Violations at 1835 83 Street
Brooklyn, NY 11214 · BBL 3-06315-0054 · Back to the property
HPD housing violations
The newest 50 of 68 HPD violations. The city keeps the complete history.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at ceramic wall tiles at east in the bathroom located at apt 6c, 3rd story, 1st apartment from east at south
Apr 5, 2023 · Apt 6C
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures, (160f found) in the entire apartment located at apt 6c, 3rd story, 1st apartment from east at south
Apr 5, 2023 · Apt 6C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6c, 3rd story, 1st apartment from east at south
Apr 5, 2023 · Apt 6C
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door at public hall, 1st story
Oct 6, 2022
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt a4, 1st story, 1st apartment from north at east
Jun 15, 2022 · Apt A4
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Apr 20, 2022
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Apr 20, 2022
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape window in the 1st room from north at west located at apt d4, 4th story, 1st apartment from west at north
May 27, 2021 · Apt D4
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt d4, 4th story, 1st apartment from west at north
Apr 21, 2021 · Apt D4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt d4, 4th story, 1st apartment from west at north
Feb 24, 2021 · Apt D4
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the 2nd room from east at south located at apt d4, 4th story, 1st apartment from west at north
Feb 24, 2021 · Apt D4
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt d4, 4th story, 1st apartment from west at north
Feb 24, 2021 · Apt D4
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt d4, 4th story, 1st apartment from west at north
Feb 24, 2021 · Apt D4
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt d4, 4th story, 1st apartment from west at north
Feb 24, 2021 · Apt D4
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the private hallway , the bathroom , the kitchen , the 1st room from east at south located at apt b4, 2nd story, 1st apartment from south at west
Jan 20, 2021 · Apt B4
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the foyer located at apt b4, 2nd story, 1st apartment from south at west
Jan 20, 2021 · Apt B4
Open — First no access to re- inspect violation - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt a5, 1st story, 2nd apartment from south at west
Jan 20, 2021 · Apt A5
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt b4, 2nd story, 1st apartment from south at west
Jan 20, 2021 · Apt B4
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, west wall, 1st closet from west at north wall door in the foyer located at apt b4, 2nd story, 1st apartment from south at west
Jan 20, 2021 · Apt B4
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt d1, 4th story, 2nd apartment from west at north
Jan 20, 2021 · Apt D1
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt c3, 3rd story, 2nd apartment from south at west
Jan 20, 2021 · Apt C3
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment .. in the entire apartment located at apt c1, 3rd story, 2nd apartment from west at north
Jan 20, 2021 · Apt C1
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Jan 8, 2021
Closed — Violation closed - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Nov 24, 2020
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ,,,, in the entire apartment located at apt b4, 2nd story, 1st apartment from south at west
Nov 24, 2020 · Apt B4
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ,,, in the entire apartment located at apt a1, 1st story, 2nd apartment from north at east
Nov 24, 2020 · Apt A1
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Sep 17, 2020 · Apt D2
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlets at east wall in the bathroom located at apt 3b, 2nd story, 2nd apartment from south at west
Aug 21, 2020 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt d6, 4th story, 1st apartment from north at east
Nov 8, 2018 · Apt D6
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st closet from west at north wall wall in the private hallway located at apt d6, 4th story, 1st apartment from north at east
Nov 8, 2018 · Apt D6
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at north closet in the private hallway located at apt d6, 4th story, 1st apartment from north at east
Nov 8, 2018 · Apt D6
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 1; wg to repair = 1; in the entire apartment located at apt d6, 4th story, 1st apartment from north at east
Nov 8, 2018 · Apt D6
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; located at apt d2, 4th story, 1st apartment from north at east
Jan 14, 2017 · Apt D2
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 6, 2015
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Mar 18, 2015
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1d, 4th story, 2nd apartment from west at north
Aug 23, 2012 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 1d, 4th story, 2nd apartment from west at north
Aug 23, 2012 · Apt 1D
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 1d, 4th story, 2nd apartment from north at east
Jun 22, 2012 · Apt 1D
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at east and south wall in the bathroom located at apt 1d, 4th story, 2nd apartment from east at south
Feb 27, 2008 · Apt 1D
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1d, 1st story, 2nd apartment from west at north
Mar 29, 2006 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north, south, east and west wall at closet in the foyer located at apt 1d, 1st story
Mar 29, 2006 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing, ( ms.sciannamea) at entire apartment, 4th story, apartment
Jun 29, 2002 · Apt 1D
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches at entire apartment, 4th story, apartment
Jun 29, 2002 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the kitchen located at apt 1d, 4th story, 2nd apartment from south at west
Jun 29, 2002 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 1st room from east located at apt 1d, 4th story, 2nd apartment from south at west
Jun 29, 2002 · Apt 1D
Closed — Violation closed - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway rear yard to rear fire passage & from center court to front fire passage.
Oct 19, 1990
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at washbasin 4 sty northeast rear wing apt d1 bathroom. located at apt d1
Oct 19, 1990 · Apt D1
Closed — Violation closed
DOB building violations
7 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations
No ECB violations on record