roofy

Violations at 1662 Cropsey Avenue

Brooklyn, NY 11214 · BBL 3-06461-0036 · Back to the property

HPD housing violations

The newest 50 of 158 HPD violations. The city keeps the complete history.

  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4 inches at 2nd stack from south at west building front at fire escape, 2nd story

    Mar 25, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 11d, 4th story, 1st apartment from east at south

    Mar 25, 2026 · Apt 11D

    Open — Nov sent out
  • BHazardous

    Properly secure the loose handrail at north at public hall stairs, 2nd story, section ''a''

    Sep 3, 2025

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt b12, 4th story, 2nd apartment from west at north , section ''b''

    Sep 3, 2025 · Apt B12

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt a12, 4th story, 1st apartment from north at east , section ''a''

    Sep 3, 2025 · Apt A12

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak above ceiling in the kitchen located at apt a12, 4th story, 1st apartment from north at east , section ''a''

    Sep 3, 2025 · Apt A12

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the 2nd room from east at south located at apt a12, 4th story, 1st apartment from north at east , section ''a''

    Sep 3, 2025 · Apt A12

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak above ceiling in the 2nd room from east at south located at apt a12, 4th story, 1st apartment from north at east , section ''a''

    Sep 3, 2025 · Apt A12

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling andd all walls at bulkhead section (a) at public hall

    Aug 12, 2025

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant ceiling andd all walls at bulkhead section (a) at public hall

    Aug 12, 2025

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt d7, 3rd story, 1st apartment from west at north

    Aug 12, 2025 · Apt D7

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east, south and west walls in the private hallway located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the private hallway located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at all walls in the 1st room from east at south located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north, east and south walls in the 1st room from east at north located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at north located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • CImmediately hazardous

    M/d law abate the nuisance consisting of key operated lock at door of room leading to fire escape in the 1st room from east at north located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from east at north located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Properly repair or replace the broken or defective shower body at bathtub in the bathroom located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from east at south located at apt b12, 4th story, 2nd apartment from west at north

    Feb 24, 2025 · Apt B12

    Open — Not complied with
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at boiler room

    Nov 1, 2024

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt c7, 3rd story, 1st apartment from east at south

    Nov 1, 2024 · Apt C7

    Open — First no access to re- inspect violation
  • CImmediately hazardous

    Provide a safe and adequate supply of electric service to the fixtures all outlets and fixtures in the entire apartment located at apt c7, 3rd story, 1st apartment from east at south

    Nov 1, 2024 · Apt C7

    Open — First no access to re- inspect violation
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt c7, 3rd story, 1st apartment from north at east , section ''eastsouth''

    Oct 18, 2024 · Apt C7

    Open — First no access to re- inspect violation
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt c7, 3rd story, 1st apartment from north at east , section ''eastsouth''

    Oct 18, 2024 · Apt C7

    Open — First no access to re- inspect violation
  • CImmediately hazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls. in the entire apartment located at apt c7, 3rd story, 1st apartment from north at east , section ''eastsouth''

    Oct 18, 2024 · Apt C7

    Open — First no access to re- inspect violation
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony at 1st fire escape from north at east, 2nd story

    Oct 10, 2024

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the foyer located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from east at south located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Open — Not complied with
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from east at north located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Open — Not complied with
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt b12, 4th story, 2nd apartment from west at north , section ''b'', at northwest

    Sep 15, 2024 · Apt B12

    Open — Not complied with
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at door to court yard at boiler room

    Oct 10, 2023

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at boiler room at boiler room

    Oct 10, 2023

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at bulkhead door at public hall, 4th story, section ''''d''''

    Oct 10, 2023

    Closed — Violation dismissed
  • BHazardous

    M/d law abate the nuisance consisting of consisting of overgrown vegetation at fire escape drop ladder at yard at east

    Oct 10, 2023

    Closed — Violation dismissed
  • BHazardous

    M/d law abate the nuisance consisting of non-ground fault circuit interrupter (gfci) outlet at west wall within 6 ft. of sink in the kitchen located at apt d7, 3rd story, 1st apartment from south at west

    Oct 10, 2023 · Apt D7

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective ,, in the entrance located at apt d7, 3rd story, 1st apartment from south at west

    Oct 10, 2023 · Apt D7

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove device preventing door from being self-closing kickstand stopper installed at building entrance door at public hall, 1st story

    Nov 3, 2022

    Closed — Violation closed
  • BHazardous

    Remove all encumbrances consisting of construction and household items at public hall, 4th story

    Nov 3, 2022

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak over the ceiling in the 1st room from north at west located at apt b12, 4th story, 2nd apartment from south at west , section at southwest

    Nov 3, 2022 · Apt B12

    Open — Not complied with

DOB building violations

5 DOB violations, newest first.

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 4, 2018

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 2, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Construction other optional

    Hout a permit; remedy; stop all work/make safe provide guard rails and toeboards on scaffolding-obtain permits and approved plans

    Jun 17, 2009

    Vw*-violation - work w/o permit dismissed

ECB violations

12 ECB violations, newest first.

  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio #35295071x issued on 01/10/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.rem:comply w/comm's order &/or file a cert of corre

    Jun 12, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summon/vio#35295071xissued on 1-10-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway at rear of bldg at

    Apr 10, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35295071x issued on 01/10/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to provide unobs

    Feb 16, 2018 · Penalty $2,000

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway.at rear of premises @ exposure 3 fire escape is blocked with debris paint cans & shopping cart and flower pots. remedy: remove obstruction

    Jan 10, 2018 · Penalty $3,000

    Resolve
  • Class - 2

    Fail to comply w/the comm order to file a cofc for ecb vio#34791439m issued on 06/17/2009 for failure to provide sdwlk shed where required @ interior courtyard installing stucco over brick w/o protection for fo

    Nov 4, 2009 · Penalty $4,000

    Active
  • Class - 1

    Failure to provide a sidewalk shed where required. at time of inspection observed active work in progress on buildings facade,installing new stucco over brick at interior(court) where main entrances to premises

    Jun 17, 2009 · Penalty $1,600

    Active
  • Non-hazardous

    Failure to maintain exterior building wall: defect is cracked, broken, misplaced and spallding cement stucco at section a,b,c,d inner court yard. remedy: maintain exterior building wall obtain permit's for

    Apr 6, 2004 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection.work at site. no approved plans provided a.t.i. remedy:provide and maintain approved plans at site during entire construction process.

    Apr 6, 2000 · Penalty $250

    Resolve
  • Hazardous

    Failure to provide protection at side of excavation in cellar of premises approx 15'x20' and 3' deep approx 2' below footing with no under. stop all work. remedy: provide protection obtain any and all permits a

    Apr 6, 2000 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to maintain exterior bldg. wall. defect is approx. 30' section of parapet wall is leaning inward at 17th ave. side of premises. cracks on inner court yard wall. where wall meets with ground (grade) sout

    Apr 6, 2000 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain hazardous defect are:missing fire rating in cellar ceiling, various areas.cracked, dry rotted wood joist so. side cellar.structrual cracks on so. side walls in "b" line apt.s 1-4-7 &10 also

    Apr 6, 2000 · Penalty $800

    Resolve
  • Hazardous

    Work without a pemrit . work noted ; excavation in cellar south side approx 3' deept 15'x20' area metal col;umn extended .excavation is approx 2' below footy stop all work ! remedy: make site safe obtain any an

    Apr 6, 2000 · Penalty $800

    Resolve