roofy

Violations at 229 65 Street

Brooklyn, NY 11220 · BBL 3-05816-0065 · Back to the property

HPD housing violations

The newest 50 of 210 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceilings at all stories at public hall

    Sep 4, 2026

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of household items at all stories at public hall

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint or post a sign indicating floors missing and or near fire stairs at all stories at public hall

    Sep 4, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door at west at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Sep 4, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story

    Sep 4, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective concrete saddle at building entrance door , 1st story

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story

    Sep 4, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective masonry stucco at east exterior wall at all stories

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective masonry stucco at north exterior wall at all stories

    Sep 4, 2026

    Open — Nov sent out
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd and 2nd story balconies at fire escape at east

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, members, and balconies at fire escape at east

    Sep 4, 2026

    Open — Nov sent out
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd and 2nd story balconies at fire escape at building front

    Sep 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, members, and balconies at fire escape at building front

    Sep 4, 2026

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the 5th room from north located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at all ceilings in the entire apartment located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Properly repair or replace the broken or defective lock and assembly at door in the entrance located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • BHazardous

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective counter balance of lower sash at 1st window from north at east in the 3rd room from north located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at . in the entire apartment located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Trace and repair the source and abate the visible mold condition... greater than 30 sq ft observed at ceiling in the bathroom located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt r2, 2nd story, 1st apartment from north at east

    Sep 4, 2026 · Apt R2

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Open — Info nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at vestbule door at public hall, 1st story

    Jul 1, 2025

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door

    Jul 1, 2025

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 6, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Apr 14, 2025

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of baby carriage, at public hall, 1st story

    Apr 14, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 14, 2025

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2024

    Open — Info nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective locking device at vestibule entrance door at public hall, 1st story

    Oct 24, 2024

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at building entrance door, latch , 1st story

    Oct 24, 2024

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Oct 24, 2024

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 24, 2024

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective latch at building entrance door , 1st story

    Oct 24, 2024

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Apr 16, 2024 · Apt 3F

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Apr 16, 2024 · Apt 3F

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective counter balance lower sash window in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from south at west

    Apr 16, 2024 · Apt 3F

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 3f, 3rd story, 1st apartment from south at west

    Apr 16, 2024 · Apt 3F

    Open — Nov sent out

DOB building violations

13 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 23, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations

1 ECB violations, newest first.

  • Non-hazardous

    4b-49- 49 no relief valve on hot watercoil

    Jul 31, 1998 · Penalty $400

    Resolve