Violations at 225 Bay 17 Street
Brooklyn, NY 11214 · BBL 3-06463-0012 · Back to the property
HPD housing violations
The newest 50 of 283 HPD violations. The city keeps the complete history.
- ANon-hazardous
Paint metal in accordance with dept. regulation at ceiling underneath intermediate landing at public hall stairs, 1st story
Sep 16, 2026
Open — Nov sent out - BHazardous
Replace with new the missing latch set at door at compactor closet, 1st story
Sep 16, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch set at building entrance door
Sep 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective latch at building entrance door
Jun 19, 2026
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at window header 1st from south at west . in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west original violation 17892225 issued 13-may-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 13, 2025 · Apt 2C
Open — Defect letter issued - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 13, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set assembly at the entrance door to compactor closet, at public hall, 2nd story
May 13, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at the entrance door to compactor closet, at public hall, 2nd story
May 13, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set assembly at the entrance door to compactor closet, at public hall, 1st story
May 13, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at the entrance to compactor closet , at public hall, 1st story
May 13, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, in the 2nd room from east at south located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and walls in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout joints of the ceramic tiles at south, west and north walls, in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at grout joints of the ceramic tiles at south, west and north walls around bathtub, in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles, in the foyer located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles, in the private hallway located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the 2nd room from east at south located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing, in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash 1st window from east at south, in the 2nd room from east at south located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at window header 1st from south at west . in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the window header 1st from south at west, in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the west wall, in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
May 13, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 1st story
Jan 3, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Jan 3, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at the entrance to compactor closet, at public hall, 1st story
Nov 22, 2024
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of air conditioner blocking walkway at 1st fire escape from north, 2nd story
May 31, 2024
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing door stopper at building front entrance door , 1st story
May 15, 2024
Open — Nov sent out - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
May 15, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 1st, 2nd, 3rd and 4th granite step treads up from intermidiate landing at public hall stairs, 1st story
May 15, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 13, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 1st marble tread up from bottom at public hall stairs, 1st story
Mar 13, 2024
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 1b, 1st story, 1st apartment from north at east
Mar 13, 2024 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the cieling and east wall in the 4th room from north located at apt 1b, 1st story, 1st apartment from north at east
Mar 13, 2024 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak the cieling in the 1st room from north located at apt 1b, 1st story, 1st apartment from north at east
Mar 13, 2024 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the cieling in the 1st room from north located at apt 1b, 1st story, 1st apartment from north at east
Mar 13, 2024 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper glass pane at west wall from 2nd story to 3rd story at public hall stairs
Feb 6, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective transom light glass pane at east wall at 3rd story bulkhead at public hall
Feb 6, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door, latch, at 1st story at public hall
Feb 6, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at 1st stack from north at west at building front at fire escape
Feb 6, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 2, 2023
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective heavy duty electrical lock at building entrance door
Aug 29, 2023
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard
Aug 27, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Jul 17, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north
Jul 17, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective 1st and 2nd window from north at east, lower sash counter balance in the 1st room from north at east located at apt 2c, 2nd story, 1st apartment from west at north
Jul 17, 2023 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 30 sq ft at all walls and ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north
Jul 17, 2023 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tile, approx 6 sq ft in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north
Jul 17, 2023 · Apt 2C
Closed — Violation closed
DOB building violations
50 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 17, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
Hazardous
Apr 6, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 6, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 6, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 5, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations
20 ECB violations, newest first.
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000153912y0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $3,125
Active - Class - 3
Violation of parking regulations in a residential district. noted: 2 vehicles park on grass/green side yard. one vw nyp gbn-8988 & one chevy nyp ftj-4436 in an r5 residential district. remedy: comply w/zoning
Apr 8, 2019
Resolve - Class - 2
Violation of parking regulations in a residential district:noted-at time of inspection it was observed in the rear lot was a black 4 door vehicle w/ commercial plates,plate#37985-md new york commercial parked i
Mar 19, 2019
Resolve - Class - 2
Violation of parking regulations in a residential district. noted-at time of inspection it was observed that a white van w/ adt written on it and had commercial plates,plate#50777md new york commercial was park
Mar 19, 2019
Resolve - Class - 3
Violation of parking regulation in a residential district observed a towing truck stored in the rear of a common driveway red ford f-350 with sign of tripe a emergency services parked w/o license plates nor
Mar 23, 2018 · Penalty $250
Resolve - Class - 2
Failure to file c of c for nov #35111782n issued on 9/21/14. remedy: file correction.
