7826 3 Avenue
Brooklyn, NY 11209BBL 3-05968-0052Map
Owner of record: Alrassi Realty, LLC
7826 3 Avenue is a mixed residential and retail building built in 1928 in Brooklyn, 11209. It has 4 residential units across 3 floors. The owner of record is Alrassi Realty, LLC. HPD has recorded 35 housing violations here, most recently on August 16, 2024. 18 of the 35 most recent violations are still open.
- HPD violations
- 35
- DOB violations
- 16
- ECB violations
- 10
- HPD complaints
- 91
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- BHazardous
Properly repair with similar material the broken or defective concrete joints at brick on exterior wall between top of entrance door frame and seal of window , 2nd story
Aug 16, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete joints at brick on exterior wall between 3rd story window and roof
Aug 16, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... window stool approx. 1 sq. ft. in the 1st bathroom from east located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... window stool approx. 1 sq. ft. in the 1st bathroom from east located at apt 3, 3rd story, 1st apartment from north at east original violation 16736776 issued 12-mar-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wood cabinets upper and lower in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the 2nd room from east located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective as to make operable the lower window sash in the 2nd room from east located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed
Show 25 more ↓
- ANon-hazardous
Properly repair or replace the broken or defective closet door in the foyer located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective door bell in the foyer located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx. 18 sq. ft. in the 1st bathroom from east located at apt 3, 3rd story, 1st apartment from north at east
Mar 12, 2024 · Apt 3
Open — First no access to re- inspect violation - BHazardous
And department rules and regulations: remove the encumbrance obstructing egress from fire escapes consisting of household articles at 2nd story balcony at 1st stack from east at south at the building front at fire escape
Apr 10, 2023
Open — Nov certified late - BHazardous
And department rules and regulations: remove the encumbrance obstructing egress from fire escapes air conditioning units protruding beyond window sills on 2nd and 3rd stories balcony stack from west at south at building front at fire escape
Apr 9, 2023
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 22, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2019
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at eastsouth corner in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at southwest corner in the kitchen located at apt 2l, 2nd story, apartment at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 2l, 2nd story, apartment at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at south located at apt 2l, 2nd story, apartment at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at north located at apt 2l, 2nd story, apartment at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - BHazardous
Properly repair the broken or defective one wood door at wall cabinet in the kitchen located at apt 2l, 2nd story, apartment at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2l, 2nd story, apartment at east
Sep 25, 2019 · Apt 2L
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 11, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 8, 2018
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective locking device building entrance door at public hall, 1st story
Dec 19, 2011
Open — Nov certified late - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Dec 17, 2011 · Apt 2F
Open — Nov certified late - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3, 3rd story, 1st apartment from south at west
Feb 3, 2011 · Apt 3
Open — Nov certified late - BHazardous
Repair or replace the smoke detector missing located at apt 3, 3rd story, 1st apartment from south at west
Feb 3, 2011 · Apt 3
Open — Nov certified late
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Construction other optional
At time of inspection bricks fell onto adjacent properties roof due to construction operations. at exp.3 parapet wall partially dislodged leaning outward in danger of further collapse. engineers report required.
Sep 20, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed
Show 6 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Construction other optional
C-construction other optional
Aug 2, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 10
- Class - 1
Atoi observed loose/ falling brick at bulkhead parapet wall exp#2 3. gc fail to provide protection for adjacent property and person as advice by engineer to installed pipe scaffold for protection after sever
Mar 7, 2025
Resolve - Class - 1
Parapet wall collapsed at exp. # 2 and exp. # 3.bricks fell onto adj. property roof.1 injury reported. upon review the department records it was revealed that no notification was submitted to the department wit
Oct 18, 2024
Resolve - Class - 2
At roof level observed c hooks w/ suspended scaffold attached to bulkhead parapet wall. no notification found on dob records for installation of c-hooks and suspended scaffold. stop all use of suspended scaffol
Sep 20, 2024 · Penalty $10,000
Resolve - Class - 1
At roof level observed c hooks w/ suspended scaffold attached to bulkhead parapet wall, parapet wall at this location has collapsed at exp's. 2 and 3. bricks fell onto adjacent properties roof. at exp.3 parapet
Sep 20, 2024 · Penalty $25,000
Resolve - Class - 1
Unlawfully continue work while on notice of a stop work order. issued for ecb#35169768z issued 5-12-16. noted: at time of inspection on 5-16-17 i observed at cellar level walls & plumbing work removed/performed
May 16, 2017 · Penalty $4,800
Resolve - Class - 2
Work w/o a permit. noted at front erected/installed business awning signage w/indirect illuminated lighting. at 1st fl erected partitions creating a storage/office area. rmdy: obtain all required permits.
Apr 17, 2017 · Penalty $800
Resolve - Class - 2
Sec. 12-10;73-36 1 floor occupied as adult physical cultural establishment & physical cultural establishment w/o bsa approvals "tt spa massage parlor" remedy: discontinue illegal use.
