Violations at 1310 46 Street
Brooklyn, NY 11219 · BBL 3-05623-0011 · Back to the property
HPD housing violations
10 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 6, 2015
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors entrance to cellar.
Aug 9, 1989
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective gypsum block wall cellar entrance.
Aug 9, 1989
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal ceiling boiler room cellar.
Aug 9, 1989
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance to 2 sty apt.
Aug 9, 1989
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective plaster ceiling cellar stairs.
Aug 9, 1989
Closed — Violation closed - BHazardous
D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar thru out.
Aug 9, 1989
Closed — Violation closed - CImmediately hazardous
D26-10.01 adm code properly repair with similar material the broken or defective plasterboard ceiling cellar front & rear.
Aug 9, 1989
Closed — Violation closed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration cement & block porch erected rear yard.
Aug 9, 1989
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code properly repair the broken or defective paving entrance side north court.
Aug 9, 1989
Closed — Violation closed
DOB building violations
12 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2021
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 30, 2014
Dob violation - dismissed - Construction other optional
Stop all work, contact the borough comm. office at 718 802-3677 as soo n as possible
May 8, 2014
Dob violation - dismissed
ECB violations
18 ECB violations, newest first.
- Class - 1
Failure to safeguard all persons&property affected by const.oper.noted sidewalk at entrance of bldg is in total disrepair.old concrete poured but no finished w/plywood partially covering area.plywood panals are
May 8, 2014
Resolve - Class - 1
Sec 28-3314.9 misc viol: supported scaffold does not meet bldg code specs in that missing cross braces, screw jacks, mudsills/base plates. remedy: conform to code
May 25, 2010 · Penalty $1,600
Resolve - Class - 1
Fail to safeguard all persons/property affected by const operations. noted: at alleyway an accumulation of masonry & const debris affectingaccess to adjacent bldg alley. remedy: safeguard public & property.
May 25, 2010 · Penalty $2,400
Resolve - Class - 2
Work w.o permit expired permit. job 302257723 fence exp 5/15/10. remedy: renew permit for fence
May 25, 2010
Resolve - Class - 2
Work w.o permit expired permit. job 302257723 nb exp 5/15/10. remedy: renew permit for new bldg
May 25, 2010 · Penalty $400
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operations. upon inspection at the above address 3 stories bldg is under construction up to 3flr with concrete & blocks debris falling on the
Mar 23, 2009 · Penalty $12,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guard rails. upon inspection at the above address 3 stories building is under construction,workers are on 3flr installing 8
Mar 23, 2009 · Penalty $12,000
Resolve - Hazardous
Job site fence defective: upon inspection job site fence open into pedestrian sidewalk approx 8 feet or both sides. rem: repair & or replacefence to open into job site-stop all work call best for r.e. 212-666-
Jun 16, 2008 · Penalty $500
Resolve - Non-hazardous
27-1069 no fndy permit for storage a users of acetylene + oxygen on premises. remedy: obtain permit as per dob + fdny stop all acetylene + oxygen work + remove from premises.
Jun 16, 2008 · Penalty $500
Resolve - Hazardous
Failure to safeguard public & property upon inspection the nb is underconstruction,foundation is in place. @ time of inspection the foundation & cellar hole partly dilled w/ dirt leaving apprx 7ft-8ft deep hole
Jan 25, 2008 · Penalty $1,000
Resolve - Hazardous
Failure to provide protection at sides of excavation upon inspection the foundation work is in progress at time of inspection 3 workers are working in the foundation of the elevator shaft a very deep hole has
Dec 11, 2007 · Penalty $1,000
Resolve - Hazardous
No guard rail upon inspection the foundation work is in progress at time of inspection no guard rail has been provided at the front walls offoundation.remedy:stop all work provide guard rail call best squad for
Dec 11, 2007 · Penalty $1,000
Resolve - Non-hazardous
Sec. 27-132. no controlled inspector on site when contractor is performing underpinning noted: underpinning at rear adjacent bldg. cannot reach controlled inspector. remedy: stop all work. notify controlled
Jul 25, 2007 · Penalty $400
Resolve - Non-hazardous
Failure to post contractor's signage.no contractor's signage posted.remedy:post contractor signage.
May 25, 2007 · Penalty $250
Resolve - Non-hazardous
Expired permit.fence.permit302143357 expired 12/31/06 no renewal on file partial foundation in place.demo not signed off.remedy:stop all work,remove fence.
May 25, 2007 · Penalty $1,250
Resolve - Non-hazardous
Expired permit- fence. fence permit has expired on 12/31/06 no: 302143357 no renewal on dept records. remedy:renew fence permit.
Feb 2, 2007 · Penalty $2,500
Resolve - Hazardous
No contractor sign. job site has no contractor(s) signage posted. remedy: post contractors signage.
Feb 2, 2007
Resolve - Hazardous
Failure to safeguard public & property. portion of job site fence is down open to demo site. site has open foundation, debris no work @ timeof insp. remedy: stop all work; repair/ erect job site fence.
Feb 2, 2007 · Penalty $5,000
Resolve