roofy

Violations at 8305 3 Avenue

Brooklyn, NY 11209 · BBL 3-06017-0008 · Back to the property

HPD housing violations

23 HPD violations, newest first.

  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ,100 watts required.

    May 8, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective bottom rail lower sash north window rear rooms 2nd story apartment

    Nov 19, 2003

    Open — Nov sent out
  • BHazardous

    Properly secure the loose hand rail, 2nd story public hall.

    Nov 19, 2003

    Open — Nov sent out
  • BHazardous

    Remove all obstructions and repair all defects in kitchen sink & bathtub, 2nd story apt. #1.

    Nov 19, 2003

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective make operable upper & lower sashes throughout 2nd story apt. #1.

    Nov 19, 2003

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings & walls throughout apt, 2nd story apt. #1

    Nov 19, 2003

    Open — Nov sent out
  • CImmediately hazardous

    Remove all obstructions and repair all defects in bathtub drain bathroom, 2nd story apt. 2. er1

    Nov 19, 2003

    Open — Nov sent out
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom, 3rd story apt. 2.

    Nov 19, 2003

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls center room, 3rd story apt. 2.

    Nov 19, 2003

    Open — Nov sent out
  • CImmediately hazardous

    Remove all obstructions and repair all defects in bathtub and washbasin 3rd story apt. #2

    Nov 19, 2003

    Open — Nov sent out
  • CImmediately hazardous

    Remove all obstructions and repair all defects in wasbasin & bathtub 3rd story apt. 2 bathroom

    Nov 19, 2003

    Open — Nov sent out
  • CImmediately hazardous

    Remove all obstructions from water closet 3rd story apt. 2 bathroom

    Nov 19, 2003

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceilings all rooms throughout 2nd story apartment

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches throughout 2nd story apartment

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective on/off handle hot water kitchen sink 2nd story apartment

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling all room throughout 2nd story apartment

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of no electrcity all fixtures all rooms throughout 2nd story apartment

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Provide an adequate supply of gas to the fixtures gas stove kitchen 2nd story apartment

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective cement and ceramic floor tile, bathroom 3rd story 2.

    Jul 11, 2003

    Open — Nov sent out
  • ANon-hazardous

    Properly repair the broken or defective bell system, 3rd story apt 2.

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective wood door jam & frame entrance 3rd story apartment

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of baby furniture playpen household items 3rd story public hall

    Jul 11, 2003

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of of exposed electrical wires ceiling east room 2nd story apt 2.

    Jul 11, 2003

    Open — Nov sent out

DOB building violations

4 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations

2 ECB violations, newest first.

  • Non-hazardous

    Work without a permit. work noted: having constructed a rear extension approx. 20ftx25ftx10ft high. frame extension with roofing materials for siding fans/ tables and chairs noted in rear extension, roof pitche

    Oct 14, 1999 · Penalty $500

    Resolve
  • Non-hazardous

    Work without a permit a brick oven has been lonstructed/installed in rear of premises (1st flr). without a valid permit. remedy: obtain a permit from this dept. if feasible, or restore premises to prior legal

    Mar 6, 1992

    Resolve