roofy

Violations at 1502 68 Street

Brooklyn, NY 11219 · BBL 3-05573-0006 · Back to the property

HPD housing violations

The newest 50 of 122 HPD violations. The city keeps the complete history.

  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at vestibule entrance door

    Jul 6, 2022

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt d1, 4th story, 1st apartment from south at west

    Jul 6, 2022 · Apt D1

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt d1, 4th story, 1st apartment from south at west

    Jul 6, 2022 · Apt D1

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt d1, 4th story, 1st apartment from south at west

    Jul 6, 2022 · Apt D1

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of bedbugs located at apt c3, 3rd story, 1st apartment from south at west

    Sep 25, 2019 · Apt C3

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt c3, 3rd story, 1st apartment from west at north

    Jul 1, 2019 · Apt C3

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt c3, 3rd story, 1st apartment from west at north

    Jul 1, 2019 · Apt C3

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt c3, 3rd story, 1st apartment from west at north

    Jul 1, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of houshold items at public hall, 1st story

    Jul 1, 2019

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioning units at 3rd and 4th story balconies, building front at east at fire escape

    Jul 1, 2019

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of bedbugs in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west

    Jun 25, 2019 · Apt C3

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets washbasin in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Jun 25, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Repair the leaky and/or defective faucets bathtub in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Jun 25, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Abate the infestation consisting of bedbugs in the entire apartment located at apt c3, 3rd story, 1st apartment from west at north

    Apr 26, 2019 · Apt C3

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt c3, 3rd story, 1st apartment from west at north

    Apr 26, 2019 · Apt C3

    Open — Not complied with
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt c3, 3rd story, 1st apartment from west at north

    Apr 26, 2019 · Apt C3

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartment located at apt c3, 3rd story, 1st apartment from west at north

    Apr 26, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Properly secure the loose handrail at public hall stairs, 1st story

    Apr 23, 2019

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pot on 4story balcony at 1st fire escape from north at east

    Apr 23, 2019

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pot on 4story balcony at 1st fire escape from east at north

    Apr 23, 2019

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic floor tiles behind water closet in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective and make operable the bell/buzzer intercom system from street building entrance to apartment in the foyer located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Open — Not complied with
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the foyer located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the radiator near the window in the 4th room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation closed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallway located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the window stool at west in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the heat riser in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and the ceiling in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... approximately 8 sqft at ceiling, 4sqft at north wall and 4 sqft at east wall in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Open — Defect letter issued
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the east and and north walls in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling, east and north walls in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • CImmediately hazardous

    Trace and repair the source and abate the visible mold condition... approximately 30 sqft at east wall in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Open — Invalid certification
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing vinyl tiles at floor in the kitchen located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Replace the broken or defective sink and faucet in the kitchen located at apt c3, 3rd story, 1st apartment from south at west

    Apr 23, 2019 · Apt C3

    Closed — Violation dismissed
  • BHazardous

    Fire escape defective. properly secure support triangle brace from top front rail to bottom front rail, 2nd story balcony at fire escape at north

    Sep 25, 2018

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of bicycles, strollers at public hall, 1st story

    Sep 17, 2017

    Closed — Violation dismissed
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ; located at apt 1a, 1st story, 1st apartment from north at east

    Jul 27, 2015 · Apt 1A

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box

    Apr 24, 2015

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Apr 24, 2015

    Closed — Violation dismissed

DOB building violations

3 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed

ECB violations

No ECB violations on record