HPD housing violations

No HPD violations on record

DOB building violations

16 DOB violations, newest first.

  • Construction other optional

    Due to the withdrawal of the superintendent of record the b.c office will stop all work immediately under job b08042743 make site safe & kindly contact the b.c. office at 718 802-3677 asap with appropriate information in response to this letter

    Apr 2, 2026

    Dob violation - active
  • Construction other optional

    Due to the withdrawal of the superintendent of record the b.c. office will stop all work immediately under job b08042743 make site safe & kindly contact the b.c. office at 718 802-3677 asap with appropriate information in response to this letter

    Apr 2, 2026

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 7, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations

The newest 50 of 66 ECB violations. The city keeps the complete history.

  • Class - 2

    Failure to maintain building in code-compliant manner.noted:the smoke doors at stairway a and c on the basement level,and the inside door atexit 8 are not operating correctly.mostly because the doors hit the ja

    May 14, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.noted:the exterior lighting at the school playground and the walkway from 78th st to the playground are not working.rem:repair/replace exterior lighting.

    May 14, 2026 · Penalty $1,250

    Active
  • Class - 2

    At time of inspection of 5 story building observed pipe scaffold in place with white tarp attached & enclosed scaffold at exposure #1,3&4. observed sections where tarp and debris netting was loose. upon review

    Jan 23, 2025

    Resolve
  • Class - 2

    Laars domestic hw boiler=draft proving switch missing at the draft inducer, maintain boiler; correct violation and submit the certificate of correction

    Apr 12, 2023 · Penalty $625

    Active
  • Class - 3

    Body drain pipes missing at safety valves/vent limiter missing at gas piolit regulator;correct violation and submit the certificate of correction

    Apr 12, 2023 · Penalty $500

    Active
  • Class - 3

    Vent limiter missing in gas piolit regulator/body drain pipes missing at safety valves;correct violation and submit the certificate of correction

    Apr 12, 2023 · Penalty $500

    Active
  • Class - 2

    Oil shut off valve is missing at top of each oil tank;correct violation and submit the certificate of correction

    Apr 12, 2023 · Penalty $625

    Active
  • Class - 2

    Exit door not self closing properly at the time of inspection. at the time of inspection i observed&noted at main entrance 1 exit door 1st layer(outside) not self closing properly,2 exit door back side of main

    Jul 14, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v39037236z issused 3/5/21 &to file c/c pursuant to28-201.1&1rcny102-01.failureto protect adjoining bldg.comply w/commissioner's order &/or file c/c.

    May 13, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to protect adjoining structures during excavation operations. at time of inspection observed at expo #2 ongoing excavation work has caused a section of concrete stucco to detach along with step cracks a

    Mar 5, 2021 · Penalty $5,030

    Resolve
  • Class - 2

    Failure to safeguard all persons and properly affected by construction operations note at the tie of inspection i observed damage to adjacent properly 923 79 st in basement severe water damage to sheetrock caus

    Nov 20, 2020 · Penalty $5,030

    Resolve
  • Class - 1

    Failure to comply w/manufacturer specifications. note att he time of inspection,i observed worker using a scissor lift. upon request for training card to operate machine none was provided. this creates a unsafe

    Nov 17, 2020 · Penalty $2,530

    Resolve
  • Class - 2

    Sec. 3314.1 unsafe supported scaffold. note: at the time of inspection,i observed supported scaffold in place. 1)missing guardrails 2)not fully stated 3)debris netting loose & damaged. this creates a unsafe con

    Nov 17, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. noted: at basement electric meter room storage of various items tools, cabinets, ladder, etc. remedy: comply with code

    Oct 28, 2020 · Penalty $625

    Resolve
  • Class - 2

    Exit door not self closing note: doors to multi purpose room are not self closing. remedy: repair/replace door.

    May 29, 2020 · Penalty $625

    Resolve
  • Class - 1

    Unsafe storage of combustible material & equipment. note: observed in electrical meter room,several boxes & some of the junitors equipment store. no storage of any kind is permitted in meter rooms. remedy: main

    May 29, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: illumination for exits,exit discharges & public corridors per bc 1006.1;27-381. note: in multi purpose room on 3rd fl,emegency lights not working when tested.

    May 29, 2020 · Penalty $625

    Resolve
  • Class - 2

    Project information panel.at time of inspection i did not observed my project information apenl at the 78th street side of project.remedy:comply with code,provide project info panel.

    Apr 3, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc3303122-no hoist readiness for fdny operations.at time of inspectionof an active site currently at upper roof level and at a height in excess of 75 foot observed temporary hoist at ground level exposure#1.aft

    Jan 16, 2020 · Penalty $2,530

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35433401m issued on 10-02-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to institute/maintain safety equipment measures or temp

    Dec 13, 2019 · Penalty $3,125

    Resolve
  • Class - 1

    Missing toe boards & loose netting. note: at the time of inspection it was observed at ground level missing toe board & that netting was loose at various parts of the bldg. remedy: comply w/code.

    Oct 2, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. note at roof level roof leaks on south side ogf bldg causing damage to ceiling below in stairway d & room 304. remedy: repair & or replace.

    Jul 23, 2019 · Penalty $625

    Resolve
  • Class - 2

    Reissue 35335258j failure to maintain bldg in code compliant manner. note at 3rd fl stairway d wall leaks when raining at ceiling of stairwell. remedy: repair & or replace.

