roofy

Violations at 8301 3 Avenue

Brooklyn, NY 11209 · BBL 3-06017-0010 · Back to the property

HPD housing violations

19 HPD violations, newest first.

  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system

    May 25, 2026

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    May 25, 2026

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 25, 2026

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    May 25, 2026

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    May 25, 2026

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 25, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures no volume in the entire apartment located at apt 6, 4th story, 1st apartment from south at west

    May 25, 2026 · Apt 6

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 6, 4th story, 1st apartment from south at west

    May 25, 2026 · Apt 6

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 12, 2018

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2017

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector missing located at apt 5, 4th story, 1st apartment from south at west

    Apr 4, 2014 · Apt 5

    Closed — Violation dismissed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5, 4th story, 1st apartment from south at west

    Apr 4, 2014 · Apt 5

    Closed — Violation dismissed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)

    Apr 1, 2014

    Closed — Violation closed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 4; repair: install stops and use correct screws in the entire apartment located at apt 5, 4th story, apartment at west

    Feb 13, 2014 · Apt 5

    Closed — Violation closed
  • ANon-hazardous

    Properly repair the broken or defective latch on window at fire escape in the 1st room from east at north located at apt 5, 4th story, apartment at west

    Feb 13, 2014 · Apt 5

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace with new the broken or defective glass in lower sashes on both windows in the 1st room from east at north located at apt 5, 4th story, apartment at west

    Feb 13, 2014 · Apt 5

    Closed — Violation closed
  • ANon-hazardous

    Refit lower sash at 1st window from east in the 1st room from east at north located at apt 5, 4th story, apartment at west

    Feb 13, 2014 · Apt 5

    Closed — Violation dismissed

DOB building violations

13 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 25, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 17, 1997

    Dob violation - active
  • Plumbing none

    Plumbing work without a permit. plumbing work had occured at the following location. rear store side of building rough plumbing wall basin, bathroom bowl & basin, new hot & cold water lines, basement new waste line & hot & cold water lines remedy: obtain a permit if feasible or restore to prior legal conditio

    Sep 30, 1997

    Vw-violation work without permit - active
  • Construction other optional

    Work without a permit. work noted: having removed a section of partit partition at rear of store & creating a doorway (new) into room at rear of store remedy: obtain a permit if feasible or restore to prior legal condition

    Sep 29, 1997

    Vw-violation work without permit - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations

7 ECB violations, newest first.

  • Class - 1

    Failure to maintain building in a code compliant manner. observed a fire escape drop ladder being obstructed by garbage bins placed underneath drop ladder creating a hazardous condition to all occupants trying

    May 8, 2025 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35542922k issued on 12/2/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bui

    Apr 9, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner:at the time of my inspection and observed at expo#1 on 83rd street a 4 story mixed usebuilding facade inadequate repairs still show signs of cracks in verti

    Dec 2, 2020 · Penalty $6,250

    Resolve
  • Class - 1

    At exp 1 front of building on 83rd street. large crack has opened up again by the dental office looks like it was previously patched but not properly done, also other cracks on exp 1 that need to be fixed. pict

    Aug 31, 2020 · Penalty $3,125

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the certificate of occupancy #20958. store at first floor converted to a tatoo parlor. remedy: discontinue illegal use.

    Jan 2, 1998

    Resolve
  • Hazardous

    Plumbing work without a permit. plumbing work had occurred at the following location, rear store side of building rough plumbing wall basin,bathroom boul& basin new hot & cold water lines basement new waste lin

    Sep 30, 1997 · Penalty $175

    Resolve
  • Non-hazardous

    Work without a permit. having removed a section of partiton at rear of store and creating a doorway into room at rear of store

    Sep 29, 1997 · Penalty $350

    Resolve