182 Ocean Parkway
Brooklyn, NY 11218BBL 3-05338-0009Map
Owner of record: Sajjid Rashid Abbasi
182 Ocean Parkway is a walk-up apartment building built in 1901 in Brooklyn, 11218. It has 3 residential units across 2 floors. The owner of record is Sajjid Rashid Abbasi. HPD has recorded 32 housing violations here, most recently on May 5, 2026. 3 of the 32 most recent violations are still open.
- HPD violations
- 32
- DOB violations
- 1
- ECB violations
- 0
- HPD complaints
- 1
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Feb 18, 2020 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. missing one way screws and brackets wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Jan 2, 2020 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall in the 3rd bathroom from east at south located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 3rd bathroom from east at south located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd bathroom from east at south located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation dismissed
Show 22 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the private hallway located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective lower sash glass with sharp edges at second window from north at east in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the 4th bedroom from east at north located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st door frame from south at west wall, ceiling in the foyer located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south wall, north wall in the private hallway located at apt 3, 3rd story, 1st apartment from west at north
Nov 21, 2019 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 2nd story
Nov 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 2nd story
Nov 13, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 2nd story
Nov 13, 2019
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 2nd story
Nov 13, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 2nd story
Nov 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 2nd story
Nov 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 2nd story
Nov 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 8, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 8, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 8, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Nov 8, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 8, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ,, at public hall, 1st story
Nov 8, 2019
Closed — Violation dismissed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Sep 19, 2019 · Apt 3
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 13, 2015
Closed — Violation dismissed
DOB building violations · 1
- Construction other optional
Work without a permit. noted: in the 1st floor kitchen wooden lath ceiling and metal lath wall respectively 8ft. x 12ft. and 6ft. x 4ft are being removed. remedy: stop all work. make safe. call dob prior to return to work. obtain permit
Jul 12, 2007
Vw*-violation - work w/o permit dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Window frame
Aug 30, 2019 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 2
- Residential units
- 3
- Building area
- 3,420 ft²
- Lot area
- 2,400 ft²
- Zoning
- R7A
- Community board
- 312
- Council district
- 39
- Block / lot
- 5338 / 9
- Assessed value
- $130,500
- Landmark / historic district
- No
HPD registration #370999, last renewed Nov 18, 2025.
Questions about 182 Ocean Parkway
Who owns 182 Ocean Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Sajjid Rashid Abbasi.
Does 182 Ocean Parkway have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 182 Ocean Parkway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 182 Ocean Parkway built?
City records list 1901 as the year it was built.
How many apartments are in 182 Ocean Parkway?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.