roofy

Violations at 7823 5 Avenue

Brooklyn, NY 11209 · BBL 3-05971-0001 · Back to the property

HPD housing violations

The newest 50 of 60 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 7, 2024

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Aug 7, 2024

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 7, 2024

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 7, 2024

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tile at public hall, 1st story

    Aug 7, 2024

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) wainscotting at north wall in the private hallway located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from north at west located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from north at east wall in the 2nd room from north at west located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, north wall in the 1st room from north at east located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall, 1st window frame from west at north wall in the 1st room from north at east located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • BHazardous

    Properly secure the loose sink at wash basin in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets faucet at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective at door in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... aprrox 10 sq ft 1st window frame from north at east wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — First no access to re- inspect violation
  • ANon-hazardous

    Paint metal in accordance with dept. regulation at 1st radiator from south at west wall, 1st radiator from south at west wall in the 1st room from north at west located at apt 3d, 3rd story, 1st apartment from west at north

    Jan 31, 2024 · Apt 3D

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 2, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 2, 2022

    Open — Nov sent out
  • CImmediately hazardous

    Code: arrange and make self-closing the doors in the entrance located at apt 4d, 4th story, 1st apartment from west at north

    Mar 2, 2022 · Apt 4D

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Mar 2, 2022 · Apt 4D

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Mar 2, 2022 · Apt 4D

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at basement at boiler room

    Mar 2, 2022

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Mar 2, 2022 · Apt 4D

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 18, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 5, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 1, 2016

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • ANon-hazardous

    Refit entrance door to building

    Aug 28, 2015

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall at vestibule

    Aug 23, 2012

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective fire retarding plaster at west wall at vestibule

    Aug 23, 2012

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of bedbugs located at apt 2d, 4th story, 2nd apartment from east at south

    Jul 9, 2012 · Apt 2D

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south

    Jan 9, 2011 · Apt 3A

    Open — First no access to re- inspect violation
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 18, 2007 · Apt 2B

    Open — First no access to re- inspect violation
  • CImmediately hazardous

    Repair the roof so that it will not leak over extension at public hall, 1st story

    Aug 18, 2007

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood floor, in the 1st room from north located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 18, 2007 · Apt 2B

    Open — First no access to re- inspect violation
  • BHazardous

    Replace with new the missing shower head at north wall, in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 18, 2007 · Apt 2B

    Open — First no access to re- inspect violation
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .... in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 18, 2007 · Apt 2B

    Open — First no access to re- inspect violation
  • ANon-hazardous

    M/d law abate the nuisance consisting of concealed leak ceiling in the private hallway located at apt 2d, 2nd story, 1st apartment from west at north

    Aug 6, 2007 · Apt 2D

    Closed — Violation closed

DOB building violations

6 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed
  • Public assembly none

    Pa-public assembly none

    Oct 19, 1988

    Dob violation - active

ECB violations

3 ECB violations, newest first.

  • Non-hazardous

    No equipment use permit for air condition unit mounted on roof remedy obtain equipment use permit fo a/c unit on roof area work remedy obtain a work permit

    Apr 8, 1999

    Resolve
  • Non-hazardous

    Occupancy contrary to bldg department records. from 1st floor store to bar and grill. remedy: obtain a valid c of o for the new use.

    Dec 1, 1994

    Resolve
  • Non-hazardous

    Operation of a pa without a current permit. failure to post approved pa capacity sign. failure to have pa plans available for inspection. emergency lighting inadequate. does not conform to ll 41/78.

    Oct 19, 1988 · Penalty $900

    Resolve