4721 New Utrecht Avenue
Brooklyn, NY 11219BBL 3-05627-0036Map
Owner of record: 4721 Nua LLC
4721 New Utrecht Avenue is an office building built in 1931 in Brooklyn, 11219. The owner of record is 4721 Nua LLC. HPD has recorded 27 housing violations here, most recently on February 7, 2005. 27 of the 27 most recent violations are still open.
- HPD violations
- 27
- DOB violations
- 14
- ECB violations
- 8
- HPD complaints
- 0
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 27
- CImmediately hazardous
Replace with new the broken or defective glass lite in street entrance door. er-1.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents rats thru/out 2nd. story apt. #1.
Feb 7, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches thru/out 2nd. sty. apt. 1.
Feb 7, 2005
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plaster wall and ceiling in 1st. story public hall and stairs.
Feb 7, 2005
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at kitchen sink in 2nd story apt. #1.
Feb 7, 2005
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in bathroom in 2nd. story apt. #1.
Feb 7, 2005
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling & walls in 1st. story public hall and stairs.
Feb 7, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of 1st. to 2nd. sty private hall stairs ceiling evidence of water leak.
Feb 7, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of 2nd. sty ceiling private hall evidence of water leak.
Feb 7, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires 1st. to 2nd. sty private hall stairs.
Feb 7, 2005
Open — Nov sent out
Show 17 more ↓
- BHazardous
Replace with new the broken or defective glass louvers on door leading to 2nd. sty. extension roof rear bldg.
Feb 7, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass pane on vestibule door.
Feb 7, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass pane on entrance door to bldg.
Feb 7, 2005
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceiling at cellar fire retarding material.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color 2nd. sty. apt. walls and ceilings thru/out.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures 2nd. sty. apt. all fixtures.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures 2nd. sty. apt. all fixtures
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at kitchen and bathroom in 2nd. story apt. #1. er-1
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom in 2nd. story apt. #1. er-1
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective suspended ceiling in southeast room in 2nd. story apt. #1. er-1.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom in 2nd. sty. apt. #1.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of exposed electrical wiring thru/out 2nd. story apt. er-1.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls thru/out 2nd. story apt. #1. er-1.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Fire escape defective. properly secure goose neck ladder from 2nd. sty. extension roof rear to main roof.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures 2nd. sty. all fixtures.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures kitchen sink and bathroom 2nd. sty. apt.
Feb 7, 2005
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen sink and bathroom 2nd. story apt.
Feb 7, 2005
Open — Nov sent out
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 12, 2021
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 8
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000076985n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
May 28, 2025 · Penalty $625
Active - Class - 2
Project information panel/sidewalk shed parapet panel.at time of inspection observed sidewalk shed in place at exp #1 sidewalk shed parapet project information panel not provided.remedy:comply with code provide
Oct 13, 2021
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no handrails.at time of inspection of an renovation and change in use from light manufacturing and residential to commercial off
Jul 14, 2021
Resolve - Class - 2
Document tobe kept on site.at time of inspection of an application is filed for the renovation and change in use from light manufacturing and residential to commercial office at the first & second floor conjuct
Jul 14, 2021
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33. at time of inspection at an active construction jobsite. i observed cold form steel on 1st & 2nd fl. also structural work in cellar. upon re
Feb 9, 2021
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. at time inspection at an active construction job site,i observed contractor making chances to structural beams & columns in the
Feb 9, 2021 · Penalty $1,280
Resolve - Class - 1
Sec. 3301.6 design drawings. at time of inspection at an active construction jobsite. i observed shoring in multiple places in the cellar that was holding up different ares of the 1st fl. upon requesting design
Feb 9, 2021 · Penalty $2,500
Resolve - Non-hazardous
36,49. 36-boiler not registered. 49-(bq9)(27-147)-slant fin boiler installed w/o work permit.
Oct 23, 1998 · Penalty $600
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O2)
- Year built
- 1931
- Floors
- 2
- Residential units
- —
- Building area
- 3,590 ft²
- Lot area
- 1,800 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 44
- Block / lot
- 5627 / 36
- Assessed value
- $328,950
- Landmark / historic district
- No
Questions about 4721 New Utrecht Avenue
Who owns 4721 New Utrecht Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 4721 Nua LLC.
Does 4721 New Utrecht Avenue have violations?
Yes. NYC HPD has recorded 27 housing violations at this property.
Is 4721 New Utrecht Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4721 New Utrecht Avenue built?
City records list 1931 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.