roofy

Violations at 575 80 Street

Brooklyn, NY 11209 · BBL 3-05981-0047 · Back to the property

HPD housing violations

The newest 50 of 312 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove device preventing door from being self-closing hook and eye at building entrance door at public hall, 1st story

    Dec 23, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic floor tiles in the 1st room from north at west located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective [ inoperative ] light fixtures at ceiling in the 1st room from north at west located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov certified late
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 3a, 1st story, 1st apartment from east at south

    Jan 12, 2022 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 1st story, 1st apartment from north at east

    Feb 16, 2021 · Apt 3A

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 1st story, 1st apartment from north at east

    Feb 16, 2021 · Apt 3A

    Open — Notice of issuance sent to tenant
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding beyond window sill at 2nd story balcony at east yard

    Feb 16, 2021

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3a, 1st story, 1st apartment from east at south

    Dec 23, 2020 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Replace with new the missing escutcheon plate at ceiling at the riser in the 1st room from east at south located at apt 3a, 1st story, 1st apartment from east at south

    Dec 23, 2020 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... at ceiling (approx. 1 sq ft) in the kitchen located at apt 3a, 1st story, 1st apartment from east at south original violation 13867631 issued 24-oct-20 has been upgraded to class b per administrative code ''''27-2017.3a(3)(a) or (b).

    Oct 24, 2020 · Apt 3A

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... east wall (approx. 1 sq ft) inside east closet in the 2nd room from north located at apt 3a, 1st story, 1st apartment from east at south original violation 13867622 issued 24-oct-20 has been upgraded to class b per administrative code ''''27-2017.3a(3)(a) or (b).

    Oct 24, 2020 · Apt 3A

    Closed — Violation closed
  • BHazardous

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall, 1st story

    Oct 24, 2020

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor in the 4th room from north at west located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 4th room from north at west located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... at ceiling (approx. 1 sq ft) in the kitchen located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective wood drawer at sink base cabinet in the kitchen located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... east wall (approx. 1 sq ft) inside east closet in the 2nd room from north located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective electrical light fixtures at ceiling in the 2nd room from north located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective electrical light fixtures at ceiling in the kitchen located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective electrical light fixtures at ceiling in the foyer located at apt 3a, 1st story, 1st apartment from east at south

    Oct 24, 2020 · Apt 3A

    Closed — Violation dismissed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the foyer located at apt 3a, 1st story, 1st apartment from north at east

    Aug 28, 2020 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 2nd room from east at north located at apt 3a, 1st story, 1st apartment from north at east

    Aug 28, 2020 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchen located at apt 3a, 1st story, 1st apartment from north at east

    Aug 28, 2020 · Apt 3A

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 1st story, 1st apartment from north at east

    Aug 28, 2020 · Apt 3A

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 1st story, 1st apartment from north at east

    Aug 28, 2020 · Apt 3A

    Open — Notice of issuance sent to tenant
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of protruding air conditioner units at 2nd and 3rd story balconies, west stack at building front

    Aug 28, 2020

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall

    Aug 9, 2020

    Closed — Violation closed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures ceiling light at the eastnorth section in the 2nd room from east located at apt 3a, 1st story, 1st apartment from north at east

    Aug 9, 2020 · Apt 3A

    Open — Nov sent out
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding beyond window sill at the 2nd at 3rd story balconies at the 1st stack from west at south exterior wall.

    Aug 4, 2020

    Open — Nov sent out
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting air conditioner protruding beyond window sill at 2nd story balcony at east exterior wall .

    Aug 4, 2020

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of household items at public hall, 1st story

    Aug 4, 2020

    Closed — Violation closed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioning unit protruding from the window sill more than 4 inches at 3rd story balcony, west stack, building front

    Jul 16, 2020

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the missing escutcheon plate at riser top in the 4th room from east at south located at apt 3a, 1st story, 1st apartment from north at east

    Jul 16, 2020 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3a, 1st story, 1st apartment from north at east

    Jul 16, 2020 · Apt 3A

    Closed — Violation dismissed
  • BHazardous

    Replace with new the broken or defective glass pane at upper sash window at south wall in the bathroom located at apt 3a, 1st story, 1st apartment from north at east

    Jul 16, 2020 · Apt 3A

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 1st story, 1st apartment from north at east

