Brooklyn, NY 11219 · BBL 3-05607-0071 · Back to the property

HPD housing violations

11 HPD violations, newest first.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all six radiators in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north

    Dec 19, 2014 · Apt 2FL

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace with new the broken or defective upper and lower sash window in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north

    Dec 19, 2014 · Apt 2FL

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north

    Dec 19, 2014 · Apt 2FL

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north

    Dec 19, 2014 · Apt 2FL

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of mice located at apt 2fl, 2nd story, 1st apartment from west at north

    Dec 19, 2014 · Apt 2FL

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 2 sq.ft, north wall 3 sq.ft, south wall 3 sq.ft. and west wall 4 sq.ft. in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north

    Dec 19, 2014 · Apt 2FL

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the radiator in the 2nd room from north located at apt 2fl, 2nd story

    Nov 10, 2014 · Apt 2FL

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... north and east walls approx 20 sq ft. in the bathroom located at apt 2fl, 2nd story

    Nov 10, 2014 · Apt 2FL

    Closed — Violation closed
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. court at north

    Aug 21, 2014

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story

    Aug 21, 2014 · Apt 2

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling, north and east walls / 20 square feet / in the bathroom located at apt 2, 2nd story

    Aug 21, 2014 · Apt 2

    Closed — Violation closed

DOB building violations

11 DOB violations, newest first.

  • Construction other optional

    Borough commissioner has ordered all work stopped under application #321197370 on 3/26/21 due to construction superintendent withdrawal

    Mar 29, 2021

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has ordered all work stopped under application #321197370 on 3/26/21 due to construction superintendent withdrawal

    Mar 29, 2021

    Dob violation - dismissed
  • Construction other optional

    Stop all work immediately, make site safe contact borough comm office bklyn at 718 802-3677

    Mar 25, 2021

    Dob violation - dismissed
  • Construction other optional

    Stop all work immediately, make the site/contact borough comm. office bklyn at 718 802-3677

    Mar 25, 2021

    Dob violation - dismissed
  • Construction other optional

    Stop all work immediately, make the site safe, contact borough comm office

    Mar 25, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 14, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Construction other optional

    Stop all work immediately borough comm. office at 718 802-3677 for information

    Jul 17, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2018

    Dob violation - dismissed

ECB violations

47 ECB violations, newest first.

  • Class - 2

    Bc 3307.8 maintaining department of transportation. at the time of my inspection i observed entire sidewalk was demoed while the debris was stored at exposure1. also required by the department is that a 5 fe

    May 22, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    At the time of inspection proposed 6-story new building active construction site observed two oxygen tanks, flammable gas containers without proper marking or tags stored inside the building under a stair fligh

    Sep 30, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Bc3314.1 at the time of inspection 6-story new building active construction site observed masonry work and facade insulation installation in progress at exposure 3 using supported scaffold with working platform

    Sep 30, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3307.1 expired dot permits. at the time of my inspection of a active job site with materials delivery at exposure 1 stipulated dot lane , i observed that all the dot posted were expired. upon review of al

    Apr 17, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3314.1 suportedscaffold not as per code. at the time of my inspection i observed a supported scaffold at platform between 3rd and 4th floor that were provided for the masonry operation, i observed that t

    Apr 17, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3301.2 missing infillsfor interior stairs. at the time of my inspection of a active job site at 4th floor level , i observed that the steel stairs were missing infills at all stair from 1st floor to 4th fl

    Apr 17, 2024 · Penalty $2,530

    Resolve
  • Class - 1

    At the time of my inspection of a 6 story new building currently at 4th floor level, i observed bags of debris stored on 1st floor level while all the other floors had mix debris consisting of cardboard , wood

    Apr 17, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3309.10 roof protection. at the time of my inspection of a active 6 story new building currently at 4 floor level , i observed that the protection provided at exposure 4 for the garage roof was inadequate

    Apr 17, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    At the time of my inspection of a 6 story new building under construction currently at 4th floor level, i observed workers at exposure 2 with brickwork installation working unsafely , no guardrail protection we

