roofy

Violations at 1745 59 Street

Brooklyn, NY 11204 · BBL 3-05504-0060 · Back to the property

HPD housing violations

20 HPD violations, newest first.

  • BHazardous

    Properly repair the source and abate the evidence of a water leak at the ceiling in the private hallway located at apt 2, 1st story, 1st apartment from west at north

    Oct 3, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over ceiling and south wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2026 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2026 · Apt 2

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2026 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of entrance door sealed at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Oct 3, 2026 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective brick facade, opening at north exterior wall at building rear , 1st story

    Oct 3, 2026

    Open — Nov sent out
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at all wall outlets and ceiling fixtures in the 4th room from east located at apt 2ndflo, 2nd story, 2nd apartment from north at east

    Sep 4, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in vestibule area in the entrance located at apt 2ndflo lower level, 2nd story, 2nd apartment from north at east

    Sep 4, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of hot water for the fixtures at all fixtures in the entire apartment located at apt 2ndflo, 2nd story, 2nd apartment from north at east

    Sep 4, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Aug 28, 2026

    Open — Info nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, south and west walls, in the bathroom located at apt 2fl, 2nd story, 2nd apartment from west at north

    Aug 26, 2026 · Apt 2FL

    Open — Nov sent out
  • ANon-hazardous

    Cleanse to the satisfaction of this department the visible mold at caulking, grout joints of the ceramic tiles at east, south and west walls around bathtub, in the bathroom located at apt 2fl, 2nd story, 2nd apartment from west at north

    Aug 26, 2026 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing, in the entire apartment located at apt 2fl, 2nd story, 2nd apartment from west at north

    Aug 26, 2026 · Apt 2FL

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 2fl, 2nd story, 2nd apartment from west at north

    Aug 26, 2026 · Apt 2FL

    Open — Nov sent out
  • IInformation / order

    The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for cellar apartment, vacate #258947 at cellar

    Oct 29, 2024

    Open — Not complied with
  • BHazardous

    § 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy

    Oct 17, 2024

    Open — Not complied with
  • BHazardous

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas stove. at cellar

    Oct 17, 2024

    Open — Not complied with
  • BHazardous

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet .washbasin.shower stall. at cellar

    Oct 17, 2024

    Open — Not complied with

DOB building violations

No DOB violations on record

ECB violations

1 ECB violations, newest first.

  • Class - 1

    Occupancy contrary to that allowed by c of o and/or the department of buildings records. partitions erected creating an illegal class a apartment at cellar. rooms used for living. unlawful gas range also presen

    Oct 17, 2024

    Resolve