9718 Ft Hamilton Parkway
Brooklyn, NY 11209BBL 3-06127-7502Map
Owner of record: Bridgeview Condos
9718 Ft Hamilton Parkway is a condominium built in 2003 in Brooklyn, 11209. It has 64 residential units across 3 floors. The owner of record is Bridgeview Condos. HPD has recorded 28 housing violations here, most recently on June 28, 2023. 12 of the 28 most recent violations are still open.
- HPD violations
- 28
- DOB violations
- 28
- ECB violations
- 13
- HPD complaints
- 11
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 28
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 28, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 28, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 28, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 28, 2023
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Jun 28, 2023
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
May 24, 2023
Open — Nov sent out - ANon-hazardous
Refit hopper door inside compactor closet at public hall, 1st story
May 24, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hopper door inside compactor closet at public hall, 1st story
May 24, 2023
Open — Nov sent out - ANon-hazardous
Refit compactor closet door at public hall, 1st story
May 24, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at compactor closet at public hall, 1st story
May 24, 2023
Closed — Violation closed
DOB building violations · 28
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 11, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 11, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 11, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2016
Dob violation - resolved
ECB violations · 13
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $1,250
Active - Class - 2
Could not regain entry or locate an auth rep to effectuate service.
Apr 13, 2023 · Penalty $3,125
Active - Class - 2
Failure to comply w/commissioner's order contained in summons/v39022552z issued5/20/20 &to file c/c pursuant to28-201.1&1rcny102-01d2.acceptable cert has not yet been filed despite respondent entering into stip
Nov 1, 2021
Resolve - Class - 2
Unguarded cab lighting. misaligned cab mirror. replace worn door gibs where needed. provide keys and info for mr access
May 20, 2020 · Penalty $625
Active - Class - 2
Unguarded cab lighting. misaligned cab mirror. replace worn door gibs where needed. provide keys and info for mr access
May 20, 2020 · Penalty $625
Active - Class - 2
61r11 mainline opens when power in.
Nov 18, 2015
Resolve - Class - 2
Failure to maintain building in code-complaint manner. noted: at front of building,along side & adjacent to public sidewalk,a metal 2 1/2 ftheight. fence with vertical metal pointed spacers (spike like) 4" on
Sep 3, 2010 · Penalty $500
Active - Non-hazardous
60t07,86m05,84x10. (60t) provide co info. (86m) missing pressure tag (84x) restore car communications.
Jan 2, 2008
Resolve - Non-hazardous
60t07,86m05. (60t) provide company info. (86m) missing pressure test tag.
Jan 2, 2008
Resolve - Hazardous
Work w/out permit.upon inspection at above property noted:building was demolished prior to inspection nb 4 story building was erected and dob records shows no demo permit has been issued.remedy:obtain demo perm
Mar 1, 2005
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 27, 2024 · Apt 3C
Close - Appliance
Electric/gas range
Nov 27, 2024 · Apt 3C
Close - Safety
Fire escape
Jun 21, 2023 · Apt BUILDI
Close - General
Janitor/super
Mar 15, 2023 · Apt 3I
Close - Flooring/stairs
Stairs
Jun 28, 2016 · Apt 1D
Close - Flooring/stairs
Stairs
Jun 28, 2016 · Apt 1D
Close - Flooring/stairs
Stairs
Jun 28, 2016 · Apt 1D
Close - Flooring/stairs
Stairs
Jun 28, 2016 · Apt 1D
Close - Electric
Lighting
Oct 14, 2014 · Apt 1G
Close - Water leak
Heavy flow
Oct 14, 2014 · Apt 1G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R3)
- Year built
- 2003
- Floors
- 3
- Residential units
- 64
- Building area
- 69,594 ft²
- Lot area
- 116,686 ft²
- Zoning
- R5B
- Community board
- 310
- Council district
- 47
- Block / lot
- 6127 / 7502
- Assessed value
- $3,081,963
- Landmark / historic district
- No
HPD registration #380479, last renewed Sep 29, 2026.
Questions about 9718 Ft Hamilton Parkway
Who owns 9718 Ft Hamilton Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Bridgeview Condos.
Does 9718 Ft Hamilton Parkway have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 9718 Ft Hamilton Parkway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 9718 Ft Hamilton Parkway built?
City records list 2003 as the year it was built.
How many apartments are in 9718 Ft Hamilton Parkway?
It has 64 residential units and 130 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.