roofy

Violations at 4622 New Utrecht Avenue

Brooklyn, NY 11219 · BBL 3-05621-0012 · Back to the property

HPD housing violations

The newest 50 of 63 HPD violations. The city keeps the complete history.

  • BHazardous

    Properly repair the broken or defective locking device entrance door street to vestibule

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective plaster walls and ceilings 1st story to 2nd story public hall

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood treads 1st to 2nd story public hall

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective locking device entrance door 2nd story apt . 1

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective door jamb entrance 2nd story apt. 1

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches throughout 2nd story apt. 1

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective counter top and cabinet at sink kitchen 2nd story apt. 1

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling kitchen 2nd story apt. 1

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Replace with new the missing chain window bottom sash kitchen 2nd story apt. 1

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor southeast and west room 2nd story apt . 1

    Feb 7, 2005

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of exposed electrical wires ceiling throughoiut 2nd story apt. 1.

    Feb 7, 2005

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening double cylinder key operated lock at entrance to 3rd story apt . #2.

    Feb 4, 2005

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of double cylinder lock entrance door to building.

    Feb 4, 2005

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures 2nd story apt. 2.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color wall and ceiling throu--out 2nd story apt.

    Feb 4, 2005

    Open — Nov sent out
  • CImmediately hazardous

    Replace with new the missing glass upper sash east window north west room 2nd story apt.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls and ceiling throughout 3rd story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of double cylinder key operated lock on entrance door to 3 story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Replace with new the missing mortise lock and assembly entrance door to 3rd story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Replace with new the missing knobs on kitchen stove 3rd story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color wall under kitchen sink and all walls kitchen 3rd story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Replace with new the missing waste line under wash basin bathroom 3rd storyapt #3

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls bathroom 3 story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective and make operable left front and left rear burner stove kitchen 3rd story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin water bugs, mice and roaches throughout 3rd story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective wood floor of the center and northeast room 3 story apt #3.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Properly secure the loose wood tread 6th and 7th up from bottom 2 to 3 story public hall.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Properly secure the loose wood tread 1 up from bottom 2 story intermediate landing to 3rd story public hall.

    Feb 4, 2005

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures kitchen and bathroom, 2nd story apt. #2.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Provide adequate lighting for 2nd story public hall, 60 watts, incandescent or 20 watts fluorescent required.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective leaky radiator in front east room, 3rd story apartment.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor throughout 3rd story apartment.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at kitchen and bathroom in 3rd story apartment.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling 2nd story apt

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of household articles - bed spring ladder 3rd sty public hall.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color wall at closet 2nd room from rear 3rd sty apt.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color wall at rear of water closet at bathroom 3rd sty apt.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the missing glass insert at vestibule ddor 1st sty public hall.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Refit vestibule door leading to 1st sty public hall.

    Feb 4, 2005

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures kitchen & bathroom 2nd sty apt.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the broken or defective glass -lower sash --kitchen --2nd sty. apt.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the broken or defective glass --lower sash -west room -3rd sty apt.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the walls and ceilings --1st, 2nd and 3rd sty. public halls.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls ceilings all stys.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective saddle at entrance door 1st sty.

    Feb 4, 2005

    Open — Nov sent out
  • ANon-hazardous

    Cleanse to the satisfaction of this department the public hall all stys.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Replace with new the missing bulb 3rd sty public hall.

    Feb 4, 2005

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color --wall 2nd sty public hall.

    Feb 4, 2005

    Open — Nov sent out

DOB building violations

5 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 19, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building defect noted:in that plyboard constructed on wall at 1st floor entrance to 2nd floor at public hallway plyboard not fire rated. remedy: maintain building make repairs to wall at hallway with firerated material

    Jun 27, 2001

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jun 6, 2001

    Dob violation - active

ECB violations

8 ECB violations, newest first.

  • Class - 1

    (27-364)failure to maintain unobstructed egress.(2)types of obstruction present. 1)fire escape @ rear of bldg has an obstructed discharge inthat a steel gate secured w/a padlock in the closed position prevents

    Jul 27, 2011 · Penalty $6,000

    Active
  • Non-hazardous

    Failure to provide/maintain fire stopping where required. noted: cellar wood joist are exposed apprx 6ft x 6ft @ middle location. missing sheetrock. cellar concrete foundation wall is open apprx 3 1/2ft x 7ft

    Feb 19, 2008 · Penalty $350

    Active
  • Hazardous

    Failure to provide @ least 2 means if egress from the sros room on 3rdflr front location no access in the corridor for this room. remedy: provide required means of egress.

    Feb 19, 2008 · Penalty $480

    Active
  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved # of families. noted: 2 family units (1 on 2nd & 1 on 3rd flr 1st commercial) has 3 sros in 2nd flr & 3 sros in 3rd flr. these

    Feb 19, 2008 · Penalty $1,700

    Active
  • Hazardous

    Failure to maintain bldg. noted: 2nd & 3rd flrs are sinking. stairs from 1st,2nd to 3rd flr are sinking as well & separated from the walls. remedy: obtain all applicable permits to do all repairs. obtain

    Feb 14, 2008 · Penalty $800

    Active
  • Non-hazardous

    Failure to maintain building defect noted: in that plyboard constructed on wall at 1st floor entrance to 2nd floor at public hallway, plywood not fire rated. remedy: maintain building & make repairs to wall at

    Jun 27, 2001 · Penalty $2,500

    Active
  • Non-hazardous

    Failure to maintain building.defects noted:holes in walls a various location throughout building,light fixture ranging 2nd floor hallway remedy:repair and/or replace.

    Jun 6, 2001 · Penalty $2,500

    Active
  • Non-hazardous

    32a,49. boiler pit filled with toxic oil and water mixed together, exposed line voltage wiring hooked into socket to boiler.

    Apr 5, 1999 · Penalty $400

    Active