8601 Ridge Boulevard
Brooklyn, NY 11209BBL 3-06043-0001Map
Owner of record: NYC Department Of Education
8601 Ridge Boulevard is a school building built in 1921 in Brooklyn, 11209. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 23
- ECB violations
- 66
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 23
- Construction other optional
Work without a permit remedy:make site safe,stop all work,obtain a variance permit or work only during designated hours,call dob prior to returning to job site
Jul 21, 2007
Vw*-violation - work w/o permit dismissed - Construction other optional
Failure to maintain building.work in progress under app#3020112104-01 al expires 01/0/07.to convert part of 2nd fl apts.noted:at 12 bay st 1st fl front/rear section of ceiling has fallen/missing exposing joist and causing ceiling to leak remedy:maintain bldg,and make all necessary repairs forthwith
Nov 2, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
May 5, 1999
Dob violation - active
ECB violations · 66
- Class - 2
Failure to maintain building in code-compliant manner.noted:there is excessive storage in basement/electric meter room.most storage is combustable materials.no storage permitted in electric meter room.rem:remov
Jun 5, 2025 · Penalty $1,250
Resolve - Class - 2
Exit door not self closing. noted: on the third fl next to room 308, the exit door that leads to the roof play area is not closing properly.remedy:replace/repair door
Apr 25, 2023 · Penalty $625
Resolve - Class - 2
Re-issue #35658048h failure to maintain building in code compliant manner.noted:observed at cellar level in the gas meter room and various locations the foundation walls are showing signs of water penetration.
Apr 25, 2023 · Penalty $1,562
Resolve - Class - 2
Re-issue #35663200j failure to maintain building in code compliant manner.noted:observed at roof level, at various locations,there is lots of bubbling throughout remedy:repair and replace
Apr 25, 2023 · Penalty $1,562
Resolve - Class - 2
Reissue #35587084j failure to maintain building in code compliant manner.at time of inspection observed at roof level rorine paper in state of disrepair & deteriorating work/cracked bubbling throughout in vario
Aug 9, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue #35587085l failure to maintain building in code compliant manner at time of inspection observed at roof level bulkhead stair c & d water penetration cause damage to wall & ceiling with spalling plater &
Aug 9, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue #35587086n failure to maintain building in code compliant manner at time of inspection observed at gas meter room foundation wall deteriorating become porous allowing water penetration damage to wall wi
Aug 9, 2022 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at basement gas meter room foundation wall deteriorating and has become pourous allowing water penetration damage to walls with spalling plaster/pamt/
Aug 13, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at roof bulkhead stair c&d water penetration damage to walls/ceilings with spalling plaster/paint.remedy:repair and/or replace.
Aug 13, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at roof level rofing paper in state of disrepair/deteriorating work/cracked and bubbling throughout in various locations.remedy:repair and/or replace.
Aug 13, 2021 · Penalty $625
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1921
- Floors
- 5
- Residential units
- —
- Building area
- 105,120 ft²
- Lot area
- 40,000 ft²
- Zoning
- R3-2
- Community board
- 310
- Council district
- 47
- Block / lot
- 6043 / 1
- Assessed value
- $8,917,650
- Landmark / historic district
- No
Questions about 8601 Ridge Boulevard
Who owns 8601 Ridge Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 8601 Ridge Boulevard have violations?
NYC HPD has no housing violations on record for this property.
Is 8601 Ridge Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 8601 Ridge Boulevard built?
City records list 1921 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.