Violations at 4724 New Utrecht Avenue
Brooklyn, NY 11219 · BBL 3-05627-0023 · Back to the property
HPD housing violations
21 HPD violations, newest first.
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures sink in the kitchen located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures sink in the kitchen located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at base of bowl in the bathroom located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2f, 2nd story
Oct 20, 2016 · Apt 2F
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 20, 2016
Open — Info nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story
Oct 18, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the kitchen located at apt 2f, 2nd story
Oct 18, 2016 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 2f, 2nd story
Oct 18, 2016 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 2f, 2nd story
Oct 18, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures .. in the kitchen located at apt 2f, 2nd story
Oct 18, 2016 · Apt 2F
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures .. in the kitchen located at apt 2f, 2nd story
Oct 18, 2016 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 2f, 2nd story
Oct 18, 2016 · Apt 2F
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Dec 8, 2009 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 2fl, 2nd story
Dec 8, 2009 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2fl, 2nd story, apartment at south
Dec 8, 2009 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing glass pane on vestibule door at lobby, 1st story
Dec 10, 2008
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination ... at lobby, 2nd story
Dec 10, 2008
Open — Nov sent out
DOB building violations
3 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Non-hazardous
Flame coming out of burner mount need to be sealed
Aug 29, 1990
Resolve