roofy

881 54 Street

Brooklyn, NY 11220BBL 3-05665-0043Map

Owner of record: 758 Realty LLC

881 54 Street is an elevator apartment building built in 1910 in Brooklyn, 11220. It has 10 residential units across 6 floors. The owner of record is 758 Realty LLC. HPD has recorded 15 housing violations here, most recently on June 6, 2025. 6 of the 15 most recent violations are still open.

HPD violations
15
DOB violations
4
ECB violations
17
HPD complaints
1

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 6, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 15

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 6, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 5, 2023

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 5, 2023

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story

    Jul 5, 2023

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Jul 5, 2023

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 5, 2023

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jul 5, 2023

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
Show 5 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 10, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 22, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 22, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 6, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 6, 2021

    Closed — Violation dismissed

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 4, 2020

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Construction other optional

    Borough comm. ordered all work stopped under permit#320744487 on 1/26/18 super of construction withdrew

    Jan 27, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 14, 2015

    Dob violation - dismissed

ECB violations · 17

  • Class - 2

    Electrical work without a permit on file with the dept of buildings at time of inspection observed four a.c split units installed with electrical disconnect boxes to provide power to units at the rear side of t

    May 14, 2026 · Penalty $1,250

    Active
  • Class - 1

    Bc 715.1. failure to comply with opening protectives. noted: in every floor from 1st floor to the 6th floor, fire door(fpsc) on the internalstaircase are locked conditions in case of emergency. also cable preve

    May 2, 2025 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per bc 1008.1(2014 code); 27-371; bc 1008.1.9(2014 code); bc 1018.1.8(2022 code); bc 1010.1.9(2022 code). noted: in

    May 2, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner: floor numberingsigns missing and/or defective per bc 1019.7(2008 code); 27-392; bc 1022.8(2014 code); bc 1023.9(2022 code). noted: in every floor, from 1st

    May 2, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply with opening protectives. noted: in every floor 1st floor to 6th floor, internal staircase fire doors(fpsc) condition, notin compliance with bc 715.1. remedy: comply with code.

    Apr 28, 2025 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. noted: at lobbyfront entry door hardware not working properly, blocking for several minutes the exit from the main means of egress. also passageway to the

    Jan 5, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Out of service. upon inspection, the device is found to be out-of-service remedy: restore to service immediately and, notify nycdob the device has been returned to service. e-mail [email protected] so an in

    Aug 22, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.noted:at the time of inspection observation was made at exp(4)of the front exterior five windows at basement level all broken with insulation as cover for

    Dec 4, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    3301.2 failure to safeguard public &property affected by construction operations.numerous nails were observed sticking out of construction facing sidewalk &fence to (interior) of adj house on 54 street.this con

    Oct 15, 2016

    Resolve
  • Class - 2

    Failure to provide required "project information panel"@jobsite.this is a 6stry alt 1job w.the last permit renewed on 7/27/15.rem:provide &post required "project info panel" @jobsite as per code.

    Oct 15, 2016

    Resolve
Show 7 more ↓
  • Class - 2

    Temporary construction equipment on site when expired permit a 8' highplywood construction fence has been erected &remains up @exp#1 &#4.thefn permit for this fence expired on 8/4/16(fn320744487).rem:renew perm

    Oct 15, 2016

    Resolve
  • Class - 2

    Sec. 3307.7.1 failure to provide adequate viewing panels. at time of inspection observed,job site not active. the viewing panels in the job site fence are missing plexiglass as required. the plexiglass prevents

    Jan 27, 2016

    Resolve
  • Class - 1

    Failure to safeguard all persons,public & property affected by construction operations. at time of inspection observed,job site not active. approx a 5 foot section of the job site fence is missing at exp#2,rear

    Jan 27, 2016 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide approved docs @site @time of insp.alt 1 const beingperformed under permitted app #320744487.approx 8 male workers @site.insp observed a copy of 4 pages of a 23 page (set) of plans.rem:make si

    Nov 30, 2015

    Resolve
  • Class - 1

    Failure to safeguard all person & property affected by const ops.approx 8 male workers @site performing various const task under permitted app #320744487.observed @time missing guard & handrails as well as toeb

    Nov 30, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all persons and property noted:at time of insp.4th fl in place with no sidewalk shed for pedestrians along public sidewalk with masonry construction ongoing.also adjoining 879, 54 street wi

    Jul 2, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide protection at sides of excavation. excavation in progress under app #320744487 observed approx 6'-7'0" pit on the edge ofa 1 sty concrete garage @ the exposure #3 of lot w/no proper shoring.

    Oct 23, 2014 · Penalty $2,400

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jul 4, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
1910
Floors
6
Residential units
10
Building area
12,300 ft²
Lot area
3,017 ft²
Zoning
R6
Community board
312
Council district
43
Block / lot
5665 / 43
Assessed value
$879,300
Landmark / historic district
No

HPD registration #388905, last renewed Oct 28, 2025.

Questions about 881 54 Street

Who owns 881 54 Street?

The owner of record in NYC Department of City Planning PLUTO data is 758 Realty LLC.

Does 881 54 Street have violations?

Yes. NYC HPD has recorded 15 housing violations at this property.

Is 881 54 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 881 54 Street built?

City records list 1910 as the year it was built.

How many apartments are in 881 54 Street?

It has 10 residential units and 12 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.