Fort Hamilton Parkway
Brooklyn, NY 11219BBL 3-05587-0038Map
Owner of record: NYC School Construction Authority
Fort Hamilton Parkway is a school building built in 2023 in Brooklyn, 11219. The owner of record is NYC School Construction Authority. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 66
- ECB violations
- 68
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 66
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2019
Dob violation - dismissed
Show 40 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 23, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2012
Dob violation - resolved - Construction other optional
C-construction other optional
Jul 6, 2012
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 68
- Class - 2
At time of inspection, in knuckle boom, sn-9129-0050 used by dimitri enterprises inc was on site lifting material w/o a certificate of on-site inspection. the crane was working outside of the exemption of bc 33
Mar 11, 2026 · Penalty $5,000
Active - Class - 2
At time of inspection, in knuckle boom, sn-9129-0050, hmo# 10531was on site lifting material w/o a certificate of on-site inspection. the crane was working outside of the exemption of bc 3319.10. a certificate
Mar 11, 2026 · Penalty $312
Resolve - Class - 2
At time of inspection, in knuckle boom, sn-9129-0050 was on site lifting material w/o a certificate of on-site inspection. the crane was working outside of the exemption of bc 3319.10. a certificate of on-site
Mar 11, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection, knuckle boom, sn-9129-0050 was on site supervised by gc# 615226, was lifting material w/o a certificate of on-site inspection. the crane working outside of the exemption of bc 3319.10. ce
Mar 11, 2026 · Penalty $5,000
Resolve - Class - 1
After audit it was discovered that knuckle boom (sn# 9129-0159) being used by dimitri enterprises inc was servicing the job site & was not making a delivery which it was then required to have a pmm permit that
Dec 26, 2025 · Penalty $1,250
Resolve - Class - 1
At time of inspection, a knuckle boom crane (sn# 9129-0159) being used by dimitri enterprises inc was on site do crane operation with the crew involved with attaching and detaching hoisting slings were not rigg
Dec 26, 2025 · Penalty $2,500
Resolve - Class - 1
After audit it was discovered that knuckle boom (sn# 9129-0159) was servicing the job site onsite & not making a delivery which it was required to have a pmm permit that was not produced., obtain permit
Dec 26, 2025 · Penalty $2,500
Resolve - Class - 1
After audit it was discovered that knuckle boom (sn# 9129-0159) was servicing the job site which is under the authority of gc-forte construction corp (615226) & was not making a delivery which it was then requi
Dec 26, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection, a knuckle boom crane was on site servicing the job under the authority of gc-forte construction corp (615226) the crew involved with attaching and detaching hoisting slings were not riggi
Dec 25, 2025 · Penalty $2,500
Resolve - Class - 1
I observed unenclosed perimeter at expo#1 during a delivery. there was no guardrail system, vertical netting, controlled access zone established or materials and equipment remove within 10 feet of perimeter edg
Aug 9, 2025 · Penalty $5,000
Resolve
Show 40 more ↓
- Class - 1
Failure to provide overhead protection-bc-3301.2.atoi at active construction site i observed missing ohp at exp. # 1-site entrance for workers,visitors and first responders entering and leaving job site from ar
Oct 18, 2024 · Penalty $5,000
Resolve - Class - 2
Expired dep permit for use of fire hydrant.atoi i observed workers use water supplied from fire hydrant with hose running from street,upon request from site personnel for dep fire hydrant use permit,provided de
Oct 18, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner illumination for exits,exit discharges & public corridors per bc 1006.1;27-381. in basement level in cafeteria in 5 place each place 2 light & in 1st fl gym 6 p
May 20, 2021 · Penalty $625
Resolve - Class - 2
Exit door not self closing properly at 1st fl exit 7 outside exit door2 exit door not self closing properly at the time of inspection. remedy: repair/replace door.
May 20, 2021 · Penalty $625
Resolve - Class - 2
Reissue #35433892x noted at exposure 3(rear of building water penetration above the 2nd floor window mainly at room 204 repair and or replacce
Jun 3, 2020 · Penalty $1,562
Resolve - Class - 2
28-301.1-reissue#35334190h noted at the gas meter room does not have a fresh air or mechanical comply with a notice of violation
Jun 3, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to maintain buildingin code compliant manner noted at stair a roof door and 202;the doors are not working properly repair and or replace
Jun 3, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner ullimunationfor exits ,exit discharges and public corridors per bc 1006;1,27-381.noted at the gymnasium by stair e (#20) inside the gymansium at main entran
Jun 3, 2020 · Penalty $625
Resolve - Class - 2
Reissue#35433893h noted at gymnasium left exit stair e 1st floor stair c and d and smoke by the main entrance the exit doors are not working properly repair and or replace door
Jun 3, 2020 · Penalty $1,562
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35422599n issued on 05-07-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for cracks at exposure
Sep 27, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35362854j issued on 01-04-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit,doing interior demolition. remedy: comply
Sep 27, 2019 · Penalty $625
Resolve - Class - 1
Permit holder/owner/workers employers failed to ensure each construction or demolition worker successfully completed the required training under bc3321.1 observed range ramirez cruz at a bldg site for which a
Sep 10, 2019 · Penalty $1,250
Resolve - Class - 1
Permit holder/owner/workers employer failed to insure each construction or demolition worker successfully completed the required training under bc3321.1 observed rangel ramirez cruz at a bldg site for which a c
Sep 10, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to conduct orientation for worker. permit holder failed to ensure workers attend pre-shift safety meeting prior to commencement of work. note: at the time of inspection oif a 4 sty demo site when asked
Sep 10, 2019 · Penalty $5,000
Resolve - Class - 2
Reissued#35334195r issued 5-22-18,failure to maintain bldg in code compliant manner: wrought iron railing on 60th street side entrance to 2nd fl is deteriorating w/sign of rusted w/sharp edges on top of handrai
Jul 22, 2019
Resolve - Class - 2
Reissued#35334193n 5-22-18 failure to maintain bldg walls or appurtenances. at exp#3 rear of bldg water penestrating above 2nd fl windows in various locations. remedy: maintain exterior bldg walls.
