7 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 18, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 11, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 20, 2016

    Dob violation - dismissed
  • Construction other optional

    Lot underwent unpermitted demo work.during demo work party wall shared w/adjacent prop was not prop braced to existing joist belonging to 314 83st.solid masonry rear wall left free standing&not prop braced above 1stfl.remedy:owner to immed engage pe nys eng'r&cont'r to demo rear wall above 1stfl&brace party wall.work to start no later 10/21/16

    Oct 20, 2016

    Dob violation - dismissed

ECB violations

33 ECB violations, newest first.

  • Class - 1

    Summons issued for building occupied without a valid certificate of occupancy. observed 4 story md with 6 occupied dwellings without a valid certificate of occupancy a6t time of inspection, obtain a valid certi

    Feb 18, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    I observed scaffold installed so that stucco could be applied to the exterior surface of exp2 wall with 1" styrofoam, this application is limited to 40ft measured vertically without a dob issued permit, 1 rcny

    May 1, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    No records of pre-shift meetings.at time of inspection on an active site with workers performing various tasks.i asked construction super tadeusz zych to provide department with record of pre shift meetings for

    Nov 4, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Permit holder failed to ensure workers recieve site safety orientationat time of my inspection of an active work site with various workers performing various tasks i asked construction super tadeusz zych to pro

    Nov 4, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Bc33012-failure to institute safety measures.at time of my inspection of an active work sidte @ 4th floor level with workers present performing various tasks the following deficient safety measures were observe

    Nov 4, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc33074-work and storage zone.at time of my inspection of an active work site @ 4th floor structural steel level observed large piece of machinery-lull forklift at exposure#1 street level adjacent to sidewalk s

    Nov 4, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc330910-failure to protect adjoining properties/no roof protection.attime of my inspection of an actie site doing structural steel and concrete work/cmy work currently @ the fourth floor observed adjecently pr

    Nov 4, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to safeguard/no overhead protection.at time of inspection of an active site with concrete and structural steel operations at approx 40 foot in height on the as floor observed no overhead protection in p

    Nov 4, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents &/or approvedamendments-structural drawing. at time of inspection at an active jobsite nb proposed 4 sty residential bldg,it was observed that work being

    Sep 9, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    Bc 30901.1 fialure to protect adjacent property @time of inspection in response to compliant #3714018 observed missing inqdequate protectioon @exp#2 for the left adjoining building. the balcony @2nd sty lvl

    Aug 1, 2019

    Resolve
  • Class - 1

    Sec. 3309.10 failure to provide roof protection. at the time of inspection of a new bldg under construction i observed no roof protection atexp#4. there are steel columns erected approx 15ft high above the neig

    Jul 3, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide overhead protection. at the time of inspection of a4 sty new bldg under construction i observed steel columns approx 15fthigh & steel beams erected at exp#4 w/no overhead protection for rear

    Jul 3, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    3303.4..7 . storage of material adjacent to sidewalk.note:at time of inspection i observed machinery outside the job site not protected with40 docks or solid fence.this is a unsafe and hazardous condition publi

    Jun 6, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3307.7.2.gates.note:at time of my inspection i observed constructionfence in place.upon my inspection i observed the fence was swinging tothe public sidewalk this can cause a unsafe and hazardous condition fo

    Jun 6, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note:at time of inspection i observed sidewwalk shed in place.(1)failure to maintainupright post on mudsills.(20 upright posts not level and (plank) this

    Jun 6, 2019 · Penalty $2,400

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and or approved amendments note:at time of inspection i observed sidewalk shed in place upon my inspection i observed the plans for sidewalk shed and did

    Jun 6, 2019 · Penalty $625

    Resolve
  • Class - 1

    Construction super failed to provide & perform duties. at time of inspection on a active jobsite,where steel was erected up to 2 floor,no designated competent on site,no daily log book. inadequate plans on site

    Feb 13, 2019 · Penalty $10,000

    Resolve
  • Class - 1

    Sec. 3301.7 documents to be kept on site(design drawings)at time of inspection on a active jobsite,where steel was erected up to 2 floor. it was observed that at exp#2 chimney was destroyed,cropped.left w/brick

    Feb 13, 2019

    Resolve
  • Class - 1

    Sec. 3301.2 failure to provide & maintain adequate egress. at time of inspection on a active jobsite,it was observed only 1 means of egress at exp#1,blocked by concrete equipment. no other means of egress since

    Feb 13, 2019

    Resolve
  • Class - 1

    Sec. 3301.7 documents to be kept on site.(monitoring)at time of inspection on a active jobsite,where steel was erected up to 2 floor,upon request for monitoring reports,reports provided were not provided for

    Feb 13, 2019

    Resolve
  • Class - 1

    Failure to maintain housekeeping. at time of inspection on a active jobsite. it was observed that jobsite had snow & ice,at rear exp#3,bldg materials,debris 7 ice blocking & compremising egress. creating a trip

    Feb 13, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain construction jobsite fence at time of inspection on a active jobsite. it was observed that no fence was installed at exp#3 rear & 4 rear to protect adjacent properties. stop all work at exp#

    Feb 13, 2019

    Resolve
  • Class - 1

    Sec. 3305.2.5 steel fabrication/installation assembly. at time of inspection on a active jobsite,it was observed structural steel,installed up to 2 floor,steel installed was porched,(out)modified. upon request

    Feb 13, 2019

    Resolve
  • Class - 1

    Work does not conform to approved plans at time of inspection on a active jobsite. it was observed structural steel installed up to 2 floor,upon reviewing approved plans. it was observed that h-beams were missi

    Feb 13, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to designate competent person. at time of inspection on a active jobsite,upon request to see/speak w/competent person no one was available or present,no construction super log book,upon being an hour on

    Feb 13, 2019

    Resolve
  • Class - 1

    Construction super daily log book. at time of inspection on a active jobsite,upon request to see construction super tadeuse zych #22186 designated on pw2 none was available,after 1 hour a person approached w/a

    Feb 13, 2019

    Resolve
  • Class - 1

    Sec. 3313.1 no permit(fdny)for acetylene torch observed,hot works in progress,upon request for fdny permit for acetylene/oxygen tanks none were given. stop all use of acetylene/oxygen torch & storage of tanks.

    Sep 19, 2018

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. at the time of inspection it was observed that the construction fence at exp#2 fel down on to the adjacent property structure.

    Mar 3, 2018 · Penalty $10,000

    Resolve
  • Class - 1

    Bc3307.3.2 failure to provide required lotline construction fence.@ time of inspection it was observed that the contractors did not have a construction fence @ exp 2,3, & 4 to protect the public from entering t

    Jul 17, 2017 · Penalty $4,000

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection.@ time of inspection it was observed that the contractors did not installviewing panels as per code.rem comply w/ code

    Jul 17, 2017 · Penalty $800

    Resolve
  • Class - 1

    Failure to notify dob within 24-48 hours of the start of excavation.atthe time of inspection observed that excavation.at the time inspectionobserved that excavation work has started ahead of the required start

    Mar 11, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    1704.1.1 failure to file special inspection statement of responsibility prior to permit issuance &prior to start of work.@the time of inspection demolition and foundation work was ongoing.the tr1's on file were

    Oct 19, 2016 · Penalty $1,630

    Resolve
  • Class - 2

    Failure to provide approed plans at site at time of inspection.excavation being done under permitted application #321260069. observed apprx six (6) male workers at site doing various excavation tasks at time of

    Sep 27, 2016 · Penalty $500

    Resolve