Violations at 8901 Shore Road
Brooklyn, NY 11209 · BBL 3-06058-0012 · Back to the property
HPD housing violations
19 HPD violations, newest first.
- CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed two floor mounted double hook door stopper at building entrance door
Aug 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed floor mounted hook door stopper at building vestibule door
Aug 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of key operated double cylinder lock installed at building entrance door
Aug 3, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window stool at all windows in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Jun 8, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jun 8, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulk around bathtub and wall tile in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jun 8, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 4 sq.ft. at east wall, under window in the 2nd room from east at south located at apt 1b, 1st story, 1st apartment from north at east
Jun 8, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2015 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 2nd room from north located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the east wall in the 2nd room from north located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall. in the 3rd room from north at east located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2015 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the window stools. in the 3rd room from north at east located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the east wall in the 3rd room from north at east located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2015 · Apt 1B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the east wall approx. 3sq.ft. in the 3rd room from north at east located at apt 1b, 1st story, 1st apartment from north at east
Jun 2, 2015 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , the ceiling, in the 1st room from east at south located at apt 10a, 10th story, apartment at north
Aug 13, 2007 · Apt 10A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling, in the 1st room from east at south located at apt 10a, 10th story, apartment at north
Aug 13, 2007 · Apt 10A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , the ceiling, in the 1st room from east at north located at apt 10a, 10th story, apartment at north
Aug 13, 2007 · Apt 10A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling, in the 1st room from east at north located at apt 10a, 10th story, apartment at north
Aug 13, 2007 · Apt 10A
Open — Nov sent out
DOB building violations
30 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Feb 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 6, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2016
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Apr 15, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2015
Dob violation - resolved - Construction other optional
Due to a motor vehicle crashed into the building side walk shed installed
Aug 7, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 3, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 20, 2015
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 2003
Dob violation - resolved - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Jun 16, 2000
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 1992
Vp*-violation unserved ecb- dismissed
ECB violations
31 ECB violations, newest first.
- Class - 2
Failure to maintain parking structure in safe condition. as noted at time of inspection on an occupied parking structure consisting of cellar level, observed cracked/spalling concrete at beams and slabs ans exp
Jul 9, 2025 · Penalty $1,280
Active - Class - 2
Failed to notify department prior to installation or removal of suspended scaffold. atoi observed suspended scaffold hung and in use. permit holder failed to notify dob before install of scaffold under job #b00
Nov 1, 2024
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $1,250
Active - Class - 1
At the time of my inspection of a 10 story building, i observed workers on scaffolding for facade work and elevator were used by workers to get to the roof. upon request for tenant protection plan only the noti
Sep 25, 2024 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection of a 10 story building, i observed 2 workers using suspended scaffold. upon review of there 16hrs users cards one of them card was expired from 06-14-2024. failure to ensure each wo
Sep 25, 2024 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 10 story building, i observed ropes and cable tied from the sidewalk shed to on top of the building to the tiebacks. upon review of the approved drawing they were not reflectin
Sep 25, 2024 · Penalty $2,500
Resolve - Class - 1
. on 4/29/2024 worker was injured due to a fall from a sidewalk shed. worker was injured and taken to hospital. permit holder failed to submit report within 3 business days of required 16 items to code 28-103.2
May 22, 2024 · Penalty $5,000
Resolve - Class - 2
