6128 8 Avenue is a garage / gas station in Brooklyn, 11220. The owner of record is Twrlr Tower LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 19
- ECB violations
- 38
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 19
- Construction other optional
Ftc-vio#072125ceu31012pw(#3a22465)ordered twrlr tower llc to have eor review non-conformance of concrete testing procedure & submit s&s acceptance statement w/ alt testing results by 9/12/25.as of 6/15/26, twrlr tower llc has not complied with commissioner's order.remedy: comply w/ commissioner's order & code
Jun 16, 2026
Dob violation - active - Construction other optional
Emergency work-formwork failure occured on active const site @ 1fl level injuring 4 workers. immed retain a nys lic pe w/formwork/shoring experience to inspect entrie in place formwork system & provide stab report to ceu. install additional shoring/bracing if necessary under pe supervision pe to provide detailed procedure for the safe stab
Oct 28, 2025
Dob violation - dismissed - Construction other optional
Failure to perform standard-curing specimens: during lab inspection @ hrf on 7/1/2025, dob observed dry cylinders stored improperly, not meeting final curing requirements. remedy:.comply with codes and astm submit eor-approved alternate results by 09/12/2025
Jul 21, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed - Construction other optional
Stop all work immediately and make site safe contact the borough comm office at 718 802-3677
Oct 25, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 38
- Class - 1
Miscellaneous violations.bc 3303.3 atoi of a 28 story nb at roof,building approximately 132329 sq f site closed and there were no construction activities.upon shouting at perimeter and banging on fence and door
Sep 27, 2026 · Penalty $5,000
Active - Class - 2
Failure to safeguard the public and property affected by construction operations.at time of inspection,observed the jobsite was not adequately secured,with an unprotected and readily accessible opening providin
Sep 27, 2026 · Penalty $5,000
Active - Class - 1
At the time of inspection of an 15rcny 20-04 28-story new building and active job site, a fire hydrant was observed in use without backflow prevention. this condition poses a hazard to the public water supply
Aug 21, 2026 · Penalty $2,500
Resolve - Class - 1
Bc-3305.3.6.1.2. failure to secure re-shores in proximity to unenclosed perimeters.-as noted: at the time of inspection of a 28 story new building actively installed formworks for roof floor concrete slab; i ob
Aug 20, 2026 · Penalty $2,500
Active - Class - 2
At the time of my inspection of a 28-story new building, debris was observed throughout the site, including the 26th, 27th, and 28th floors. this condition creates a hazard to workers, the public, and property,
Aug 19, 2026
Resolve - Class - 2
Bc 3308.6.1.4 28-story new building, protective scaffold at exp# 1 was observed incomplete, with a section approximately 4 floors below the working deck. this condition creates a hazard to public and property.
Aug 16, 2026 · Penalty $2,500
Resolve - Class - 2
28 story nb inactive jobsite, with a building footprint, (sq. ft.)132329 walk perimeters, knock & called out, i observed no competent watch personnel as per bc 3303.7.7.6 a watchperson requirements of section 3
Aug 16, 2026 · Penalty $2,500
Active - Class - 2
Bc 330.1.1.3 i observed yodock system in place with missing interlocking couplers throughout, and not fill with water/sand which poses a potential hazard by allowing unintended movement of the barriers increas
Aug 16, 2026 · Penalty $1,250
Resolve - Class - 2
Bc 3307.2 at inspection of a 28-story new building, a concrete washout box was observed in a storage zone at exp#1, with fencing missing and unrestricted public access. this creates a hazardous condition to pub
Aug 16, 2026 · Penalty $2,500
Resolve - Class - 2
Work does not conform to plans. at time of inspection, approved dob energy and architectural drawings calls out window type w-01r to have u-value of .27 operable and .26 fixed. upon inspection, windows that are
Jul 10, 2026
Resolve
Show 28 more ↓
- Class - 2
Work without a permit. at time of inspection, observed mechanical work being performed without ms pw2 filed on dob system., obtain all permits; please submit permit to [email protected]
Jun 26, 2026 · Penalty $1,250
Resolve - Class - 2
(3301.1.2) at time of inspection observed 28 story major building with ongoing work. when asked for the fire safety manager as required by nyc fire code (1408.1) there was none on site . site safety manager lic
Jun 14, 2026 · Penalty $2,500
Resolve - Class - 1
. a worker fell from an opening while covering copper hvac pipes on the 9th floor of a 28-story nb site. permit holder, job no.b00754062-i1-gc, failed to submit report within 3 business days of required 16 item
Jun 4, 2026 · Penalty $10,000
Resolve - Class - 1
Bc 3306.9.10.3. responding to an incident where a worker fell from an opening at the 9 fl to the 8 fl while covering hvac pipes. the floor opening cover was not adequately secured against displacement, causing
May 26, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection, observed sidewalk shed installed at exp 1 & 4; however, sidewalk shed was not maintained as required by code. observed missing high-visibility markings at the gate entrance(bc3307.6.4.4)
May 23, 2026 · Penalty $2,400
Resolve - Class - 2
Bc 3303.3. atoi of a 28 story new building at roof, building approximately 132329 sq f. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert wat
May 23, 2026 · Penalty $2,500
Active - Class - 2
At time of inspection, observed equipment stored in the public roadway adjacent to the job site sidewalk shed and covered with a solid tarp, affecting public visibility and not in compliance with building code
