7910 4 Avenue
Brooklyn, NY 11209BBL 3-05979-0044Map
Owner of record: Mingji Ave4 Realty LLC
7910 4 Avenue is an elevator apartment building built in 2023 in Brooklyn, 11209. It has 10 residential units across 6 floors. The owner of record is Mingji Ave4 Realty LLC. HPD has recorded 25 housing violations here, most recently on August 15, 2005.
- HPD violations
- 25
- DOB violations
- 6
- ECB violations
- 22
- HPD complaints
- 54
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- BHazardous
Properly repair with similar material the broken or defective ceramic wall tile at south wall in the bathroom located at apt 1fl, 1st story
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1fl, 1st story
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder keyoperated lock in the entrance located at apt 1fl, 1st story
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 1fl
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 1fl
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 1fl, 2nd story
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 1fl
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 1fl, 1st story
Aug 15, 2005 · Apt 1FL
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of evidence of water leak at ceiling in the 1st room from east located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed
Show 15 more ↓
- BHazardous
Abate the nuisance consisting of evidence of water leak at ceiling in the kitchen located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at north located at apt ph, 2nd story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Replace with new the missing wood baseboard in the 2nd room from east at north located at apt ph, 2nd story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective floor ceramic tiles in the bathroom located at apt ph, 2nd story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls in the foyer located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of exposed wire at ceiling in the bathroom located at apt ph, 2nd story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective walls ceramic tiles in the bathroom located at apt ph, 2nd story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls in the private hallway located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt ph, 1st story, 1st apartment from south at west
Aug 12, 2005 · Apt PH
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective water valve handle at north yard
Aug 12, 2005
Closed — Violation dismissed
DOB building violations · 6
- Construction other optional
Borough commissioner has ordered all stopped under permit #321762847 on 10/28/24. contractor withdrawal. superstructure is completed and no access to the interior due to closed site. unable to determine the percentage of work completed. stop all work under job # referenced and make site safe.
Oct 29, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 15, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Construction other optional
@ time of inspection observed construction activities contrary to the mayor's exec order 120 & subsequent orders incorporating requirements of governor's exec order 202.34 & subsequent orders& evidance publishe d by the nys dept of health pursuant to same.observed 4 men working w/o place to clean hands&requirements to provide covid-19 safety plan
Jun 9, 2020
Dob violation - dismissed - Construction other optional
Stop all work/except to make sit safe
Mar 13, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed
ECB violations · 22
- Class - 1
Observed at exp#1 balconies railing installation, at 3rd floor balcony worker working on ladder without protection/life line, at second floor worker on balcony where no guard railing or protection. no fire-watc
Nov 1, 2023 · Penalty $2,500
Resolve - Class - 2
At the time of inspection 6 stories i observed temporary platform in elevator shift no design drawing on site provided no work at elevator shift provide design drawing for temporary platform
Apr 18, 2023
Resolve - Class - 2
At the time of inspection 6 stories alt building i observed sws on place with building highest about 40 feet high requested approved drawing, daily inspection logs, drawing for temporary platform on elevator sh
Apr 18, 2023
Resolve - Class - 2
At the time of inspection alt 6 stories i observed cmu work in progress for exterior wall at exp#2 on 3rd fl level and windows not protected for adj building exp#2 distance with about 5 feet away.no exterior wo
Apr 18, 2023
Resolve - Class - 2
Failure to maintain adequate housekeeping.at time of inspection of active jobsite observed at exp #3 large amounts of construction debris scrap of building materials inadequate housekeeping creates unsafe condi
Sep 21, 2021
Resolve - Class - 1
Failure to file evidence of liability and/or property damage insurance.at time of inspection of active jobsite of 6 story building observed after doing further research on bix research revealed general liabilit
Sep 21, 2021 · Penalty $5,000
Resolve - Class - 1
Bc3309.9 failure to provide weatherproof integrity of adjoining property.at time of inspection of active jobsite of 6 story building observed at exp #3 #4 #2 excavation operation in progress observed adjoining
Sep 21, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3307.2.1 obstruction of street or sidewalk without dot permit.at time of inspection of active jobsite observed at exp #1 streel rebar truck on street and closing the pedestrians sidewalk upon review for dot
Sep 21, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3307.5 failure to provide flag person/flagger.at time of inspection of active jobsite observed at exp #1 on street truck of steel rebrs being lift from the truck to inside the site 30 feet height on air and t
Sep 21, 2021 · Penalty $2,500
Resolve - Class - 2
Bc3303.4.1 slipping and tripping hazards.at time of inspection of active jobsite observed at exp #1 sidewalk badly cracked and unleveled failure to maintain sidewalk as required clear from cracked tripping haza
Sep 21, 2021
Resolve
Show 12 more ↓
- Class - 2
Temporary construction equipment on site expired permit.at time of inspection of active job site of 6 story building observed construction fence erected in place upon review of bix and dob now research revealed
Sep 21, 2021
Resolve - Class - 1
Failure to maintain/display onsite documents required by chapter 33.attime of inspection at an active jobsite,i observed adjacent propertiesat exposure 2,3,and 4 were being monitored during excavation/foundatio
Jan 25, 2021 · Penalty $1,250
Resolve - Class - 2
3301.13.5 alternate construction superintendent.at time of inspection at an active construction jobsite upon revewing the daily logbook,i observed the designated construction superintendent(francis owoh)was out
Jan 25, 2021
Resolve - Class - 2
Work does not conform to approved documents &/or approved amendments. at time of inspection at an active construction job site. i observed the respondent did excavations at exp#1 that exceeded 6ft. according to
Jan 25, 2021
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments. observed work in progress under permit#321762847-01-fo-ea dated exp 2/21/21 & approved set of drawings for ears & foundation wor
Jul 30, 2020
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35198717l issued on 07/07/16 & to file a c of c pursuant to 28-201.1 & 1rcny 02-01. for c of c. remedy: comply w/comm's order &/or file a c of c.
