Violations at 8012 6 Avenue
Brooklyn, NY 11209 · BBL 3-05990-0044 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
No DOB violations on record
ECB violations
12 ECB violations, newest first.
- Class - 2
At time of inspection observed at exposure #1 corner #4, adjoining property has full access to active jobsite. possibility of injuries exists for the public. stop all work secure jobsite from unauthorized acce
Mar 11, 2026 · Penalty $5,000
Active - Class - 2
Supported scaffold not built to code. netting not secured bc 3314.8.2 planks not tied down bc 3314.12.6 missing bracing bc 3314.9 missing cross braces (structual integrity) bc 3314.4.1 comply with code for inst
Feb 27, 2026 · Penalty $2,500
Active - Class - 1
Removed or defaced a written posted stop work order. vio-# 39155996z -active stop work /issued on 08/05/2025 has been removed w/o authorization by dob. no records of corrections, comply with code
Oct 1, 2025 · Penalty $5,000
Active - Class - 1
Atoi of a 3-story bldg it was observed that the site was under a full stop work order, since o8/05/2025.by badge:#2868-vio-# 39155996z upon inspection performed it reveled failure to comply with. full stop swo@
Oct 1, 2025 · Penalty $10,000
Active - Class - 1
Atio on an active jobsite, i observed that the no ohp @ adj property in place of entrance for property at exp3&4# was short by #5 feet and did not cover the entire door entrance as requested by code. and adjace
Aug 5, 2025 · Penalty $2,500
Active - Class - 1
Observed structural work in progress between floors w/ temporary makeshift shoring at building to secure/ support floors. while removing joist &adding 16''x20 beam not indicated, failure to provide pe approved
Aug 5, 2025 · Penalty $2,500
Active - Class - 1
At time of inspection on a 3-story building, observed no guard rails on multiple locations throughout building, open floors, windows & balconies.no guardrails systems create a hazard for falls., provide guard r
Aug 5, 2025 · Penalty $5,000
Active - Class - 1
Obs pipe scaffold @ 3 story bldg.observed a platform built on open space made of 2x4 & plywood scaffold cross braces corroded,untied planks, also observed that there were missing pins,mudd sills guardrails on p
Aug 5, 2025 · Penalty $5,000
Active - Class - 1
At time of inspection on an active jobsite, i observed large amounts of debris scattered throughout site also on rear yard exp#1/3.&basement large amounts of debris create a tripping hazard also could create a
Aug 5, 2025 · Penalty $2,500
Active - Class - 2
At time of inspection of a three-story building observed general alteration work in progress without a valid permit, for construction fence up on review of bis/dob now search reveal, according to crm, the permi
Aug 5, 2025 · Penalty $625
Resolve - Class - 1
Observed structural work in progress, more than 50 demolished, multiple sistering joist, and new structural (joist) work in progress. specifications states that structural work must be performed after nb or alt
Aug 5, 2025 · Penalty $1,250
Resolve - Class - 2
Upon inspection i observed a fence installed at exposure 1 with no fence project info panel provided contrary to code 3301.9.1 fence project information panel. where a site is enclosed with a fence in accordanc
Jun 25, 2025 · Penalty $1,250
Active