Dec 17, 2014 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner use of prohibited door &/or hardware per bc 1008.1.8. noted: at bulkhead,door opening to roof is padlocked. pad lockable barrel bolt installed on door.
Sep 21, 2014 · Penalty $2,500
Resolve - Class - 2
B254:34a/b,50,50a,50b,50c. new bl# ao smith.50:boiler flue pipe loose & in contact.50a:castiron circulator in domestic water pipe.50b:black pipe used in both domestic safety valve discharge pipes.50c:control co
Jun 3, 2013 · Penalty $250
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a certificate of correction - for ecb notice of violation #34808735y issued 12/16/09 for work w/o permit: @ cellar installed roughing & (pring) to support 3
Jan 4, 2011 · Penalty $800
Resolve - Class - 1
Failure to comply w/the commissioner's order to obtain a permit.per vecb#34808735y,issued 12/16/2009for work w/o permit @ cellar installed roughing & piping to support 3 gas dryers & 3 washing machines.rem:comp
Jun 26, 2010 · Penalty $2,400
Resolve - Class - 2
Failure to provide "c" hook notification. noted: there are 2 suspendedscaffolds from "c" hook and dob records show no notification to bldg dept prior to install "c" hook in connection w/suspended scaffold has
Mar 3, 2010 · Penalty $400
Resolve - Class - 1
Work w/o a permit three coin operated gas dryers and three coin operated cloths washing machines installed in bsmt of bldg w/o a permit washer drains missing traps allowing sewer gas to collect in laundry room
Dec 16, 2009 · Penalty $1,600
Resolve - Class - 1
License rigger fail to insure scaffold workers meet minimum requirements. at time of inspection observed active work at rear of premises on re-pointing of existing brick facade & use of 2 point suspended scaffo
Nov 16, 2009 · Penalty $1,600
Resolve - Class - 1
B154 34a.51.50a.50.3b.50b.50c.50d.50e.50f.50a flue not sealed to chimney 50b clean out door missing 50c chimney base need to be cleaned out 50d back flow preventor remove 50e remove rubber hose from boiler feed
Apr 20, 2009 · Penalty $250
Resolve - Class - 3
Failure to maintain.witnessed breeching of boiler not properly sealed no supports hot water flue missing supports.hot & cold water lines hasno hangers.back flow preventor missing on boiler.boiler not properly
Jan 30, 2009 · Penalty $500
Resolve - Non-hazardous
Failure to maintain exterior building wall.defect is:loose cracked and missing mortar joints on brick facade at 3rd story to parapet roof area.remedy:make all necessary repairs.
Apr 6, 2001 · Penalty $180
Resolve - Hazardous
Failure to maintain exterior building wall.defect is:bricks are loose,cracked,eroded and mortar joints missing.also holes in brick facade due to missing bricks over entrance at front of building from 3rd story
Apr 6, 2001 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior building wall defect is: brick parapet wall at west side of roof is leaning inward out of plumb approx 2" - approx 10'long. remedy: repair defect
Aug 5, 1998 · Penalty $180
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect is: eroded mortar joints at north parapet and third story wall at various location. broken & defective window sill at north 3rd story window. remedy: make all
May 12, 1998
Resolve - Non-hazardous
Failure to maintain brick facade spalding various locations all sides exterior bldg walls from grade to roof parapet walls remedy make all necessary repairs where required in lawful manner & to satisfaction
Mar 30, 1994
Resolve