Violations at 8305 3 Avenue
Brooklyn, NY 11209 · BBL 3-06017-0008 · Back to the property
HPD housing violations
23 HPD violations, newest first.
- BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ,100 watts required.
May 8, 2005
Open — Nov sent out - BHazardous
Properly repair the broken or defective bottom rail lower sash north window rear rooms 2nd story apartment
Nov 19, 2003
Open — Nov sent out - BHazardous
Properly secure the loose hand rail, 2nd story public hall.
Nov 19, 2003
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in kitchen sink & bathtub, 2nd story apt. #1.
Nov 19, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective make operable upper & lower sashes throughout 2nd story apt. #1.
Nov 19, 2003
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings & walls throughout apt, 2nd story apt. #1
Nov 19, 2003
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in bathtub drain bathroom, 2nd story apt. 2. er1
Nov 19, 2003
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom, 3rd story apt. 2.
Nov 19, 2003
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls center room, 3rd story apt. 2.
Nov 19, 2003
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in bathtub and washbasin 3rd story apt. #2
Nov 19, 2003
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in wasbasin & bathtub 3rd story apt. 2 bathroom
Nov 19, 2003
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet 3rd story apt. 2 bathroom
Nov 19, 2003
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings all rooms throughout 2nd story apartment
Jul 11, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches throughout 2nd story apartment
Jul 11, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective on/off handle hot water kitchen sink 2nd story apartment
Jul 11, 2003
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling all room throughout 2nd story apartment
Jul 11, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of no electrcity all fixtures all rooms throughout 2nd story apartment
Jul 11, 2003
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures gas stove kitchen 2nd story apartment
Jul 11, 2003
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cement and ceramic floor tile, bathroom 3rd story 2.
Jul 11, 2003
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective bell system, 3rd story apt 2.
Jul 11, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood door jam & frame entrance 3rd story apartment
Jul 11, 2003
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of baby furniture playpen household items 3rd story public hall
Jul 11, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of of exposed electrical wires ceiling east room 2nd story apt 2.
Jul 11, 2003
Open — Nov sent out
DOB building violations
4 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
2 ECB violations, newest first.
- Non-hazardous
Work without a permit. work noted: having constructed a rear extension approx. 20ftx25ftx10ft high. frame extension with roofing materials for siding fans/ tables and chairs noted in rear extension, roof pitche
Oct 14, 1999 · Penalty $500
Resolve - Non-hazardous
Work without a permit a brick oven has been lonstructed/installed in rear of premises (1st flr). without a valid permit. remedy: obtain a permit from this dept. if feasible, or restore premises to prior legal
Mar 6, 1992
Resolve