Violations at 6024 4 Avenue
Brooklyn, NY 11220 · BBL 3-05781-0041 · Back to the property
HPD housing violations
The newest 50 of 419 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Apr 4, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Apr 4, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Apr 4, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at north wall in the bathroom located at apt 4c, 4th story, 1st apartment from south at west
Jan 5, 2026 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at second story landing at public hall stairs
Apr 13, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall second story landing at public hall stairs
Apr 13, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall third story landing at public hall stairs
Apr 13, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall third story landing at public hall stairs
Apr 13, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Apr 3, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Apr 3, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Feb 7, 2024 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Jan 18, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Jan 18, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock in the entrance located at apt 4a, 4th story, 1st apartment from north at east
Jan 18, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 4a, 4th story, 1st apartment from north at east
Jan 18, 2024 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening padlock at building front at fire passage way
Dec 1, 2023
Closed — Violation closed - BHazardous
Properly secure the loose and hung electric lighting fixture at east wall, at public hall, 1st story
Nov 14, 2023
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees at all hotwater fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Oct 14, 2023 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at vestibule door at public hall, 1st story
Oct 11, 2023
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from east at north located at apt 2b, 2nd story, 2nd apartment from north at east
Apr 28, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Mar 28, 2023 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Mar 28, 2023 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Dec 26, 2022 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from east located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at upper and lower window sash in the 3rd room from east at south located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Open — Not complied with - BHazardous
Properly secure the loose upper cabinet at west wall in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling around steam riser in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at upper and lower window sash in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at upper and lower window sash in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective subflooring wood in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Nov 14, 2022 · Apt 3D
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Nov 9, 2022 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 2e, 2nd story, 2nd apartment from west at north
Oct 20, 2022 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 3a, 3rd story, 1st apartment from east at south
Oct 20, 2022 · Apt 3A
Open — Not complied with - BHazardous
Replace with new the missing escuthcheon plate at ceiling over steam pipe in the 2nd room from north at east located at apt 3a, 3rd story, 1st apartment from east at south
Oct 20, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Replace with new the missing escuthcheon plate at ceiling over steam riser in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from east at south
Oct 20, 2022 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor under radiator in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from east at south
Oct 20, 2022 · Apt 3A
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ,milk crate , 2nd story
Sep 29, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead door at public hall stairs, 4th story
Sep 29, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate around steam riser at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate around steam riser at ceiling in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Open — Not complied with - BHazardous
Replace with new the missing escutcheon plate around steam riser at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2022 · Apt 3A
Closed — Violation closed
DOB building violations
8 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations
2 ECB violations, newest first.
- Class - 2
Premises 4-story masonry frame mixed use corner building. observed excessive construction debris stored / piled in rear yard passage way at expo # 03 which creating odor & unsafe condition to tenant., maintain
May 29, 2020 · Penalty $1,280
Active - Class - 2
Illegal use in residential district. defects noted: sideyard parking vehicle w/o plate dead storage. remedy: discontinue illegal use.
Feb 8, 2017
Resolve