    Apr 17, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    Observed delivery operation using a boom truck in close proximity with exposed electrical wires on utility pole. boom was approximately 3 feet away from exposed electrical wires. no safety measures provided to

    Dec 27, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    Observed temporary working platforms in shafts in multiple locations. upon request for designed drawings for working platforms, none were provided or available on site.stop all use of temporary working platform

    Dec 27, 2023

    Resolve
  • Class - 1

    Bc 3314.1 supported scaffold installed not as per code. observed supported scaffold at exp 2,3,4 installed not as per code and in use by workers. 1. missing guardrail systems. 2. missing pins. 3. missing cross

    Dec 27, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to provide protection for adjacent property and its residents. observed missing overhead protection at exp#2 and exp#4, at adjacent property walkway and rear yard that is occupied and being used. buildi

    Aug 10, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Missing construction fence. observed missing construction fence at exp#4 on an active construction jobsite. jobsite with multiple hazardous conditions accessible to public. this condition puts public in danger

    Jul 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Observed construction jobsite accessible to public. observed doors of occupied adjacent building at exp#4 open into a construction site. occupants of building at exp#4 have direct access to jobsite. site safety

    Jul 11, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3307.4.3 vehicular traffic provide by barricades,signals,signs in accordance w/dot.stop all equipment storage on st provide signage,lighted devices,barricades for vehicular traffic&pedestirans.no warning devi

    Apr 26, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Jobsite fence not maintained pursuant to subsec const fence missing viewing panels@exp1 note:ato my insp of proposed 6stynb under const observed const fence@exp1 missing viewing panel comply w/bldg code for tem

    Apr 26, 2022

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements.note at time of inspection on a proposed 6 story building(no constructionactive site),i observed large amounts of debris stored at exp1 and 4 c

    Nov 18, 2021

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection.note at the time of inspection at a proposed 6 story new building,i observed construction fence in place.installed construction fence does not

    Nov 18, 2021

    Resolve
  • Class - 1

    Failure to protect adjoining property during side of excavation @time of insp on inactive 6stynb const site.notice@exp4 shoring inside constsite was failing&this led to shared driveway to cavein,leaving opening

    Mar 25, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3303.7.2,fire extinguisher.noted:at time of inspection of an active jobsite observed only one fire extinguisher on site with missing yearly inspection and place on the ground.aslo missing as per code requirem

    Oct 26, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain/display on site document required by bc chapter 33 noetd at the time of my inspection of an actiev jobsiet upon request to see the pre construction servery none was provided teh last montor

    Oct 26, 2020

    Resolve
  • Class - 2

    28-110.1-inadequate site sfaty plan noted at the time of my inspection of an actiev jobsite upon revieiwng the site sfaty plan ssp-2.04 for excavation phase has no details for excavation stage provide adequate

    Oct 26, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Work does not conform to plan noted at the time of my inspection of an actiev jobsite upon reviewing soe plan section doe 104 shows 5x24 or steel anegl 5x3 to be weld to the pile when insatlling the shoring ho

    Oct 26, 2020

    Resolve
  • Class - 2

    Bc3301.13.12-no compettent persosn noted at the time of inspection of an actiev jobsite upon request to see the construction superintendnet log to verify competent persosn observed (olun bustillo) designated in

    Oct 26, 2020 · Penalty $620

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping. note: at the time of my inspection of a 6 sty new bldg i observed from street level inadequate housekeeping. large pile of wood combustible material that can create a

    Oct 23, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Sec. 27-1009(a) failure ti safeguard all persons & property affected by construction operations. at time of inspection jobsite fence on exp#1(45 street)has partly collapsed onto the public sidewalk has nails st

    Jun 11, 2020 · Penalty $10,000

    Resolve
  • Class - 2

    Bc 3309.11 failure to protect tree. at a time of inspection of a new building currently at foundation observed at exp.1 adjacent to construction fence 1 large old growth tree w/o protection as required by parks

    Feb 4, 2020

    Resolve
  • Class - 1

    At time of inspection noted that jobsite fence was poorly constructed and had fallen into neighbors property while inspection was ongoing. additionally jobsite was left unlocked and unguarded creating access to

