Violations at 5122 9 Avenue
Brooklyn, NY 11220 · BBL 3-05651-0046 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
6 DOB violations, newest first.
- Construction other optional
Due to the withdrawal of the construction superintendent of record the borough commissioners office has ordered all work under job 320993528 stopped until a new superintendent is in place as per article 116 of chapter 1 of title 28 of the a.c. kindly contact the commissioners office at 718 802-3677 in response to this letter.
Sep 13, 2022
Dob violation - dismissed - Construction other optional
Due to the withdrawal of the construction superintendent of record the borough commissioners office has ordered all work under job 320993528 stopped until a new superintendent is in place as per article 116 of chapter 1 of title 28 of the a.c. kindly contact the commissioners office at 718 802-3677 in response to this letter.
Sep 13, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 26, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 26, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed
ECB violations
13 ECB violations, newest first.
- Class - 1
Failure to provide sws where required.atoi i observed that theres no sws provided to protect public from any falling debris or materials.bldg final ht over40'&aprx8' from sw to structure.materials&debris had fa
Jan 31, 2022
Resolve - Class - 1
Unlawfully contd work while on notice of swo.atoi i observed parapet wall has been completed@exp2&4@roof level.jobsite was issued partial swo for all exterior work@exp2&4 roof level on3/1/21.when swo was issued
Jan 31, 2022 · Penalty $5,000
Resolve - Class - 2
Failure to safeguard all persons&property affected by const ops.atoi iobserved materials/debris had fallen from roof onto adjoining bldg roof,causing damages in multiple locations.permit holder failed to provid
Jan 31, 2022
Resolve - Class - 2
Temp const equipment permit expired-sws atoi of proposed 4stynb,no active work observed sws in place@exp1 after research in bis it came to my attn that permit expired.renew permit for sws.
Sep 8, 2021
Resolve - Class - 2
Temp const equipment onsite-permit expired-fence atoi of proposed 4stynb,observed const fence in place-per my research in bis,it came to my attn that permit for fence expired.renew permit for bldg code.
Sep 8, 2021 · Penalty $1,250
Resolve - Class - 2
Work without a permit at the time of my inspection of a 4 story nb at roof level i observed a temporary outrigger catch platform.work platform with wood guardrail system installed at exp #4 exterior all on 2nd
Mar 1, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain.display documents on site at the time of my inspection i observed makeshift temporary work platform installed on exterior wall at 2nd.3rd and 4th story level exp #2 platform constructed of m
Mar 1, 2021 · Penalty $6,250
Resolve - Class - 1
Bc3309.10=protection of roots at the time of my inspection of a 4 story nb currently at roof level active job site i observed exteiror work being done more than 48 inches above adjacent property roof at exp #2
Mar 1, 2021 · Penalty $6,250
Resolve - Class - 2
Sec. 3306.9.8.3 failure to remove glass prior to the commencement of demo. at the time of my inspection of a 2 sty demo of a house i observed from the outside of the site trhru the viewing panel. the glass door
Apr 23, 2019 · Penalty $620
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355300m issued on 09-28-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for bldg at the rear being w/o a roof. remedy: comply w/comm's
Feb 6, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/ vioaltion # 35355300m issued on 9/28/18and to file a certificate of correction pursuant to 28-20.1 and rcny 102-07 for having no roof at
Dec 28, 2018
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35355300m issued on 09/28/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for having no roof at the
Nov 17, 2018
Resolve - Class - 1
Failure to maintain building code compliant noted:at rear the one story yard extension entry hasno roof sheeting with exposed rafters allowing the elements to enter this demi attached building.comply with code-
Sep 28, 2018
Resolve