestibule to 1 sty public hall.
Dec 24, 1990
Open — Nov sent out - BHazardous
Replace with new the broken or defective mailboxes 1 sty public hall.
Dec 24, 1990
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches thru out 4 sty northwest apt 4f kitchen and center room. located at apt 4f
Dec 24, 1990 · Apt 4F
Open — Nov sent out - BHazardous
Replace with new the broken or defective electrical outlets 4 sty northwest apt 4f kitchen. located at apt 4f
Dec 24, 1990 · Apt 4F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color wall at window 4 sty northwest apt 4f kitchen. located at apt 4f
Dec 24, 1990 · Apt 4F
Open — Nov sent out - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 2 sty west apt 2c. , section '' ''
Dec 18, 1990 · Apt 2C
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed leak ceilings 2 sty west apt 2c center and north rear rooms. , section '' ''
Dec 18, 1990 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thru out 2 sty west apt 2c. , section '' ''
Dec 18, 1990 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector no battery 1 sty southwest apt 1d vasilopoulos. , section '' ''
Jun 27, 1989 · Apt 1D
Open — Nov sent out
DOB building violations
17 DOB violations, newest first.
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Class - 1
Use of rigging equipment w/o a rigger's license.noted: c-hook rope suspended scaffold installed at exp#1 at 4th flr level w/o notification by license rigger of the bldg dept.remedy;obtain licensed rigger.
Sep 20, 2011 · Penalty $4,800
Active