Violations at 247 Bay 19 Street
Brooklyn, NY 11214 · BBL 3-06464-0001 · Back to the property
HPD housing violations
13 HPD violations, newest first.
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story
Jun 16, 2021 · Apt A
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt a, 1st story, 1st apartment from east at south
May 24, 2021 · Apt A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a, 1st story, 1st apartment from east at south
May 24, 2021 · Apt A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 1st room from east located at apt a, 1st story, 1st apartment from west at north
Sep 2, 2015 · Apt A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west and east wall in the 1st room from north located at apt a, 1st story, 1st apartment from west at north
Sep 2, 2015 · Apt A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east located at apt 1flr, 1st story, 1st apartment from north at east , section at east
Jun 16, 2014 · Apt 1FLR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall in the 1st room from east located at apt 1flr, 1st story, 1st apartment from north at east
Jun 16, 2014 · Apt 1FLR
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from east located at apt 1flr, 1st story, 1st apartment from north at east
Jun 16, 2014 · Apt 1FLR
Open — Nov sent out - BHazardous
Abate the nuisance consisting of loose sucttle ladder at public hall, 2nd story
Jul 31, 2013
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood casing around street entrance door , 1st story
May 1, 2009
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door frame at entrance to building (309 bay 19 street)
Sep 19, 2008
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door at entrance to building (309 bay 19 street)
Sep 19, 2008
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department door frame and door at entrance to building( 309 bay 19 street)
Sep 19, 2008
Open — Nov sent out
DOB building violations
5 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Class - 2
B254,15,32a,50a,b,c,d,e,34b/ 50a- fresh air intake fan inoperative. 50b- flue pipe not properly sealed to chimney. 50c- drain valve leaking.50d- mixing valve for hot water leaking. 50e- fresh air intake fan not
Jul 20, 2012
Resolve