1754 63 Street
Brooklyn, NY 11204BBL 3-05539-0036Map
Owner of record: Utrecht 7718, LLC
1754 63 Street is a walk-up apartment building built in 1931 in Brooklyn, 11204. It has 6 residential units across 3 floors. The owner of record is Utrecht 7718, LLC. HPD has recorded 80 housing violations here, most recently on May 1, 2026. 11 of the 50 most recent violations are still open.
- HPD violations
- 80
- DOB violations
- 9
- ECB violations
- 0
- HPD complaints
- 28
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 80
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 5, 2024
Open — Invalid certification - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye at building entrance door
Jul 26, 2024
Open — Invalid certification - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint the front at fire escape
Jul 26, 2024
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard at north
Jul 26, 2024
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 2nd room from north located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble saddle in the entrance located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window in the 1st room from north located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye at vestibule door at public hall, 1st story
Jul 26, 2024
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Jul 26, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 28, 2022
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated lock at door to room with fire escape window in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Jan 28, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate , in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Jan 28, 2022 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story
Aug 12, 2021 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st riser from south at west wall in the 3rd room from north at west located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the foyer located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 2nd window frame from east at south wall, 1st door from west at north wall in the 3rd room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Aug 12, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2r, 2nd story
Aug 12, 2021 · Apt 2R
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story
Aug 12, 2021 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at south wall, baseboard at north wall, 1st window frame from west at north wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from north at west located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the 2nd room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from east at south wall in the foyer located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st window frame from east at south wall in the 3rd room from north at west located at apt 2r, 2nd story, 1st apartment from east at south
Aug 12, 2021 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Aug 12, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from north at east located at apt 2r, 2nd story, 1st apartment from east at south
Aug 12, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Aug 12, 2021 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, 1st riser from west at north wall in the 2nd room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Aug 12, 2021 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 2r, 2nd story
Aug 12, 2021 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Jun 20, 2021
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jun 20, 2021 · Apt 2R
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1r, 1st story, 1st apartment from east at south
Jun 20, 2021 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Apr 26, 2021 · Apt 1F
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 6, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 6, 2021
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors ... in the entrance located at apt 1f, 1st story, 1st apartment from south at west
Apr 5, 2021 · Apt 1F
Closed — Violation closed
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Jul 23, 2024 · Apt 2F
Close - Door/window
Door
Jul 23, 2024 · Apt 2F
Close - Water leak
Slow leak
Jul 23, 2024 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Jul 23, 2024 · Apt BLDG
Close - Safety
Window guard broken/missing
Apr 2, 2021 · Apt 1F
Close - Door/window
Window frame
Mar 16, 2021 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 18, 2020 · Apt 2
Close - Unsanitary condition
Mold
Nov 25, 2019 · Apt 2F
Close - Unsanitary condition
Pests
Nov 25, 2019 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 23, 2016 · Apt 1F
Close
Show 18 more ↓
- Electric
No lighting
Sep 26, 2016 · Apt 1F
Close - Electric
No lighting
Sep 26, 2016 · Apt 1F
Close - Electric
No lighting
Sep 26, 2016 · Apt 1F
Close - Heat/hot water
Entire building
Jan 26, 2016 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 4, 2015 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 9, 2015 · Apt 1F
Close - Heating
Heat related
Apr 20, 2011 · Apt 2F
Close - General
Floor
Apr 20, 2011 · Apt 2F
Close - General
Floor
Apr 20, 2011 · Apt 2F
Close - Heating
Heat related
Nov 13, 2009 · Apt 1R
Close - General
Ceramic-tile
Aug 2, 2006 · Apt 2F
Close - General
Doors
Aug 2, 2006 · Apt 2F
Close - Nonconst
Vermin
Aug 2, 2006 · Apt 2F
Close - Paint/plaster
Wall
Aug 2, 2006 · Apt 2F
Close - Paint/plaster
Wall
Aug 2, 2006 · Apt 2F
Close - Plumbing
Water supply
Aug 2, 2006 · Apt 2F
Close - General
Cabinet
Aug 2, 2006 · Apt 2F
Close - General
Windows
Aug 2, 2006 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,824 ft²
- Lot area
- 1,980 ft²
- Zoning
- R5
- Community board
- 311
- Council district
- 43
- Block / lot
- 5539 / 36
- Assessed value
- $531,450
- Landmark / historic district
- No
HPD registration #361509, last renewed Sep 6, 2025.
Questions about 1754 63 Street
Who owns 1754 63 Street?
The owner of record in NYC Department of City Planning PLUTO data is Utrecht 7718, LLC.
Does 1754 63 Street have violations?
Yes. NYC HPD has recorded 80 housing violations at this property.
Is 1754 63 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1754 63 Street built?
City records list 1931 as the year it was built.
How many apartments are in 1754 63 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.