Violations at 5922 18 Avenue
Brooklyn, NY 11204 · BBL 3-05511-0046 · Back to the property
HPD housing violations
4 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Open — Info nov sent out
DOB building violations
7 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Construction other optional
Failure to maintain building in code compliant manner; observed broken/rotted out ceiling joists in shipping and receiving part of building. condition first noted in ecb vio 39064458h issued in 2022.
Sep 15, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 10, 2006
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 28, 2006
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Dec 18, 1990
Vp*-violation unserved ecb- dismissed
ECB violations
13 ECB violations, newest first.
- Class - 1
Failure to maintain building in code compliant manner; observed broken/rotted out ceiling joists in shipping and receiving part of building. condition first noted in ecb vio 39064458h issued in 2022., repair an
Sep 15, 2025 · Penalty $25,000
Active - Class - 1
Failure to maintain building in code compliant manner; observed at exp 2, fire escape leads onto first floor roof and does not have a ladder/staircase that leads building occupants safely to the street in event
Sep 10, 2025 · Penalty $2,500
Active - Class - 1
Work without a permit; observed 2nd and 3rd floors have been remodeled. new staircases installed from ground lvl to 2nd fl, and 2nd fl to 3rd fl. new sheetrock installed throughout, along with new plumbing for
Sep 10, 2025 · Penalty $2,500
Active - Class - 1
Work without a permit; observed new electric ran throughout 2nd and 3rd floor office spaces. work is approx 80% complete. new lighting, outlets, and switches installed., obtain permit; stop all electrical work
Sep 10, 2025 · Penalty $2,500
Active - Class - 1
Work without a permit; observed on 2nd and 3rd floor of exp 4 (18th ave), double hung windows have been replaced with casement windows. awning at ground floor replaced with signage that reads "kurrent" and has
Sep 10, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code compliant manner; observed cornice on 18th ave side of building (exp 4) is in state of disrepair. cornice has holes and is showing signs of deterioration. conditions first s
Sep 10, 2025 · Penalty $5,000
Active - Class - 1
Upon inspection observed failure to maintain at exp.1/front, 2flr broken window panel with loose glass above sidewalk near mta bus stop. at exp.4/right, cornice has many holes due to deterioration & bricks are
Sep 12, 2022 · Penalty $1,250
Active - Class - 1
At time of inspection observed interior wall has cracks at multiple locations. also ceiling in disrepair condition at left corner of entry , sheathing damaged, joist rotted and one joist has crack., repair and/
Jun 21, 2022 · Penalty $1,250
Active - Hazardous
Failure to maintain bldg haz noted:part of ceiling aprox 15ft x 15ft was missing & wooden beams were exposed (sheetrock ceiling @ 1st fl location aprox 20fl of the front windows of the office of summit house
Jun 28, 2006 · Penalty $800
Resolve - Non-hazardous
50/ 50-gas meters in boiler room holes in boiler room ceiling & wall, no lighting in boiler room, debris on oil tank & in boiler room
Dec 23, 2005
Resolve - Non-hazardous
50/50-gas meters in boiler rm, holes in boiler rm ceiling & wall, no lighting in boiler rm, debris on oil tank & in boiler rm.b4a
Dec 23, 2005 · Penalty $180
Resolve - Non-hazardous
49a, 49b, 49a)no check valve (back flow prevention) on boiler feed line. 49b)to pipe dafety to ground boiler.
Jul 18, 2001 · Penalty $180
Resolve - Non-hazardous
Failure to maintain;there is no boiler enclosure in the cellar at thispremises. remedy:maintain/provide enclosure as per nyc builiding code.
Jul 18, 1991
Resolve