Violations at 315 61 Street
Brooklyn, NY 11220 · BBL 3-05781-0062 · Back to the property
HPD housing violations
32 HPD violations, newest first.
- BHazardous
Remove the illegal fastening gate with hasp and padlock at 2nd fire passage way from east at south
Nov 15, 2025
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling consiting of sheetrock and studs subdiving room in the 1st room from north located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchen located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall and west wall in the bathroom located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt d5, 4th story, 2nd apartment from north at east
Nov 15, 2025 · Apt D5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at vestibule floor at public hall, 1st story
Jun 14, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble at vestibule east wall at public hall, 1st story
Jun 14, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling at vestibule at public hall, 1st story
Jun 14, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire rated walls and ceiling at vestibule at public hall, 1st story
Jun 14, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 14, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household articles at south stack building front. all stories at fire escape
Jun 14, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the entire apartment located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile and grout in the bathroom located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock assembly in the bathroom located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at west wall in the bathroom located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balance at top and bottom window sash in the 1st room from east located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balance at top and bottom window sash in the kitchen located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balance at top and bottom window sash in the 4th room from east located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at east wall in the 4th room from east located at apt b5, 2nd story, 2nd apartment from west at north
Jan 30, 2010 · Apt B5
Open — Nov sent out - BHazardous
Replace with new the broken or defective window glass at lower window sash in the kitchen located at apt b5, 2nd story, 2nd apartment from west at north
May 28, 2008 · Apt B5
Open — Nov sent out - BHazardous
Properly repair the broken or defective intercom system from 1 sty vestibule in the entire apartment located at apt b5, 2nd story, 2nd apartment from west at north
May 28, 2008 · Apt B5
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt b5, 2nd story, 2nd apartment from west at north
May 28, 2008 · Apt B5
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt b5, 2nd story, 2nd apartment from west at north
May 28, 2008 · Apt B5
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of sagging wood floor private hall at entrance to bathroom 1 sty apt a5 located at apt a5, 1st story, section '' ''
Nov 10, 1999 · Apt A5
Open — First no access to re- inspect violation - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling private hall 3 sty southeast apt 1c er1 3371421. located at apt 1c
Dec 2, 1991 · Apt 1C
Open — Defect letter issued - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint wall at northwest room & private hall 3 sty southeast apt er1 3371421.
Dec 2, 1991
Open — Defect letter issued - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling & walls east room 3 sty southeast apt 1c galarza no phone er1 3371421. located at apt 1c
Dec 2, 1991 · Apt 1C
Open — Defect letter issued - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective plasterboard clg cellar thru out.
Apr 11, 1989
Open — Nov sent out
DOB building violations
8 DOB violations, newest first.
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations
19 ECB violations, newest first.
- Class - 1
Failure to comply with commissioner's order to obtain work permit., comply with commissioner's order
Oct 20, 2025 · Penalty $2,500
Resolve - Class - 1
Work without permit. at time of inspection, observed newly erected cmu retaining wall at rear of the property erected without a permit, to correct violating condition for violation # 35478081l issued 7.29/2020
Jun 9, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances.(rxterior). note: observed during inspection a retaining wall approx 78ft x 7-5ft high,bulging & crack in sections. wall at the rear of subject premises appears
Jul 29, 2020 · Penalty $2,500
Resolve - Class - 1
Outdoor advertising company failure to obtain oac registration number while engaging in the outdoor advertising business. (the mirvis firm pc, strazzullo law firm) remedy: remove illegal sign/register
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Zr 42-55 outdoor advertising company failure to register sign within 900 feet and within view of an arterial highway-gowanus expressway (strazzullo law firm) remedy: remove illegal sign
Nov 14, 2018
Resolve - Class - 1
Zr 42-55 outdoor advertising company failure to register sign within 900 feet and within view of an arterial highway-gowanus expressway (themirvis firm pc) remedy: remove illegal sign
Nov 14, 2018
Resolve - Class - 1
Outdoor advertising company sign does not bear a decal bearing ul classification mark or date of sign's erection. (strazzullo law firm) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company sign does not bear a decal bearing ul classification mark or date of sign's erection. (the mirvis firm pc) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company failure to have licensed sign hanger attach or erect sign. (strazzullo law firm) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company failure to have licensed sign hanger attach or erect sign. (the mirvis firm pc) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company sign prohibited in r zone. (strazzullo lawfirm) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company sign prohibited in r zone. (the mirvis firm pc) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company sign on display without a permit. (strazzullo law firm) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company sign on display without a permit. (the mirvis firm pc) remedy: remove illegal sign
Nov 14, 2018 · Penalty $5,000
Resolve - Hazardous
Illegal use in a residential district.three unlicensed junk cars parked at n/w side of the bldg.remedy:discontinue illegal use
Oct 2, 2003
Resolve - Non-hazardous
Having more than one sign for each use building dwelling unit. remedy; remove illegal signage.
Feb 26, 2003
Resolve - Non-hazardous
Having a sign extending above the ground floor ceiling (or more than 20 ft above the curb level which ever is less) remedy: remove illegal signage.
Feb 26, 2003
Resolve - Non-hazardous
Having a prohibited advertising sign in r-6 district. remedy; remove illegal signage.
Feb 26, 2003
Resolve - Non-hazardous
Having installed signs without a permit. remedy: remove illegal work.
Feb 26, 2003
Resolve