819 Mcdonald Avenue
Brooklyn, NY 11218BBL 3-05395-0070Map
Owner of record: Shiloah Srm INC
819 Mcdonald Avenue is a mixed residential and retail building built in 1920 in Brooklyn, 11218. It has 2 residential units across 3 floors. The owner of record is Shiloah Srm INC. HPD has recorded 17 housing violations here, most recently on December 30, 2025. 11 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 8
- ECB violations
- 4
- HPD complaints
- 11
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 30, 2025
Open — Info nov sent out - BHazardous
Remove all encumbrances consisting of airconditioner and household articles, at public hall, 3rd story
Dec 29, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking, grouts joints of the ceramic tiles at south, west and north walls around bathtub perimeter in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Dec 29, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Dec 29, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste pipes of the washbasin drainage, in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Dec 29, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of hotwater exceeded allowed temperature of the 130.f degrees at hotwater fixtures, in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Dec 29, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Dec 29, 2025 · Apt 3
Open — Invalid certification - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 square feet at the ceiling, in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Dec 29, 2025 · Apt 3
Open — Notice of issuance sent to tenant - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 29, 2025
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Dec 14, 2025 · Apt 3
Closed — Violation dismissed
Show 7 more ↓
- BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Nov 26, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...light fixture at ceiling at public hall, 3rd story
Nov 11, 2025
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in ...waste line at washbasin in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Nov 11, 2025 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ...caulking around bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Nov 11, 2025 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ...at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Nov 11, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ...missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Nov 11, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3fl, 3rd story
Oct 21, 2020 · Apt 3FL
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 5, 1993
Vw-violation work without permit - active
ECB violations · 4
- Class - 2
Work without a permit.work noted:1st flr rear erected a 3pc bathroom witha stall shower and a kitchen no stove observed.rem:obtain a permit
Jan 23, 2018
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate co.noted:1st flrrear class b apt no stove and a kitchen no stove c of o#306005 stae commercial.rem:dicontinue illegal all or amend c of o.
Jan 23, 2018 · Penalty $3,000
Resolve - Non-hazardous
Work without a permit work noted partitions erected at first story creating rooms 2 hung ceiling constructed at first story front section remedy obtan a pemrit if feasible or restore premeise to prior legal con
Nov 4, 1993 · Penalty $350
Active - Non-hazardous
Occupancy contrary to that allowed by the building dept records first floor from store to garment factory remedy obtain valid c of o or restore to prior legal use
Apr 5, 1993 · Penalty $350
Active
Complaints
- Heat/hot water
Apartment only
Dec 27, 2025 · Apt 3
Close - Plumbing
Basin/sink
Dec 27, 2025 · Apt 3
Close - Heat/hot water
Entire building
Dec 23, 2025 · Apt 3
Close - Plumbing
Basin/sink
Dec 17, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 3
Close - Plumbing
Basin/sink
Dec 11, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Nov 24, 2025 · Apt 3
Close - Plumbing
Basin/sink
Nov 7, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Oct 17, 2020 · Apt 3FL
Close - Heat/hot water
Apartment only
Oct 13, 2020 · Apt 3FL
Close
Show 1 more ↓
- Safety
Fire escape
Nov 20, 2017 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 4,400 ft²
- Lot area
- 2,500 ft²
- Zoning
- M1-1
- Community board
- 312
- Council district
- 40
- Block / lot
- 5395 / 70
- Assessed value
- $153,180
- Landmark / historic district
- No
Questions about 819 Mcdonald Avenue
Who owns 819 Mcdonald Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Shiloah Srm INC.
Does 819 Mcdonald Avenue have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 819 Mcdonald Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 819 Mcdonald Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 819 Mcdonald Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.