    Jul 16, 2020 · Apt 3A

    Open — Not complied with

DOB building violations

17 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Ftm / sws

    Dec 21, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 19, 2016

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 8, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 13, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 4, 2013

    Dob violation - dismissed
  • Emergency none

    Egncy-emergency none

    Sep 5, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 23, 2006

    Vw*-violation - work w/o permit dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed

ECB violations

16 ECB violations, newest first.

  • Class - 2

    Failure to conductor filea finalinspection of permitted work with the department. at time of my inspection observed: job# 321553644 job not signed off as per dob requirement for permit. expired onthe 11/17/2018

    Sep 26, 2022

    Resolve
  • Class - 2

    Failure to conduct or file a final inspection of permited work with the department noted:at time of inspection observed at exposure(1) and (4) exterior roof parapet fully complete under application#3214612140 e

    Mar 4, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w. the commissioner's order to file a certificate ofcorrection w. dept of bldgs.observed conditions remain for violations ;35017801z,9-3-13 certificate disaproved,35085590m 5-5-14, 35099632z 7

    Dec 17, 2016 · Penalty $800

    Resolve
  • Class - 3

    Failure to maintain bldg in code compliant manner.observed steel garden fence approx 2'-3' feet high located @ exp #4 on 6th ave broken in 3places,held together w. strong &wire w. stakes in ground.rem:repair an

    Dec 17, 2016 · Penalty $250

    Resolve
  • Class - 1

    Failure to maintain exterior bldg wall in that on 6th ave side of bldg,there is a crack in brickwork between 3rd fl window & parapet. it also appears that parapet is leaning in towards roof. provide structural

    Aug 23, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Work w/o a permit.@time of inspection 10am on 7/19/16 @above address iobserved in the basement new 11 1/4 blk pipe going from the gas meter 3b to the boiler's pilot gas work was never filed.*pictures taken*.rem

    Jul 19, 2016 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to maintain bldg in a code complaint manner. note: at the paparpet wall on the 6th ave side of bldg. cracks from parapet to the top of 3rd fl windows. remedy: repair &/or replace defective parapet wall.

    Mar 6, 2015 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain bldg walls.note defective brick work with cracking displacement & mortal missing 2nd fl to parapet front & sides,no repairs observed.rem:maintain bldg wall repair defects

    Jul 7, 2014 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to maintain bldg walls note defective brick work w/cracking, displacement & mortar missing, 2nd fl to parapet front & sides, no repairs observed since last violation- no filing.rem: obtain permits,insta

    May 15, 2014 · Penalty $25,000

    Resolve
  • Class - 1

    Failure to maintain bldg walls or appurtenances. note: brick facade cracked at 3 floor front left & right side of bldg. large cracks developat exposure 3 from 2nd fl to 3rd fl. brack parapet wall leaning at

    Sep 3, 2013 · Penalty $5,000

    Resolve
  • Class - 3

    16,32a,48a,50b,15,24b,34b,50a,50c. 50a- fresh air undersized.50b- remove all storage from boiler room. 50c- remove all flammable.

    Mar 10, 2009 · Penalty $250

    Resolve
  • Class - 2

    Work w/o a permit. at time of inspection observed at 1st flr, at apt 2a the installation of a acoustical grid ceiling in the living room andbedroom and bthrm w/o any permits/job applications filed. ceiling are

    Feb 11, 2009 · Penalty $2,000

    Resolve
  • Hazardous

    Failure maintain bldg-noted in apt 2a rear bedroom southeast corner there exist a vertical crack from flr to ceiling 1/4 inches.opening enough to see through adjoining apartment 3a.remedy:obtain a permit

    Jan 19, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain exterior bldg wall. defect in brick wk cracked & martor joint missing @ 2nd&3rd story to roof parapet cracks approx 1/4 to 1/2" w/brick wk shifting out of plumb over 3rd story window lintel.

    Jul 7, 2006 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain adequate housekeeping-hazardous.noted:excessive combustible construction debris piled 3 1/2'high piled at rear alleyway e.g. particce board wood doors,cabinets,paneling,1" x 6",3" x 3"

    Jun 22, 2006 · Penalty $1,000

    Resolve
  • Non-hazardous

    Failure to maintain building-hazardous.noted at time of inspection illegal storage of construction/demolition debris piled-up excessively onthe east side of said premises next to occupant windows view.

    Jun 3, 2006

    Resolve