roofy

Violations at 2100 Cropsey Avenue

Brooklyn, NY 11214 · BBL 3-06490-0001 · Back to the property

HPD housing violations

The newest 50 of 60 HPD violations. The city keeps the complete history.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2023

    Closed — Violation dismissed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Mar 25, 2022

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 29, 2019

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 8, 2015

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west

    Oct 9, 2008 · Apt 1D

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster ceiling kitchen 1 sty north apt 1f er1 , section '' ''

    Mar 2, 1999 · Apt 1F

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster ceiling northeast room 1 sty north apt 1f er1 , section '' ''

    Mar 2, 1999 · Apt 1F

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department waterstained ceilings and walls entrance foyer 1 sty apt 1a. , section '' ''

    Oct 1, 1996 · Apt 1A

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of exposed electrical wires ceiling center room 1 sty apt 1a. , section '' ''

    Oct 1, 1996 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective ceiling light fixture bathroom 1 sty apt 1a. , section '' ''

    Oct 1, 1996 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tiles bathroom 1 sty apt 1a. , section '' ''

    Oct 1, 1996 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls bathroom 1 sty apt 1a. , section '' ''

    Oct 1, 1996 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Replace with new the missing strike plate at entrance door vestibule to 1 sty public hall

    Sep 26, 1992

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    May 20, 1991

    Open — Nov sent out
  • ANon-hazardous

    Refit door entrance street to vestibule 1 sty

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    Replace with new the missing strike plate vestibule door to 1 sty public hall

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective wire glass upper window 3 sty public hall north center

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective wire glass lower window sash 3 sty public hall northeast section

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and wall 4 sty public hall

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tile 3rd and 4th sty public hall

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tiles & grout 1 sty south apt 1a bathroom. , section '' ''

    May 20, 1991 · Apt 1A

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor 1 sty south apt 1a front hall rear bathroom. , section '' ''

    May 20, 1991 · Apt 1A

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor at kitchen cabinet & radiator rear room 1 sty south apt 1a. , section '' ''

    May 20, 1991 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling thru out 1 sty south apt 1a. , section '' ''

    May 20, 1991 · Apt 1A

    Open — Nov sent out
  • BHazardous

    D26-10.01 adm code properly repair with similar material the broken or defective plaster board clg cellar thru out.

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    D26-10.01 adm code properly repair with similar material the broken or defective cement clg boiler room cellar.

    May 20, 1991

    Open — Nov sent out
  • BHazardous

    D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color clg bathroom 1 sty apt 1a. , section '' ''

    May 20, 1991 · Apt 1A

    Open — Nov sent out
  • BHazardous

    D26-16.01 adm code repair the leaky and/or defective faucets washbasin & bathtub 1 sty apt 1a. , section '' ''

    May 20, 1991 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Replace with new the missing locking device vestibule entrance door to building 1 sty public hall.

    May 16, 1991

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tile floor and walls vestibule lobby 1 sty public hall.

    May 16, 1991

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective locking device entrance door vestibule to 1 sty public hall.

    May 16, 1991

    Open — Nov sent out
  • BHazardous

    Remove the illegal fastening rear yard west.

    May 16, 1991

    Open — Nov sent out
  • BHazardous

    Remove the torn and/or loose floor covering 5th tread up from vestibule to 1 sty public hall.

    Mar 28, 1991

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thru out 1 sty apt 1e. located at apt 1e

    Mar 28, 1991 · Apt 1E

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at riser 1 sty apt 1e southeast room er1. located at apt 1e

    Mar 28, 1991 · Apt 1E

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of concealed water leak ceiling 1 sty apt 1e bathroom. located at apt 1e

    Mar 28, 1991 · Apt 1E

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall 1 sty apt 1e bathroom er1. located at apt 1e

    Mar 28, 1991 · Apt 1E

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective mailboxes 1 sty public hall rear.

    Mar 28, 1991

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective locking device entrance door vestibule to1 sty public hall.

    Mar 28, 1991

    Open — Nov sent out
  • ANon-hazardous

    Refit door entrance street to vestibule 1 sty.

    Dec 24, 1990

    Open — Nov sent out
  • BHazardous

    Arrange and make self-closing the doors entrance vestibule to 1 sty public hall.

    Dec 24, 1990

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective lock set entrance door vestibule to 1 sty public hall.

    Dec 24, 1990

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective mailboxes 1 sty public hall.

    Dec 24, 1990

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice and roaches thru out 4 sty northwest apt 4f kitchen and center room. located at apt 4f

    Dec 24, 1990 · Apt 4F

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective electrical outlets 4 sty northwest apt 4f kitchen. located at apt 4f

    Dec 24, 1990 · Apt 4F

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color wall at window 4 sty northwest apt 4f kitchen. located at apt 4f

    Dec 24, 1990 · Apt 4F

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 2 sty west apt 2c. , section '' ''

    Dec 18, 1990 · Apt 2C

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of concealed leak ceilings 2 sty west apt 2c center and north rear rooms. , section '' ''

    Dec 18, 1990 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thru out 2 sty west apt 2c. , section '' ''

    Dec 18, 1990 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector no battery 1 sty southwest apt 1d vasilopoulos. , section '' ''

    Jun 27, 1989 · Apt 1D

    Open — Nov sent out

DOB building violations

17 DOB violations, newest first.

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 14, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations

1 ECB violations, newest first.

  • Class - 1

    Use of rigging equipment w/o a rigger's license.noted: c-hook rope suspended scaffold installed at exp#1 at 4th flr level w/o notification by license rigger of the bldg dept.remedy;obtain licensed rigger.

    Sep 20, 2011 · Penalty $4,800

    Active