roofy

Violations at 1114 47 Street

Brooklyn, NY 11219 · BBL 3-05627-0012 · Back to the property

HPD housing violations

32 HPD violations, newest first.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    May 22, 2026 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south

    May 22, 2026 · Apt 2L

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2l, 2nd story, 1st apartment from east at south

    May 22, 2026 · Apt 2L

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    May 17, 2026 · Apt 2L

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from east at south

    May 17, 2026 · Apt 2L

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    May 17, 2026 · Apt 2L

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    M/d law abate the nuisance consisting of heat on summer tembreture found 84 degrees by thermometer #7222 in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    May 17, 2026 · Apt 2L

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 2l, 2nd story, 1st apartment from east at south

    May 3, 2026 · Apt 2L

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    May 3, 2026 · Apt 2L

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    May 3, 2026 · Apt 2L

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Apr 22, 2026

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing. at public hall, 1st story

    Sep 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing electrical light fixtures at ceiling at public hall, 3rd story

    Sep 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling at public hall, 3rd story

    Sep 5, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling at 1st public hall bulkhead from north, 3rd story

    Sep 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at 1st public hall bulkhead from north, 3rd story

    Sep 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak over ceiling at 1st public hall bulkhead from north, 3rd story

    Sep 5, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove device preventing door from being self-closing consisting of metal lifting weight at 1st public hall bulkhead from north, 3rd story

    Sep 5, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at 1st public hall bulkhead from north, 3rd story

    Sep 5, 2025

    Closed — Violation closed
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the roof

    Sep 5, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 5, 2025 · Apt 2L

    Open — Notice of issuance sent to tenant
  • BHazardous

    M/d law abate the nuisance consisting of wood panels installed at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 5, 2025 · Apt 2L

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south

    Sep 5, 2025 · Apt 2L

    Closed — Violation closed
  • CImmediately hazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the mixed use garbage of household and construction materials (approx. 4 cubic yards ) at building front at front areaway, 1st story

    Jun 24, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 22, 2022

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 15, 2018

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2016

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair the broken or defective lock mechanism at door at building entrance , 1st story

    Apr 9, 2014

    Open — Nov sent out
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present

    Feb 23, 2014

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from east at south

    Feb 20, 2011 · Apt 2R

    Open — Not complied with
  • BHazardous

    Arrange and make self-closing the doors ... in the entrance located at apt 1r, 1st story, 2nd apartment from south at west

    Dec 15, 2009 · Apt 1R

    Open — Not complied with

DOB building violations

9 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boiler boiler optional

    36

    Aug 24, 1990

    Vp-violation unserved ecb-active

ECB violations

5 ECB violations, newest first.

  • Hazardous

    Failure to maintain. defect is cracked and leaning storage shed masonry block wall at cellar rear. rotted and defective floor joints at cellar rear under first floor, rear apartment toilet. missing sections of

    Nov 9, 1998 · Penalty $800

    Active
  • Hazardous

    4,18-b,36

    Aug 13, 1991

    Resolve
  • Hazardous

    4,18-b,36

    Aug 13, 1991

    Resolve
  • Unknown

    36 - boiler not registered.

    Aug 24, 1990 · Penalty $125

    Active
  • Unknown

    36 - boiler not registered.

    Aug 24, 1990 · Penalty $125

    Active