Violations at 657 77 Street
Brooklyn, NY 11209 · BBL 3-05953-0070 · Back to the property
HPD housing violations
39 HPD violations, newest first.
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 6th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 1st window sash from south at west wall in the 1st room from north located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the private hallway located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall in the private hallway located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from north, the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall in the 4th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall in the 6th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2026 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway , the 5th room from east, the 4th room from east located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 3, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the private hallway located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 3, 2025 · Apt 1STFLO
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Nov 3, 2025 · Apt 1STFLO
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 5th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jul 17, 2025 · Apt 1
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at water closet, washbasin and shower stall at cellar
Jul 17, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 3rd room from north located at apt 1, 1st story, 2nd apartment from west at north
Jul 17, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall, 2nd window frame from north at east wall in the 4th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jul 17, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass at east window in the 4th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jul 11, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the 1st bathroom from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st bathroom from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 4th room from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st door frame from east at south wall in the 3rd room from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from west at north wall, 2nd window frame from west at north wall, 1st window frame from north at east wall in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st private hallway from north, the 3rd private hallway from north, the 2nd bathroom from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 5th room from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, 1st window frame from north at east wall in the 5th room from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from north at east wall, east wall, south wall in the 4th room from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, west wall, east wall, 1st window frame from north at east wall in the 3rd room from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall, east wall, south wall, west wall in the 1st bathroom from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 12, 2025 · Apt 1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 9, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective siding at building north wall approximately 65 sq ft.
Apr 7, 2025
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at east wall in the 5th room from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 7, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass at backyard door in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Apr 7, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Apr 7, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling and north wall in the 1st bathroom from north located at apt 1, 1st story, 2nd apartment from west at north
Apr 7, 2025 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Apr 7, 2025 · Apt 1
Open — Nov certified late - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Apr 7, 2025 · Apt 1
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Apr 7, 2025 · Apt 1
Closed — Violation closed
DOB building violations
No DOB violations on record
ECB violations
7 ECB violations, newest first.
- Class - 2
Work with-out permit. at time of inspection observed 2 story 2 family dwelling cellar erected full height partition walls giving rise to 2 rooms and 1 room for 3-piece bathroom. no permit on file for scope of w
Sep 9, 2025
Resolve - Class - 1
Work-without permit. at time of inspection, observed 2 story building 2 family dwelling, cellar illegal 3-piece plumbing, supply water line and water waste lines, connection rough-in for water closet, washbasin
Sep 9, 2025
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o or building dept records. at time of inspection observed 2 story building 2 family dwelling, cellar set up and arrange for sleeping with bed and personal items.,
Sep 9, 2025 · Penalty $1,250
Active - Class - 2
Occupancy contrary to that allowed by cofo and/or the department of buildings records.partition erected creating rooms for living at cellar bathroom present.complete with walk closet,wash basin and shower stall
Jul 17, 2025 · Penalty $1,280
Active - Non-hazardous
Work without a permit work noted at side of house 22 x 10' x 5 wood shed & one 7'x 8'x 6 metal shed with concrete foundation .remedy:obtain a permit if feasible or restore to prior legal use & or condition
Aug 1, 2005 · Penalty $500
Active - Hazardous
Work without a permit hazardous work noted wood frame plywood surfaced shed meas 13' w x 11' l =143 sq ft built on east proeprty line without permit this unprofessionally amateurishly built combustible shed is
Mar 31, 2005
Resolve - Hazardous
Work without a permit hazardous work noted newly constructed wood frame plywood surfaced shed with 2x6' shed roof meas approx 12'x 12' x 10'high is not only to large to build without permit it is also right
Dec 9, 2004
Resolve