May 12, 2016 · Penalty $2,000
Resolve - Class - 2
Work w/o permit. work noted: at 1 floor "tt sdpa" erect full height partitions to create massage rooms. install water & waste lines to create 3pc bathroom 1fl & cellar window business sign. work 100% complete.
May 12, 2016 · Penalty $800
Resolve - Class - 2
Occupancy contrary to that allowed by dob's records illegal occupany noted: 1 fl occupied as adult physical cultural establishment & physical cultural establishment"it spa"masage parlor w/o bsa approval.
May 12, 2016 · Penalty $1,200
Resolve - Class - 2
Illegal use in a commercial ci-3 district.notice at the time of inspection-multiple small roomjs with examinaiton beds massage and acupunctgure posters indicating that premises is being used as a physical cultu
Feb 25, 2015 · Penalty $800
Resolve
Complaints
- Electric
Outlet/switch
Mar 6, 2024 · Apt 3
Close - Unsanitary condition
Mold
Mar 6, 2024 · Apt 3
Close - Door/window
Door
Mar 6, 2024 · Apt 3
Close - Door/window
Window frame
Mar 6, 2024 · Apt 3
Close - General
Cabinet
Mar 6, 2024 · Apt 3
Close - Paint/plaster
Wall
Mar 6, 2024 · Apt 3
Close - Door/window
Door
Feb 7, 2024 · Apt 3
Close - Flooring/stairs
Floor
Feb 7, 2024 · Apt 3
Close - General
Cabinet
Feb 7, 2024 · Apt 3
Close - Paint/plaster
Wall
Feb 7, 2024 · Apt 3
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jan 31, 2024 · Apt 3
Close - General
Cabinet
Jan 31, 2024 · Apt 3
Close - Flooring/stairs
Floor
Jan 31, 2024 · Apt 3
Close - Door/window
Door
Jan 31, 2024 · Apt 3
Close - Paint/plaster
Wall
Jan 31, 2024 · Apt 3
Close - Paint/plaster
Wall
Jan 31, 2024 · Apt 3
Close - General
Cabinet
Dec 1, 2023 · Apt 3
Close - Electric
Outlet/switch
Dec 1, 2023 · Apt 3
Close - Appliance
Electric/gas range
Dec 1, 2023 · Apt 3
Close - Unsanitary condition
Mold
Dec 1, 2023 · Apt 3
Close - Door/window
Door
Dec 1, 2023 · Apt 3
Close - Flooring/stairs
Floor
Dec 1, 2023 · Apt 3
Close - Door/window
Window frame
Dec 1, 2023 · Apt 3
Close - Appliance
Electric/gas range
Nov 21, 2023 · Apt 3
Close - Electric
Wiring
Nov 21, 2023 · Apt 3
Close - Door/window
Door
Nov 21, 2023 · Apt 3
Close - Unsanitary condition
Mold
Nov 21, 2023 · Apt 3
Close - Door/window
Window frame
Nov 21, 2023 · Apt 3
Close - General
Cabinet
Nov 21, 2023 · Apt 3
Close - Paint/plaster
Wall
Nov 21, 2023 · Apt 3
Close - Paint/plaster
Wall
May 31, 2023 · Apt 3
Close - Appliance
Electric/gas range
May 31, 2023 · Apt 3
Close - Unsanitary condition
Mold
May 31, 2023 · Apt 3
Close - Flooring/stairs
Floor
May 31, 2023 · Apt 3
Close - Door/window
Window frame
May 31, 2023 · Apt 3
Close - General
Cabinet
May 31, 2023 · Apt 3
Close - Electric
Outlet/switch
May 31, 2023 · Apt 3
Close - Plumbing
Bathtub/shower
Apr 8, 2023 · Apt 3
Close - Door/window
Door frame
Apr 8, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Apr 8, 2023 · Apt 3
Close - Plumbing
Toilet
Apr 8, 2023 · Apt 3
Close - Flooring/stairs
Floor
Apr 8, 2023 · Apt 3
Close - Plumbing
Toilet
Apr 8, 2023 · Apt 3
Close - Safety
Fire escape
Apr 8, 2023 · Apt 3
Close - Door/window
Door
Apr 8, 2023 · Apt 3
Close - Flooring/stairs
Floor
Apr 8, 2023 · Apt 3
Close - Safety
Smoke detector
Apr 8, 2023 · Apt 3
Close - Safety
Carbon monoxide detector
Apr 8, 2023 · Apt 3
Close - Door/window
Door
Apr 8, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Apr 8, 2023 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1928
- Floors
- 3
- Residential units
- 4
- Building area
- 4,560 ft²
- Lot area
- 1,547 ft²
- Zoning
- R6B
- Community board
- 310
- Council district
- 47
- Block / lot
- 5968 / 52
- Assessed value
- $491,850
- Landmark / historic district
- No
HPD registration #816498, last renewed Jul 31, 2025.
Questions about 7826 3 Avenue
Who owns 7826 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Alrassi Realty, LLC.
Does 7826 3 Avenue have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 7826 3 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 7826 3 Avenue built?
City records list 1928 as the year it was built.
How many apartments are in 7826 3 Avenue?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.