Jan 20, 2017
Resolve - Class - 2
Failure to comply w.the commissioner's order contained in nov#35198717l issued 07/07/16 &to file a certificate of correction pursuant to 28-201.1,28-204.4 &1rcny 102-01.for cofc,the house has been occupied by s
Dec 15, 2016
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35193717l issued on 07/07/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. occupancy contrary to that allowed by the c of o. remedy: comp
Oct 17, 2016
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in nov# 35198717l issued on 7/7/16 & to file a c of c pursuant to 28-201.1, 28-204.4& 1rcny 102-01. rem: comply w/ commissioner's order &/or file a c of c
Aug 23, 2016
Resolve - Class - 2
Work w/o a permit.noted at cellar level, erected full height partitionwalls creating a bathroom.installed water and waste lines for a three pc bathroom (toilet,sink,shower).rmdy:obtain permit.
Jul 7, 2016
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or building dept records. noted dob records indicate a one-family,1st-2ndflr dwelling cellar (boiler,storage),attic(storage).at time of inspect
Jul 7, 2016
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. noted:gutter at exposure 1 first flr is bent & partially detached from strap fasteners. stucco facade at exposures 2,4 is spalling bulging & has partially
Jul 18, 2012 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Feb 7, 2019 · Apt BLDG
Close - Water leak
Slow leak
Dec 29, 2016 · Apt 2FL
Close - Flooring/stairs
Stairs
Dec 2, 2016 · Apt 1FL
Close - Flooring/stairs
Stairs
Dec 2, 2016 · Apt 1FL
Close - Paint/plaster
Ceiling
Dec 2, 2016 · Apt 1FL
Close - Flooring/stairs
Floor
Dec 2, 2016 · Apt 1FL
Close - Appliance
Electric/gas range
Dec 2, 2016 · Apt 1FL
Close - Flooring/stairs
Floor
Dec 2, 2016 · Apt 1FL
Close - Water leak
Slow leak
Dec 2, 2016 · Apt 1FL
Close - General
Floor
Aug 9, 2005 · Apt PH
Close
Show 40 more ↓
- Paint/plaster
Wall
Aug 9, 2005 · Apt PH
Close - General
Mold
Aug 9, 2005 · Apt PH
Close - General
Mold
Aug 9, 2005 · Apt PH
Close - General
Ceramic-tile
Aug 9, 2005 · Apt PH
Close - Electric
Wiring
Aug 9, 2005 · Apt PH
Close - General
Floor
Aug 9, 2005 · Apt PH
Close - General
Floor
Aug 9, 2005 · Apt PH
Close - General
Floor
Aug 9, 2005 · Apt PH
Close - Plumbing
Water-leaks
Aug 9, 2005 · Apt PH
Close - Electric
Wiring
Aug 9, 2005 · Apt PH
Close - Plumbing
Water-leaks
Aug 9, 2005 · Apt PH
Close - General
Floor
Aug 2, 2005 · Apt 1FL
Close - Electric
Lighting
Aug 2, 2005 · Apt 1FL
Close - Electric
Lighting
Aug 2, 2005 · Apt 1FL
Close - General
Floor
Aug 2, 2005 · Apt 1FL
Close - General
Floor
Aug 2, 2005 · Apt 1FL
Close - Plumbing
Water-leaks
Aug 2, 2005 · Apt 1FL
Close - Plumbing
Water-leaks
Aug 2, 2005 · Apt 1FL
Close - Plumbing
Water-leaks
Aug 2, 2005 · Apt 1FL
Close - General
Floor
Aug 2, 2005 · Apt 1FL
Close - Paint/plaster
Wall
Aug 2, 2005 · Apt 1FL
Close - Electric
Lighting
Aug 2, 2005 · Apt 1FL
Close - General
Cooking gas
Jan 20, 2005 · Apt 1
Close - Heating
Heat related
Jan 20, 2005 · Apt 1
Close - Electric
Electric-supply
Jan 19, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 19, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 19, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 19, 2005 · Apt NA
Close - Electric
Electric-supply
Jan 18, 2005 · Apt NA
Close - Heating
Heat related
Jan 18, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 18, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 17, 2005 · Apt NA
Close - Electric
Electric-supply
Jan 17, 2005 · Apt NA
Close - General
Cooking gas
Jan 17, 2005 · Apt NA
Close - Appliance
Electric/gas range
Jan 17, 2005 · Apt 1FL
Close - Heating
Heat related
Jan 17, 2005 · Apt 1FL
Close - Electric
Electric-supply
Jan 17, 2005 · Apt 1FL
Close - Electric
Electric-supply
Jan 16, 2005 · Apt NA
Close - Heating
Heat related
Jan 16, 2005 · Apt 1FL
Close - General
Cooking gas
Jan 16, 2005 · Apt NA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2023
- Floors
- 6
- Residential units
- 10
- Building area
- 13,431 ft²
- Lot area
- 3,000 ft²
- Zoning
- R7B
- Community board
- 310
- Council district
- 47
- Block / lot
- 5979 / 44
- Assessed value
- $1,133,865
- Landmark / historic district
- No
HPD registration #392043, last renewed Jul 24, 2026.
Questions about 7910 4 Avenue
Who owns 7910 4 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mingji Ave4 Realty LLC.
Does 7910 4 Avenue have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 7910 4 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 7910 4 Avenue built?
City records list 2023 as the year it was built.
How many apartments are in 7910 4 Avenue?
It has 10 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.