    Jul 23, 2019 · Penalty $1,562

    Resolve
  • Class - 1

    Failure to notify dob within 24-48 hours of the start of excavation. observed at time of inspeciton contractor has excavated for the new building foundation walls and earthwork notification was provided. no

    Jun 26, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner.noted;electrical room being used for storage.multiple floor wax machines,handtruck,plastic bins,boxes,tables,garbage can,all being stored in electrical rm.rem:r

    Jun 11, 2018

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner.noted:@cellar level electrical room missing firestopping at areas where pipes are penetating wall.rem:provide/maintain fire stopping.

    Jun 11, 2018

    Resolve
  • Class - 2

    Bc28-301.1:unlawful placement of furnishings,decorations or other objects at exits that obstruct access to egress from or visibility.therof per fdny.2008.code;fc1027.4.noted:@cafeteria area there are two exit

    Jun 11, 2018

    Resolve
  • Class - 2

    Failure to maintainbldg in code-compliant manner.ilumnation for exits,exit discharges and public corridors per bc 1006.1,27-381-noted:stwy and c emergency lights not working.rem:repair and/or replace.

    Jun 11, 2018

    Resolve
  • Class - 3

    Failure to maintain bldg in code compliant manner.noted:at 3rd fl brick wall,stuy d,the wall leaks when raining.rem:repair and/or replace.

    Jun 11, 2018

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. racked doors: reissue ecb 35094376. the following doors are racked and deteriorating.basement: bathroom b14,b4, stairway exit b, exit 9 @stairway a,exit 8

    May 20, 2015

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. reissue ecb 35094377h rusted bathroom stalls. bathroom stalls in 105-108 are rust ed with exposed sharp edges. rmdy: complay with nov.

    May 20, 2015

    Resolve
  • Class - 2

    Defective door hardware. exit 9 door at basement cafeteria, panic bar does not latch. remedy: repair panic bar.

    Apr 29, 2014

    Resolve
  • Class - 2

    Re-issue # 34953934h. bathroom stall rusted. bathrooms 105 & 108 rusted with exposed sharp edges. remedy: replace bathroom stalls.

    Apr 29, 2014

    Resolve
  • Class - 2

    Re-issue # 34953933x. racked doors. -in basement bathroom door #b14, exit 8 vestibule doors, b-4, exit 3 doors area racked & defective. remedy: repair &/or replace doors.

    Apr 29, 2014

    Resolve
  • Class - 2

    Fire stopping missing. 1-paint room walls; 2-fuel tank room - wall; 3-boiler room ceiling and walls near fule tank room. rmdy: maintain building as per code.

    Jun 17, 2013

    Resolve
  • Class - 3

    Electrical room used as office and storage basement. rmdy: remove desk, chairs and cabinets.

    Jun 17, 2013

    Resolve
  • Class - 2

    Basement behind oil tank room combustible material open and empty cardboard boxes piled high. rmdy: immediately remove all combustible boxes.

    Jun 17, 2013

    Resolve
  • Class - 2

    Reissue: 34953933x doors not closing. basement room b14 (boys bathroom in 70 street cafeteria) exit 8 vestibule doors basement stwy b&d. room b-4 racked. rmdy: repair and/or replace doors.

    Jun 17, 2013

    Resolve
  • Class - 2

    Reissue: 34953934h sanitary stall partitions rusted deteriorated withexposed sharp edges 1st story kindergarten bathrooms in rooms 105 and 108. rmdy: repair and/or replace partitions.

    Jun 17, 2013

    Resolve
  • Class - 2

    Sanitary stall partitions rusted/deteriorated with exposed sharp edgesat 1st story kindergarten bathrooms in rooms 105 & 108. rem:repair &/or replace partitions.

    Apr 24, 2012

    Resolve
  • Class - 2

    Doors not closing. at:basement room b14 (boys bathroom in 70th street cafeteria) exit 8 vestibule doors. rem:repair &/or replace doors.

    Apr 24, 2012

    Resolve
  • Class - 2

    Water damage fl at room 302, flooring missing. remedy: repair floor

    Apr 16, 2010

    Resolve
  • Class - 2

    Water penetration into rooms 301, 302, 307, 308, 309, 210a, 02, boys bathroom 3fl teachers bathroom all levels. remedy: seal all penetration

    Apr 16, 2010

    Resolve
  • Hazardous

    Plaster is cracked and spalling located in room 301 on the 3rd fl .remedy:repair plaster on wall & ceiling.

    May 9, 2007

    Resolve
  • Non-hazardous

    Failure to maintain exteriro bldg wall noted water is leaking into thefollowing classroom 102,106,108 pointing needed at 1st floor mortar i s missing from fornts remedy:maintain bldg.

    Feb 4, 2004

    Resolve
  • Non-hazardous

    Failure to provide fire segrogation of occupancies noted no fire doorsin place at 3rd floor adjacent rooms 306 & 308 remedy:replace/install fire doors.

    Feb 4, 2004

    Resolve
  • Non-hazardous

    Failure to maintain noted east side of school (78 st side)missing stucco leaving exposed brick rear entrance to cellar remedy:repair as needed

    Feb 4, 2004

    Resolve
  • Non-hazardous

    Failure to maintain note handrails are missing at 79 st side stairway handrail on left side remedy:provide handrail.

    Feb 4, 2004

    Resolve
  • Non-hazardous

    Failure to maintain note all windows entire school all floors windows are in disrepair windows dont open sashes are all warped windows dont stay open glass in cracked and loose remedy:make all necessary repair

    Feb 4, 2004

    Resolve
  • Hazardous

    Cease use 8(b)/ 9(a)(b)/ 49/ b4b/ 51/ (b4b) illegal weld to seal crack on the internal furnace of the first tube scotch marine loa pressure steam heating boiler. the uncertified weld is on the rear upper re

    May 6, 2003

    Resolve