Owner of record: 62nd Street Development LLC
1463 15 Avenue is a warehouse built in 2025 in Brooklyn, 11219. The owner of record is 62nd Street Development LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 24
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 24
- Class - 1
Failure to institute/maintain safety equipment measures or temporary construction.no guardrails.as noted:at time of inspection on an active construction site 2 story new building completed to bulkhead.observed
Mar 20, 2026 · Penalty $25,000
Active - Class - 2
Failure to maintain/display onsite documents required by bc chapter 33as noted at time of inspection on an active construction site 2 story new building completed to bulkhead.observed at 1st floor cmu block mea
Mar 20, 2026 · Penalty $6,250
Active - Class - 2
Construction superintendent failed to perform duties per code.as notedat time of inspection on an active construction site 2 story building structural completed to bulkhead.observed that the superintendent fail
Mar 20, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection observed construction fence installed at all exposures. construction fence at exp# 1 attached gate approx.. 4ft which code requires minimum of 8ft creating unauthorized access for public i
Feb 13, 2026 · Penalty $1,000
Resolve - Class - 1
At time of inspection observed unsecured flammable canisters not stored as per code stop all storage of oxygen compressed, acetylene and liquid gases on site
Feb 13, 2026 · Penalty $2,500
Resolve - Class - 2
Bc3301.1.2 at time of inspection observed flammable fuel stored on site. upon request no fdny permit. stop all flammable fuel storage on site obtain fdny permit.
Feb 13, 2026 · Penalty $2,500
Resolve - Class - 2
Observed jersey barriers at exp#1 #2 not as per manufactures specification. jersey barriers not continuously interlocked fill with water/sand which poses a potential hazard by allowing unintended movement of t
Feb 13, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed temporary pedestrian walkway / pathway exp#1 and #2. a continuous clear path of at least 5ft was not provided as per building code 3307.2.6(1) which also does not conform to dot
Feb 13, 2026 · Penalty $2,400
Resolve - Class - 2
Atoi i observed no construction activity.site closed.i searched in dob system and observed that building footprint is 34421.and watchperson is not present as required by code-bc.3303.3. watchperson shall be all
Feb 8, 2026 · Penalty $2,530
Resolve - Class - 2
Failure to comply with manufacturer specification. observed plastic barriers at exp. 1 and exp. 2 not locked in place, not filled with water or sand not mark visible. this creates unsafe conditions for pedestri
Feb 8, 2026 · Penalty $1,280
Resolve
Show 14 more ↓
- Class - 1
Unlawful acts. failure to comply with commissioner's order. failure tofile a certificate of correction. atoi i observed accumulated construction debris outside construction fence @exp#2 of premises. the debris
Dec 19, 2025
Resolve - Class - 2
Respondent fail to comply with the commissioner order, violating condition was not corrected. no certificate of correction was file with department. violation # 039543437rcomply with the commissioner order, fil
Oct 7, 2025 · Penalty $1,280
Resolve - Class - 1
At time of inspection of a two-story new building, observed excessive amounts of construction debris throughout multiple locations of the jobsite, including the first floor, second floor, and rear yard. these c
Oct 3, 2025 · Penalty $2,500
Resolve - Class - 1
Worker slipped on deck injuring back. on the jobsite of a two story new building. permit holder job# b08016960-s2-gc-cx failed to submit report within 3 business days of required 16 items to code 28-103.21 pe
Sep 17, 2025 · Penalty $10,000
Resolve - Class - 2
2 story nb with a building footprint (sq. ft.)34421. observed no construction activity takin place at the time of inspection. i walked around the outside of the building to take my pictures banged on door and y
Aug 9, 2025 · Penalty $2,500
Resolve - Class - 1
Bc 3309.1 at the time of my inspection of a 3 story new building active jobsite 3 floor decking level, i observed that there were no overhead protection for workers entering jobsite, for office trailers and wor
Aug 7, 2025 · Penalty $5,000
Resolve - Class - 2
Gc fail to file certificate of correction with the dob. no corrective measures on record for violation#39540631r issued 05/24/25. also violating condition exist observed jersey barriers installed at exp# 1 2 no
Jul 18, 2025 · Penalty $3,125
Resolve - Class - 2
Atoi of a 2 story new building at roof, building approximately 34421 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert watchpers
May 24, 2025 · Penalty $2,500
Resolve - Class - 1
Atoi of a new 2 story building.observed: jersey barriers along the pedestrian walkway are not in compliance with the manufacturer's specs. barriers are not filled with water and several are damaged. this result
May 24, 2025 · Penalty $2,500
Resolve - Class - 2
Bc 3307.2. at time of inspection of a two story new building, inactive jobsite. observed man lift stored on the road way. upon reviewing the department records it was noted that there no permit on file for stor
May 24, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to comply with astur c31 standards for concrete over head testsample: as noted at time of my inspection at the above site, observed inadequate field storage clearing facility for monitoring the temperat
Mar 20, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to perform proper concrete washout procedures and collection and containment: as noted at time of inspection on an active construction site, observed concrete truck washout water at exposure #1 on a whe
Mar 20, 2025 · Penalty $2,500
Resolve - Class - 2
@ the time of inspection observed storage building structure requested en/arch plans not provided., maintain/display required documents; maint approved plans on site. https://www1.nyc.gov/site/buildings/codes/e
Jan 30, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to comply with dot stipulations-bc-3307.2.atoi i observed that contractor failure to maintain 5 foot clear protected pedestrian walkway in roadway at exp. # 1(15 avenue).also jersey barriers was not con
Oct 18, 2024 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Warehouse (E7)
- Year built
- 2025
- Floors
- —
- Residential units
- —
- Building area
- 32,441 ft²
- Lot area
- 29,235 ft²
- Zoning
- M1-1
- Community board
- 311
- Council district
- 43
- Block / lot
- 5727 / 46
- Assessed value
- $771,300
- Landmark / historic district
- No
Questions about 1463 15 Avenue
Who owns 1463 15 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 62nd Street Development LLC.
Does 1463 15 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 1463 15 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.