Jul 22, 2019
Resolve - Class - 2
Reissued#353341292l 5-22-18 failure to maintain bldg in code compliant manner. at 1st fl gym,doors are not close properly due to poor hinges & door checks. remedy: repair &/or replace door.
Jul 22, 2019
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation#35362854j issued on 01/04/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.rem
May 17, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation#35362857p issued on 01/14/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.rem
May 17, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building walls or appurtenance note:at exposure#1 corner of exposure#1&4 on 40th street side cracked brick missing mortar with vertical and horizontal step cracking.rem:maintain exterior bui
May 17, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35362856n issued on 01-04-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to safeguard all persons & property affected by constru
Apr 4, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35362858r issued on 01-04-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain adequate housekeeping per section requireme
Apr 4, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35362855l issued on 01-04-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain adequate housekeeping per section requireme
Apr 4, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at corner of exp#1&4 w/vertical & horizontal bricks/cracked & missing mortal. previous ecb#35381264n. remedy: maintain exterior bldg walls.
Mar 29, 2019 · Penalty $1,562
Resolve - Class - 1
Failing to maintain building wall(s)or appurtenances. at the time of inspection i observed at exp #1 and exp #4 corner section of a 3 storybuilding show several bricks,cracked,missing mortar on vertical and
Jan 23, 2019 · Penalty $3,125
Resolve - Class - 1
Work w/o a permit-at time of inspection,interior demolition of ceilings,firestopping and electrical wiring at all floors w/o a valid permit.remedy:stop all work except to make site safe contact bklyn boro dob 7
Jan 4, 2019 · Penalty $2,500
Resolve - Class - 1
Work w/o a permit. at time of inspection,interior demolition of ceilings,firestopping and electrical wiring at all floors w/o a valid permit. remedy:stop all work-except to make site safe contact bklyn boro dob
Jan 4, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements-at time of inspection 100 cubic yards of combustible construction debris at rear yard of premises. immediately adjacent to an occupied parochia
Jan 4, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. at time of inspection,16'linear feet of construction fenceat exposure 4 of site loose and partially detached from frame. remedy:
Jan 4, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.at time of inspection 100 cubic yards on combustible construction debris at rear yard of premises immediately adjacent to a () parochial school
Jan 4, 2019
Resolve - Class - 1
Reissue vio#35355334k failure to maintain bldg walls or appurtenances.note: at exp#1&4 corner several bricks chipped,cracked,& missing mortar at 1,2,& 3 floor. remedy: maintain exterior bldg wall.
Dec 10, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. noted, observedat the corner of exposure#1+4 several bricks chipped, cracked+missing mortar at 1st fl, 2nd fl+3rd fl. remedy:maintain building walls(exteri
Oct 30, 2018 · Penalty $1,250
Resolve - Class - 2
Bc28-301.1:failure to provide ventilation to gas meter rm per p115.6(1968 code)fgc appendix e(e4)(2014 code)note:at gas meter rm not ventilated.rem:comply w/notice of violation vent gas meter rm.
May 22, 2018
Resolve - Class - 2
Re-issue#35268098m.failure to maintain bldg in code compliant manner.lack of fire stopping per bc 712.3;27-345.note at rm b009 in bsmt no fire stopping at pipes thru wall.rem:provide/maintain fire stopping
May 22, 2018
Resolve - Class - 2
Failure to maintain bldg walls and appurtenance.note:at exp# south east corner 2nd fl water penetrating above window pointing on bricks.rem:maintain exterior bldg walls.
May 22, 2018
Resolve - Class - 2
Failure to maintaib bldg in code-compliant manner.note:on 1st fl gym door are split and not closing properly.rem:repair or replace door.
May 22, 2018
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.note:at bsmt level in gas meter rm and electrical rm illegal storage of combustibles.rem:repair or replace remove illegal storage.
May 22, 2018
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: no fire stopping per bc 712.3;27-345. no fire stopping in room b009. remedy: comply w/sumons.
Jun 22, 2017
Resolve - Class - 2
Re-issue#35221626z no fresh air vent in gas meter room. remedy: comply w/summons.
Jun 22, 2017
Resolve - Class - 2
Failure to maintain bldg in code compliant manner;lack of emergency lighting for exit discharges and public corridors per bc 1006.1;27-542.rem:@1st flr, gym area and the public corrdor inoperative emergency lig
Nov 16, 2016 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 2023
- Floors
- 4
- Residential units
- —
- Building area
- 77,611 ft²
- Lot area
- 20,955 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 38
- Block / lot
- 5587 / 38
- Assessed value
- $1,640,700
- Landmark / historic district
- No
Questions about Fort Hamilton Parkway
Who owns Fort Hamilton Parkway?
The owner of record in NYC Department of City Planning PLUTO data is NYC School Construction Authority.
Does Fort Hamilton Parkway have violations?
NYC HPD has no housing violations on record for this property.
Is Fort Hamilton Parkway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was Fort Hamilton Parkway built?
City records list 2023 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.