May 23, 2026 · Penalty $2,500
Resolve - Class - 2
No en drawing drawing approved from dob provided on the job site at the time of inspection., maintain/display required documents; please submit drawings via email to [email protected]
Feb 25, 2026
Resolve - Class - 2
Bc3303.3.atoi of a 28 story new building at roof, building approximately 132329 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to aler
Jan 24, 2026 · Penalty $2,500
Resolve - Class - 1
Responding to an incident in which a worker fell on the ground at the cellar level of the job site on january 7, 2026, between approximately 9:00 a.m. and 10:00 a.m. the department of buildings was notified of
Jan 8, 2026
Resolve - Class - 2
Bc 3301.1.3: at the time of my inspection, i observed yodock barrier systems installed with missing interlocking couplers throughout and not filled with water or sand. these conditions create a potential hazard
Jan 4, 2026 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.as noted:observed major formwork failure at 1st floor level where 4 workers were injured.upon review of formwork and shorings
Oct 28, 2025 · Penalty $12,500
Resolve - Class - 1
At the time of my inspection of a 28 story new building at foundation phase, i observed site safety orientation for 4 workers that fell from decking have no address on there site safety orientation to certify t
Oct 28, 2025
Resolve - Class - 2
At the time of my inspection of a 28 story building at foundation, responding to an incident that workers fell from decking. investigation reveal that workers were pouring concrete on decking when it collapsed,
Oct 28, 2025 · Penalty $5,000
Resolve - Class - 2
At the time of my inspection of a 28 story building at foundation phase, responding to an incident that workers fell from decking. investigation reveal that workers was pouring concrete on decking when it colla
Oct 28, 2025 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 28 story new building at foundation phase, i observed at exposure #1 a ramp leading to jobsite, upon review of the site safety plan it reveal that the ramp should have timber c
Oct 28, 2025 · Penalty $2,500
Resolve - Class - 2
At the time of my inspection of a 28 story new building at foundation phase, i observed at exposure #1 concrete pump tower installed. upon review of the department records it reveal that the concrete pump tower
Oct 28, 2025 · Penalty $625
Resolve - Class - 1
At time of inspection upon reviewing previous complaint# 3a24274 issued 08/05/2025. gc fail to comply with the commissioner's order and also no corrective measures on record for violation# 39543266l.
Oct 22, 2025
Resolve - Class - 1
Observed a nb super structure in the phase of concrete pouring. sub cellar and cellar was completed. workers currently pouring the 1st floor. upon checking department records nb permit b00754062 is not active.
Aug 5, 2025
Resolve - Class - 1
Excavation earth work foundation in conjuntion with new building b00753962. observed active site excavation in progres piles has been placed rakers and tie back iin progress at exposure 1 wallers instaled upon
Jul 15, 2025 · Penalty $2,500
Resolve - Class - 1
Bc 3309.9 weatherproof integrity of adjoining buildings, observed excavation operations next to adjoining building exp#2, where exterior wall exposed and open to elements due to construction operations, no weat
Mar 7, 2025 · Penalty $5,000
Resolve - Class - 1
Bc 3304.4.4 guardrail system. observed missing guardrail system and missing solid enclosure at multiple locations throughout the site at sides of excavations and ramp used by workers and equipment. this condit
Mar 7, 2025 · Penalty $5,000
Resolve - Class - 1
Observed construction equipment compressor, excavator bucket and other equipment stored by leading edge of excavation soil ramp and not secured safeguarded to prevent dislodgement by wind, vibration, accidental
Mar 7, 2025 · Penalty $6,250
Resolve - Class - 1
Observed active support of excavation operations at multiple locations, upon review the department records ( bis & dob now) observed support of excavation permit# b00754062-se filling number s1&s7 is only appr
Mar 7, 2025 · Penalty $6,250
Resolve - Class - 2
Atoi observed creation of new partitions throught basement level., obtain all permits
Jan 23, 2025
Resolve - Class - 1
Atoi observed new electrical installation including new panel, outlets and switches. no permit on file with dob, obtain permit
Jan 23, 2025 · Penalty $800
Resolve - Class - 2
At time of inspection observed at exp#1 section of construction fence missing/damaged and construction site accessible for public. yodok on public sidewalk.; bc3301.2, comply with code
Jan 19, 2025 · Penalty $5,000
Resolve - Class - 1
Demolition work without required demolition permit.noted:i observed attime of inspection,both buildings on lot to have been taken down.the site has been graded & the constuction fence taken down and the site is
Oct 10, 2017 · Penalty $12,000
Resolve
Complaints
- Plumbing
Water-leaks
Nov 12, 2007 · Apt 1F
Close - Plumbing
Basin/sink
Nov 12, 2007 · Apt 1F
Close - Nonconst
Vermin
Nov 12, 2007 · Apt 1F
Close - Nonconst
Vermin
Nov 12, 2007 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Garage / gas station (G7)
- Year built
- —
- Floors
- —
- Residential units
- —
- Building area
- —
- Lot area
- 160,700 ft²
- Zoning
- C4-2
- Community board
- 307
- Council district
- 38
- Block / lot
- 5794 / 75
- Assessed value
- $5,549,400
- Landmark / historic district
- No
Questions about 6128 8 Avenue
Who owns 6128 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Twrlr Tower LLC.
Does 6128 8 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 6128 8 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.