327 Bay Ridge Parkway
Brooklyn, NY 11209BBL 3-05929-0072Map
Owner of record: Davlatov, Amirjon
327 Bay Ridge Parkway is a two-family home built in 1901 in Brooklyn, 11209. It has 2 residential units across 2.75 floors. The owner of record is Davlatov, Amirjon. HPD has recorded 14 housing violations here, most recently on November 24, 2025. 1 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 1
- ECB violations
- 4
- HPD complaints
- 33
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2fl, 2nd story
Oct 18, 2013 · Apt 2FL
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Oct 18, 2013 · Apt 2FL
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Oct 18, 2013 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Jun 26, 2013 · Apt 2FL
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures .. in the kitchen located at apt 2fl, 2nd story
Jun 26, 2013 · Apt 2FL
Closed — Violation closed - BHazardous
Properly secure the loose balustrad at public hall stairs, 2nd story
Jun 26, 2013
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1fl, 1st story
Jul 25, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 1fl, 1st story
Jul 25, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1fl, 1st story
Jul 25, 2012 · Apt 1FL
Closed — Violation closed
Show 4 more ↓
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 1fl, 1st story
Jul 25, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective tin ceiling in the kitchen located at apt 1fl, 1st story
Jul 25, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1fl, 1st story
Jul 25, 2012 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylander key opperated lock building entrance door at public hall, 1st story
Jul 25, 2012
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Dob violation issued for building front porch at exposure 1 column in disrepair at the porch. at time of inspection observed at expopsure 1 a column having cracks, out of alignment, and a rotten foundation.column is supporting a balcony above and is uneven at the ground floor on the verge of collapsing.
Nov 20, 2023
Dob violation - dismissed
ECB violations · 4
- Class - 3
For failure to maintain building in code-compliant manner. at time of inspection, observed at front of property, black suv lic pl (lea-1956) jump the sidewalk to drive unto an illegal off-street accessory parki
May 21, 2024
Resolve - Class - 2
Job site fence not constructed at time of inspection, observed construction work being done on facade, new windows, removal of siding, new front deck with new roof and floors and additional work under permit #
Mar 12, 2024 · Penalty $2,500
Resolve - Class - 2
Violation issued for faillure to maintain observed wood frame visibily warped. column at porch in disrepairat expo 1, porch is cracking with small holes throughout. in addtion, observed failure to maintain cond
Nov 20, 2023
Resolve - Class - 3
Sec.zr25-62 zoning non conforming noted parked passenger vehicle (model gmc (plate cvl 2742 ny) at front yard of property less than 18ft deep and located not in side lot ribbon as required per section 25-621
Oct 16, 2008
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 14, 2023 · Apt 12FAMI
Close - Heat/hot water
Apartment only
Dec 3, 2022 · Apt TOPFLO
Close - Plumbing
Water supply
Feb 15, 2022 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Mar 13, 2019 · Apt 1FL
Close - Unsanitary condition
Mold
Mar 13, 2019 · Apt 1FL
Close - Safety
Smoke detector
Mar 13, 2019 · Apt 1FL
Close - Unsanitary condition
Pests
Mar 13, 2019 · Apt 1FL
Close - Safety
Carbon monoxide detector
Mar 13, 2019 · Apt 1FL
Close - Heating
Heat related
Oct 15, 2013 · Apt 2FL
Close - Heating
Heat related
Oct 9, 2013 · Apt NA
Close
Show 23 more ↓
- General
Cooking gas
Oct 9, 2013 · Apt 2FL
Close - Plumbing
Water supply
Jun 27, 2013 · Apt 2
Close - Appliance
Electric/gas range
Jun 27, 2013 · Apt 2
Close - General
Cooking gas
Jun 27, 2013 · Apt 2FL
Close - Heating
Heat related
Jun 27, 2013 · Apt 2FL
Close - Heating
Heat related
Jun 27, 2013 · Apt 2FL
Close - Plumbing
Water-leaks
Jul 19, 2012 · Apt 1FL
Close - Plumbing
Water-leaks
Jul 19, 2012 · Apt 1FL
Close - Plumbing
Water-leaks
Nov 9, 2006 · Apt 1
Close - Plumbing
Basin/sink
Nov 9, 2006 · Apt 1
Close - General
Doors
Nov 9, 2006 · Apt 1
Close - General
Windows
Nov 9, 2006 · Apt 1
Close - Plumbing
Water supply
Nov 9, 2006 · Apt 1
Close - Heating
Heat related
Nov 9, 2006 · Apt 1
Close - Plumbing
Basin/sink
Nov 2, 2006 · Apt 1FLR
Close - Plumbing
Basin/sink
Nov 2, 2006 · Apt 1FLR
Close - General
Doors
Nov 2, 2006 · Apt 1FLR
Close - General
Windows
Nov 2, 2006 · Apt 1FLR
Close - Heating
Heat related
Nov 2, 2006 · Apt 1FLR
Close - Heating
Heat related
Oct 30, 2006 · Apt 1FLR
Close - Heating
Heat related
Oct 27, 2006 · Apt 2FL
Close - General
Cooking gas
May 11, 2006 · Apt 2FL
Close - Heating
Heat related
May 11, 2006 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1901
- Floors
- 2.75
- Residential units
- 2
- Building area
- 2,558 ft²
- Lot area
- 2,507 ft²
- Zoning
- R5B
- Community board
- 310
- Council district
- 47
- Block / lot
- 5929 / 72
- Assessed value
- $99,300
- Landmark / historic district
- No
HPD registration #825713, last renewed Feb 27, 2025.
Questions about 327 Bay Ridge Parkway
Who owns 327 Bay Ridge Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Davlatov, Amirjon.
Does 327 Bay Ridge Parkway have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 327 Bay Ridge Parkway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 327 Bay Ridge Parkway built?
City records list 1901 as the year it was built.
How many apartments are in 327 Bay Ridge Parkway?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.