Inadequate work or storage zone. observed work/storage zone adjacent to sidewalk shed not as per code. missing 4ft solid barriers on the side of sidewalk shed. barrier extending at least 4ft in height shall be
Apr 29, 2024
Resolve - Class - 1
Observed excessive storage of heavy materials and equipment on top of a sidewalk shed. upon review of approved drawings for sidewalk shed, observed no indication permitting storage on top of sidewalk shed. appr
Apr 29, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to institute safety measure during construction operation. worker was injured due to fall from sidewalk shed. no safety measures were provided for worker performing tasks on top of sidewalk shed. no gua
Apr 29, 2024
Resolve - Class - 2
Failure to comply dob permit sign off. note: respondant obtained job#320787225 exp 05/06/2014, job#320392124 exp 03/012012, job #310024746 exp04/01/2010, job #320836752 exp 12/06/14, all permits mentioned was n
Dec 29, 2021 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building walls and appurtenances.as notedat time of inspection a observed on exposures 1,2,3 & 4 spalling bricks & crack bricks.exposure# 1 corroded balcony support beams,spalling b
Jan 21, 2021 · Penalty $1,250
Active - Class - 2
Unreadable main line fuses. provide in case of fire signage where needed. replace worn hoistway door gibs where needed. self resetting escape hatch switches prohibited
May 29, 2020
Resolve - Class - 2
Remove voltage tap from rear electrical panel in mr. provide in case of fire light in mr. unguarded mr lighting. seal hoist machine leaks. provide tool with 12 point 15/16 socket for safety. worn thrust bearing
Jul 31, 2019 · Penalty $625
Resolve - Class - 2
Adjust fire service key switch. provide in case of fire sign in lobby. seal hoist machine leaks
Jul 31, 2019 · Penalty $625
Resolve - Class - 1
Class 1 item: misalignd zone lock restrictor. even though car door cannot be manually opened, zone lock must still be operational. class 2 items:adjust braille tags to ada code height. provide missing braille
Feb 27, 2019 · Penalty $1,250
Active - Class - 2
Replace worn hoistway door gibs where needed. shorten gov rope. adjust in car stop switch for easy operation. adjust braille tags to ada code where needed. provide in case of fire signage where needed. unreadab
Feb 27, 2019 · Penalty $625
Resolve - Class - 1
Cease use 05a10(c/u),57b07,52m07. 05-1-10 cease use item,door zone restrictor has been renderd inoperative this is a safety device to ensure passernger safety:remedy:repair restrictor and contact nyc bod at eir
Nov 14, 2018 · Penalty $1,250
Active - Class - 2
Failure to provide information panel. note: @ time of insp observed sidewalk shed in place w/out information panel on parapet. rem: comply w/ code.
May 18, 2017 · Penalty $400
Active - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repair
May 29, 2015 · Penalty $800
Active - Class - 1
Failure to take required actions to secure public safety-unsafe facadenoted: on 2/20/15 a qew1 submitted a fisp3:notification of unsafe conditions designating the facade as "unsafe" and no safety measures were
Mar 13, 2015 · Penalty $2,400
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Oct 21, 2014 · Penalty $800
Resolve - Class - 3
B354,32a,50a,50b,50c. 50a peep hole glass dirty. 50b (king) valve overboiler leaking. 50c holes in boiler room walls.
Oct 18, 2008
Resolve - Hazardous
27-1021 sidewalk shed doesnt meet bldg code specifications no light fixtures install @ all rem: conform to bldg code specification
Jun 28, 2008 · Penalty $2,000
Resolve - Non-hazardous
27-127 b4a, 50a, 50b, (50a) sealed boiler room ceiling to walls & sealed around all sewer lines in boiler room (50b) holes in boiler room ceiling
Jun 3, 2008
Resolve - Non-hazardous
Portable water piping cross connected to non-portable water piping - hazardous. part of sprinkler system (from shore rd side of bldg) for outside sprinkler of grass does not have protective devices from
Mar 4, 2008 · Penalty $2,500
Active - Hazardous
B4b/34a/50a/50b/50c/50d/50e/50f/50a-return pump leaking/50b-mud leg corroded & leaking/50e-holes in boiler room walls & ceiling/50f-safety or relief valve defective
Oct 13, 2006 · Penalty $800
Active - Hazardous
Failure to maintain building exterior wall defects are:brick exterior wall is cracked and bulging at various locations.remedy:do all repairs immediately obtain all necessary permits,take safety measure req'd to
Oct 5, 2000 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit: work noted:having installed a sidewalk shed around the building permiter.remedy:obtain a permit if feasible.
Oct 5, 2000 · Penalty $2,500
Resolve - Hazardous
Failure to file an amended round 5 report acceptable to this department pursuant rule r.c.n.y. 32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an amended
Sep 18, 2000 · Penalty $2,500
Resolve - Hazardous
Failure to file an amended round five report acceptable to this dept. pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous condtions described in initial ll10/80 report.remedy:file an amended
Jul 14, 2000 · Penalty $2,500
Resolve