    Jan 25, 2020 · Penalty $10,000

    Resolve
  • Class - 2

    Noted fence leaning at exp 1, 2, and 4. 2 panels of fence collapsed during inspection at exp 2 missing neighbors car and inspector. fence was constructed of chip board not ply, w/ unpainted sections, lacking vi

    Jan 25, 2020

    Resolve
  • Class - 2

    Project information panel.at time of inspection on an proposed 6 storynb,i observed served no ongoing construction work also observed on exp#1 project information panel inadequate-not maintained as per code-det

    Jan 4, 2020

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection.attime of inspection on an proposed 6 story nb open permit i observed noongoing construction work.also observed fence(job site fence)deteriora

    Jan 4, 2020

    Resolve
  • Class - 1

    Bc33012-failure to maintain building in a code compliant manner.at thetime of inspection i observed proposed 6 story new building currently at the excavation phase.job site closed,however is was observed contra

    Dec 19, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    3307.7.7 failure to maintain jobsite fence note: @time of inspection observed fence not being maintained as per code, fence leaning, protecting nail heads, osb board delaminating, sharp edge from metal plates

    Sep 7, 2019 · Penalty $625

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection. noted;at active site under job#321278933 observed at exposure#4 construction fence w/ several panels bulging at bottom w/ some opening allowi

    Jan 24, 2019

    Resolve
  • Class - 1

    Failure to institute/maintain measures or temporary construction. @ time of insp of a 2 story bldg undergoing demolition. observe workers performing hand demo @ active job site w/out any guardrails around the p

    Jun 25, 2018 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to designate &/or have construction superintendent present @ site as required. @ time of insp of a 2 story bldg undergoing demolition active job site. observed 5 workers performing demolition work of a

    Jun 25, 2018 · Penalty $12,500

    Resolve
  • Class - 1

    Sec. 3304.3 housekeeping. at time of inspection for an active demo observed large amounts of debris on upper floor working deck creating a hazard to walk safely in area also observed extremely large amounts of

    Apr 23, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3303.11 egress(off site)at time of inspection on an active demo site,i observed large clutters of debris blocking staircase & hallway on site creating a hazard for person to enter or exit site in a safe

    Apr 23, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3307.2.3 overhead protection(exp#1)at time of inspection on an active demo,i observed worker on 2nd level breaking brick & falling to ground level outside from door at exp#1 w/no overhead protection for

    Apr 23, 2018

    Resolve
  • Class - 1

    Sec. 3301.1.1 responsibility for safety. at time of inspection observed that sidewalk shed & construction fence have blocjed & prevented use of shared driveway. prohibiting use of (easement) by adjoining proper

    Mar 7, 2018 · Penalty $625

    Resolve
  • Class - 1

    Scaffold netting & planking. at time of inspection observed that scaffolds at exp#1,2&4 had planks laying on them which were not secured down & scaffolds had no veritical netting above 1st fl & property as mate

    Mar 7, 2018

    Resolve
  • Class - 1

    3303.13.1 fence missing. at time of inspection observed 2 story dm building fence missing at exp-1 (a panel) failure to maintain construction fence as required. created a hazardous condition for pedestrian acce

    Dec 13, 2017 · Penalty $4,000

    Resolve
  • Class - 1

    Bc3301.7/design drawings;at time of inspection observed fence with"catch all" at exp 4.when i requested design drawing for weight affixed totop of construction fence none was provided.in addition i observed gap

    Nov 27, 2017 · Penalty $400

    Resolve
  • Class - 2

    Housekeeping-sidewalk/at time of inspction of 2 story building being demolished observed sidewalk used by public had cracks and areas that could be a tripping or fall head.rem:comply with code.

    Nov 27, 2017

    Resolve
  • Class - 1

    Bc3309.11/tree protection;at time of inspection of demolition of 2 story building in progress observed no tree protection as required by parks & recreation.rem:comply with code.

    Nov 27, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Overhead protection.at time of inspection of demolition of 2 story bldg observed inadequate overhead protection for exp 2 & exp 4 no protection provided for driveway at exp 2 and inadequate protection at exp 4

    Nov 27, 2017 · Penalty $10,000

    Resolve