roofy

Violations at 1511 Independence Avenue

Brooklyn, NY 11228 · BBL 3-06485-0003 · Back to the property

HPD housing violations

45 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at the west wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective base cabinet door at the north wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Refit entrance door in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective wood saddle at entrance door. in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective door lock at entrance door in the 1st room from east at south located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective entrance door from south at west in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 6, 2025 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt ground, 1st story, 1st apartment from north at east

    May 25, 2022 · Apt GROUND

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 9, 2022

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling in the 1st room from east at south located at apt ground, 1st story, 2nd apartment from west at north original violation 14453357 issued 20-jul-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 20, 2021 · Apt GROUND

    Open — Defect letter issued
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt firstf, 1st story, 2nd apartment from west at north

    Jul 20, 2021 · Apt FIRSTF

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling in the 1st room from east at south located at apt ground, 1st story, 2nd apartment from west at north

    Jul 20, 2021 · Apt GROUND

    Closed — Violation closed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at east wall in the 1st room from east at south located at apt ground, 1st story, 2nd apartment from west at north

    Jul 20, 2021 · Apt GROUND

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 19, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 19, 2021

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the nuisance consisting of offensive sewage odor emanating from cellar to the entire apartment located at apt agroun, 1st story

    Feb 27, 2020 · Apt AGROUN

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, apartment at west

    Dec 7, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt a, 1st story, apartment at west

    Dec 7, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt a, 1st story, 1st apartment from west at north

    Nov 25, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east at south located at apt a, 1st story, 1st apartment from west at north

    Nov 25, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, 1st apartment from west at north

    Nov 25, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective door frame in the 2nd room from north at east located at apt a, 1st story

    Jun 5, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color south wall in the 2nd room from north at east located at apt a, 1st story

    Jun 5, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at north located at apt a, 1st story

    Jun 5, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt a, 1st story

    Jun 5, 2019 · Apt A

    Closed — Violation closed
  • ANon-hazardous

    Repair the broken or defective rain leader at east exterior wall at building rear

    May 1, 2019

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing located at apt a, 1st story, apartment at north

    May 1, 2019 · Apt A

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the door frame in the entrance located at apt a, 1st story, apartment at north

    May 1, 2019 · Apt A

    Closed — Violation closed
  • ANon-hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt a, 1st story, apartment at north

    May 1, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east at south located at apt a, 1st story, apartment at north

    May 1, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Replace with new the missing electrical outlet cover at east wall in the 1st room from east at south located at apt a, 1st story, apartment at north

    May 1, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at south located at apt a, 1st story, 1st apartment from west at north

    Apr 25, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt a, 1st story, 1st apartment from west at north

    Apr 25, 2019 · Apt A

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story, apartment at west

    Apr 2, 2011 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening key operated double cylinder lock at entrance to building

    Jan 26, 2008

    Open — Nov certified late
  • CImmediately hazardous

    Remove the illegal fastening double cylinder key operated lock installed at metal entrance door to building

    Feb 16, 2007

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening double cylinder key lock installed wrought iron entrance door at public hall, 1st story

    Mar 1, 2006

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of evidence of water leak ceiling in the 2nd room from north at east located at apt 2flr, 2nd story

    Mar 1, 2006 · Apt 2FLR

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling 1st and in the 2nd room from north at east located at apt 2flr, 2nd story

    Mar 1, 2006 · Apt 2FLR

    Open — Nov sent out

DOB building violations

The newest 50 of 77 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 19, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed

ECB violations

7 ECB violations, newest first.

  • Class - 2

    At 1st floor hallway wall has horizontal crack. crawl space ventilation window at exposure #1 and 3 which required under bc 27-762b has been sealed., repair and/or replace

    Aug 12, 2021 · Penalty $312

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. at roof material stored,wood pallet &(compound)buckets on roof. remedy: remove debris from roof/repair & replace.

    Jul 26, 2020 · Penalty $312

    Resolve
  • Class - 2

    Failure to maintain building in code complaint manner. at time of inspection observed the crawl space underneath the apt is fully sealed without any ventilation holes., repair and/or replace

    Mar 11, 2020

    Resolve
  • Class - 1

    Failure to maintain building in a code compliant manner. at front of premises there is a crack from fallen stucco at second floor, there is also a hole in the bedroom ceiling along with insufficient ventilation

    Nov 25, 2019 · Penalty $1,250

    Active
  • Class - 3

    Failure to maintain bld in code compliant manner.noted:rear of said address having liter pipe disconnected/separated.brick work behind pipe with minor pointing needed.picture taken.rem:maintain exterior wall.

    Apr 23, 2019 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain in a code compliant manner.the front brick exterior wall and the front and rear reinforced concrete foundation walls arecracked,spalling and defective. the rebar at the front and rear founda

    Dec 5, 2013 · Penalty $2,500

    Resolve
  • Non-hazardous

    49.49 no check valu(back flow preventer)on boiler feed line.

    Apr 11, 2001

    Resolve